a   4°

      ,            INTEGRATED PLANNING ACT 1997                                                                                IDAS Assessment Checklist, Version 20, 2 April 2007
                   Whether particular buildings may be       |16. An application to use an existing building that is not class 1, 2, 3 or 4 for residential purposes may trigger a
                   occupied for residential purposes               referral to the local government as the concurrence agency.
                  For more information go to schedule 2 table 1 of the
                  | JP Regulation.
                   Assessment period 15 days. No response is a
                   deemed refusal.
                   Design and siting                         17.  An application may trigger referral to the local government as the concurrence agency if the building work
                   For more information go to schedule 2 table 1 of the does not comply with the performance criteria of parts 11 and 12 of the Queensland Development Code.
                  IP Regulation.                             18.   An application may trigger referral to the local government as the concurrence agency if the building work
                   Assessment period 5 days. No response is a      does not comply with the qualitative statement for building clearance and site cover.
                   deemed refusal,                           19.   An application may trigger referral to the local government as the concurrence agency if the building work
;                                                                  does not comply with the qualitative statement for performance criteria 4, 5, 7, 8 or 9 of the Queensland
                                                                   Development Code, part 11 or 12.
                   Fire safety in particular budget          20.   An application may trigger referral to the local government as the concurrence agency to determine the
                   accommodation buildings                         building will comply with the fire safety standard under the Building Act 1975 when the building work has
                   For more information go to schedule 2 table 4 of the been completed.
                  {P Regulation.
                  Assessment period 15 days. No response is a
                   deemed refusal,
                   Higher risk personal appearance           21.   An application may trigger referral to the local government as the concurrence agency to determine if the
                   services                                        building work
                   For more information go tp schedule 2 table 1 of the ¢ — complies with the performance criteria of the Queensland Development code part 15; and
                  IP Regulation and the QOC part 15.              « — the work does not comply with an acceptable solution stated in the part.
                  Assessment period 15 days. No response is a
       @          deemed refusall.
                   Building work for residential service | 22.     An application for building work for premises in which residential care service under the Residential
                   For more information go to schedule 2 table 1 of the Services (Accreditation) Act 2002, section 4, is conducted, or is proposed to be conducted, will trigger
                  IP Reguiation and the QDC part 20. .             referral to the local government as the concurrence agency.
                  Assessment period 15 days. No response is a
                   deemed refusal.
                   Building work for removal or              23,   An application for the removal and/or rebuilding at another site of a building or other structure, will trigger
                   rebuilding                                      teferral to the local government as the concurrence agency.
                  For more information go to schedule 2 table 1 of the
                   IP Regulation,
                   Assessment period 5 days. No response is a
                   deemed refusal.
                   Building work for rainwater tank in       24.   An application may trigger referral to the local government as the concurrence agency to determine if the
                   designated rainwater tank area                  building work or structure complies with the relevant performance criteria if -
                   For more information go to schedule 2 table t of the * Under the Building Regulation 2006, a rainwater tank is proposed to be installed as part of relevant
                   1P Regulation and the QDC part 25.                  building work, in a designated rainwater tank area; and
                   Assessment period 15 days. No response Is a     «   Under the Queensland Development Code, part 25, the rainwater tank does not include an acceptable
                   deemed refusal                                      solution for a relevant performance criteria.

                                                                                                   Page 16

Used in these records

About this file

File size
3.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015205E.001.pdf · 3.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.