Delegated Report - Code - Planning MCU24 0001 · MCU24/0001

of 22

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (14.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                      Landscaping Works
               18.    The development site must be landscaped in accordance with the PSP2 – Landscaping. The
                      works must be undertaken in accordance with Operational Works approval OPW24/0003
                      and Noosa Plan for that specific area and must include in particular:
                           a.     the works generally shown on the Approved Plans except where varied by the
                                  conditions of this approval.
               19.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
                      Waste Management
               20.    A waste storage area must be provided in accordance with Planning Scheme Policy 9, Waste
                      Management and the Noosa Plan’s Waste Management Code, including an external
                      imperviously paved area correctly sized for all refuse and recycling containers and suitably
                      screened from public places and neighbouring properties.
                      Community Management Statement
               21.    Any proposed Community Management Statement required for the development pursuant to
                      the Body Corporate and Community Management Act 1997 must be submitted to Council for
                      endorsement at the same time as submission of the Building Format Plan (or similar) to
                      Council for compliance assessment.
               22.    All clauses and by-laws of the proposed Community Management Statement must accord
                      with the requirements of this Decision Notice and, in particular, must include the following
                      additional clauses:
                      a.        The dwelling units are not permitted to be used for short term accommodation, unless
                                where identified as accepted development by the Noosa Plan or where there is a
                                Development Permit for Material Change of Use for Short Term Accommodation in
                                effect. Short term accommodation means the use of the premises for providing
                                accommodation of less than 3 consecutive months to tourists or travellers.
               ENGINEERING
                      Site Access and Driveways
               23.    A sealed access driveway must be provided from Jan Street and Banksia Avenue to all
                      parking and manoeuvring areas of the development. The works must be undertaken
                      generally in accordance with the conditions of this approval and be generally in accordance
                      with ARCOS’ Development Site Plan (OPW-C-301, Rev. A) dated 18 December 2023.
                      Car Parking
               24.    A minimum of 3 car parking spaces must be provided on the site. The works must include a
                      minimum of 2 covered spaces.
                      Stormwater Drainage
               25.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken generally in accordance with the conditions of
                      this approval, be generally in accordance with ARCOS’ Development Site Plan (OPW-C-301,
                      Rev. A) dated 18 December 2023, and must include in particular:
                      a.        3,000L of on-site rainwater retention per tenancy for reuse purposes.
                      Services
               26.    Underground reticulated electricity and telecommunication services must be provided to
                      each lot in accordance with the standards and requirements of the relevant service provider.



                                                                                                        Page 14 of 22

Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024

Used in these records

About this file

File size
14.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Delegated Report - Code - Planning MCU24 0001.pdf · 14.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.