Landscaping Works
18. The development site must be landscaped in accordance with the PSP2 – Landscaping. The
works must be undertaken in accordance with Operational Works approval OPW24/0003
and Noosa Plan for that specific area and must include in particular:
a. the works generally shown on the Approved Plans except where varied by the
conditions of this approval.
19. All landscape works must be established and maintained in accordance with the approved
design for the life of the development, and in a manner that ensures healthy, sustained and
vigorous plant growth. All plant material must be allowed to grow to full form and be
refurbished when its life expectancy is reached.
Waste Management
20. A waste storage area must be provided in accordance with Planning Scheme Policy 9, Waste
Management and the Noosa Plan’s Waste Management Code, including an external
imperviously paved area correctly sized for all refuse and recycling containers and suitably
screened from public places and neighbouring properties.
Community Management Statement
21. Any proposed Community Management Statement required for the development pursuant to
the Body Corporate and Community Management Act 1997 must be submitted to Council for
endorsement at the same time as submission of the Building Format Plan (or similar) to
Council for compliance assessment.
22. All clauses and by-laws of the proposed Community Management Statement must accord
with the requirements of this Decision Notice and, in particular, must include the following
additional clauses:
a. The dwelling units are not permitted to be used for short term accommodation, unless
where identified as accepted development by the Noosa Plan or where there is a
Development Permit for Material Change of Use for Short Term Accommodation in
effect. Short term accommodation means the use of the premises for providing
accommodation of less than 3 consecutive months to tourists or travellers.
ENGINEERING
Site Access and Driveways
23. A sealed access driveway must be provided from Jan Street and Banksia Avenue to all
parking and manoeuvring areas of the development. The works must be undertaken
generally in accordance with the conditions of this approval and be generally in accordance
with ARCOS’ Development Site Plan (OPW-C-301, Rev. A) dated 18 December 2023.
Car Parking
24. A minimum of 3 car parking spaces must be provided on the site. The works must include a
minimum of 2 covered spaces.
Stormwater Drainage
25. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with the conditions of
this approval, be generally in accordance with ARCOS’ Development Site Plan (OPW-C-301,
Rev. A) dated 18 December 2023, and must include in particular:
a. 3,000L of on-site rainwater retention per tenancy for reuse purposes.
Services
26. Underground reticulated electricity and telecommunication services must be provided to
each lot in accordance with the standards and requirements of the relevant service provider.
Page 14 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU24 0001.pdfRelated documentApplication case desk ↗
About this file
- File size
- 14.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.