Original source · versioned page text
SUPERSEDED - Decision Notice - DBW23 0056 & RAP23 0010 [As Published]
Resubmission of Amended Plans Required
4. The conditions of this Decision Notice require resubmission of plans to Council with
amendments. Please address the amended plan/s to Council’s Development Assessment
Branch with the Reference No. DBW23/0056 & RAP23/0010, separate to any Operational
Works application. To avoid delays and assessment issues with the Operational Works
application, it is recommended the plan/s be resubmitted prior to lodgement of any
Operational Works application. However, should the plans not be submitted, the applicant is
advised that a Preliminary Approval may be issued in lieu of a Development Permit.
Sustainability
5. Council encourages sustainable and energy efficient building design for all development,
including the use of sustainable building materials, energy efficient fittings, solar hot water,
photovoltaic systems (including the use of inverter/charges), solar panels, water saving
devices and rainwater harvesting.
Mean Height
6. Mean height means the vertical height as defined by the Queensland Development Code.
Fires in Urban Areas
7. In urban areas fires are prohibited except where in an appliance is used for domestic heating
or cooking purposes, which must comply with particular standards. Any area identified as a
fire pit area on approved plans is to be in accordance with Local Law & Subordinate Local
Law No. 3, Schedule 3. Refer to the following link for details:
https://www.noosa.qld.gov.au/community/local-laws/local-laws-overview
Infrastructure Charges
8. All developments and/or changes to existing developments may require payment of
“Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
made pursuant to the planning legislation and regulations current at the time of issue. For
further information, please refer to https://www.noosa.qld.gov.au/planning-
development/development-tools-guidelines/infrastructure-charges
7. PROPERTY NOTES
Not applicable.
8. VARIATION APPROVAL DETAILS
Not applicable.
9. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Operational Works Driveway
Development Permit for Building Works All building works.
10. SUBMISSIONS
Not applicable.
11. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Page 6 of 8
Document Set ID: 22631865
Version: 3, Version Date: 23/10/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original