Delegated Report - Code - Planning MCU24 0001 · MCU24/0001
Very large file (14.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
27. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
28. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
29. Unless otherwise agreed in writing by the relevant service provider, any public or third party
infrastructure located on the subject site must be placed within an easement registered
against the title of the property.
30. All easements must be designed in accordance with the planning scheme and granted at no
cost to the Grantee. Where the Grantee is Council or a service authority, the easement
documentation must be in accordance with the Grantee’s standard easement terms. Draft
easement documentation must be submitted to Council for endorsement.
31. All works must be kept clear of any existing or proposed easements on the subject land,
unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
32. All earthworks and associated retaining structures/batters, both above and below ground,
both temporary and permanent, must be undertaken generally in accordance with the
conditions of this approval, be generally in accordance with ARCOS’ Earthworks Plan (OPW-
C-201, Rev. A) dated 18 December 2023, and be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to Council.
33. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
OPW24/0003 – DEVELOPMENT PERMIT FOR OPERATIONAL WORKS
(EARTHWORKS, STORMWATER, LANDSCAPING & CROSSOVER)
APPROVED PLANS
34. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
OPW-C-201 A Earthworks Plan prepared by ARCOS 18.12.2023
OPW-C-301 A Development Site Plan prepared by ARCOS 18.12.2023
LD1 A Drawing Schedule Specifications prepared by Bird 16.12.2023
Landscape Design
LD2 A Finishes and Planting Schedules Prepared by Bird 16.12.2023
Landscape Design
LD3 A Details prepared by Bird Landscape Design 16.12.2023
LP1 A Planting Plan – Ground Floor Prepared by Bird 16.12.2023
Landscape Design
Page 15 of 22
Document Set ID: 22769918
Version: 5, Version Date: 10/04/2024
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Delegated Report - Code - Planning MCU24 0001.pdfRelated documentApplication case desk ↗
About this file
- File size
- 14.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.