Skip to the record
The gold standard in government transparency.

Council archive · source document

0015205E.001

of 43

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

A
so
uf                                                                                                       .
                       INTEGRATED PLANNING ACT 1997.                                                                 IDAS Assessment Checkist, Version 18.0, 10 November 2006
                        :      .  a |   ss .                                              i ‘   “  ~.      .       |          7             te .            —        :
                       YAAXQY                    Ran? DevchpmantApiection                                                    fo          ARE Ee                  tees

                                Mf                                                           ssessmen
                       /                                                        Checklist                                                                             |
                         g                       .                                                                 a.
                       7
                                                                                 (Formerly the “Referrals Checklist”)
                                                                         .                                           .
                      IMPORTANT NOTE FOR ALL APPLICANTS:                                        ,                                 ‘
                       1. This checklist was formerty referred to as the “Referrais Checklist’. Some of the ‘Guides’ to using the IDAS Application Farms continue tn refer to this document as the
                           ‘“Referrats Checklist”. The name of this checklist was changed from 25 July 2005 to more accurately describe its function.
                      2    Under the IPA and IDAS framework, an apptication may require assessment by the local Council and/or certain Queenstand State entities (e.9. Environmental Protection
                           Agency, Dept. of Natural Resources, Mines and Water, Queenstand Heritage Council ete,).
                      3.   This checklist is provided to assist applicants to determine when an application requires assessment by a Queensland State entity and may also assist the applicant to
                           determine the assessment manager" for the apptication.
                      4. — Therefore, the completion of all questions in section 1 of this checklist is mandatory for ail applications {other than those requiring the completion of Parts A & B only).
                      5.   [ts the responsibility of the appticant to accurately complete this checklist.
        @            6.    Depending on the nature of the application, an applicable State entity may be either the assessment manager or an IDAS referrat agency for the application.
        .             7. _ The assessment manager for the apptication will rely on the information provided in this checklist (as well as any material lodged in support of the application} to identify
                          any applicable referral agencies for the apptication in the Acknowledgement Notice. The assessment manager will also rely on this Information when identifying f the ‘
                          appiication triggers referral coondination2.                 ,
                      8.   To assist you in answering the following questions a series of guides are available free from the IPA website www,ipa.gid. qov.au. Guide 25 explains the rote of the DAS
                          Assessment Checklist in the IDAS application process, and its retationship to the Form 1 development application.
                 -    9.  Any other parts of Form 1 that this checktist requires to be compieted ere available from the Council or the applicable State entity, or can be downloaded free from
                           www.ipa.qid.gov.ay.
                      10.  Section 2 on page 10 provides advice about the referrats that can be required for applications for building work assessable against the Bulkiing Regulation 2006.
                                                  SECTION 1 - STATE ASSESS                           a j    completion mandatory)
                      Note: The following state assessment triggers apply to devel come nat maT O att haw ia eacsessable against the Building Reguiation 2006.
                      Environmentally relevant activity      @      if 1    Riad   Se: Gear                 Boxes)                                |
                     Foremore information refer Guides.             Ry       hte                 elevent activity (ERA) for which @ code for environmental compliance.
                      sate aah       teen Re” OO RAD                    BR for been made - complete Pat G of Form 1
                     achninistering authority’.                     LJ {ii) amobile or temporary ERA for which a code of environmental compliance has nof been
                     Kaneedy, ober than tho acing ates                      made - complete Pert G of Form 1
                      dhiisterng uberis ba conconence soetcn for        (ii) none of the above                                                                   .
                     the eppication in relation to this matter.
                     Note: An eppication involving ERA 19 endfor 20 will
                    eso requirs compietion of Pert Ky of Form 1 for
       ©             epprovel where an allocation under the Water Act
                     2000 & required.                                                                                                                         *
                      State-contro!led road matters           2.    The application involves: (tick applicable box/es)
                     For more information refer to Guide 3.
                     Unless you     snsnrad name of Cw above” 02, the (1 (i) development on land contiguous’ to a State controlled road and for -
                     appfication oven referral othe Repeat st               (CZ) (a) material change of use assessable against the planning scheme;
                      tn ceva ctcumstances OMR wil be en advise             (9 (b) reconfiguring a fot unless -
                     agency, whte in other crcumstances DMR will be a              » the total number of lots is not increased; and
                      :      ooeer         ion wil eacist you                      » the total number of lots abutting the State-controlled road is not increased;
                     determine where DMR is an advice or concurrence        C) (c) operational work (not associated with e material change of use assessable egainst the
                     agency forthe appication.                     }               planning scheme or reconfiguring @ lot mentioned in (b) above)~
                                                                 ’                 e associated with access to a State-controlied road; or
                                                                                   © for filling or excavation; or
                                                                                   « involving the redirection or intensification of site stormwater from the land, through a
                                                                                     pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
                                                                                     State-controlled road.                       .

                     1 The assessment manager is responsible for assessing and deckting an IDAS appfication. The assessment manager for en application is prescribed in schedule 8A of the IPA,
                    2 For additional information refer to Guide 6 Does my application trigger the referral coordination process?’
                    3 Faeries Ooo dapat Cage       cin Me Envtenmenta Protecdon Agency, the elvan oat grvernment (os 8 dewoWed ERA) or he Guoensiand Deparment of Prinary Indusies ond
                       Fisheries (lor s delegated ERA),
                    4 Land contiguous to a State-controtied road is defined in schedute 14 of the IP Reguiation to mean land - if part of the tand is within 100m of the Stsie-controled road; or that is part of a future State-
                      contofied road.
                                                                                                  Page 1

Used in these records

About this file

File size
3.6 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

0015205E.001.pdf · 3.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.