Town Planning Report and Appendices - Cooroibah

Attached to the e-mail Development Permit – 23 Jirrima Crescent, Cooroibah MCU16/0099.

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Planning Report
Proposed Fixed Wireless Facility

23 Jirrima Crescent

Cooroibah QLD 4565


nbn Site Reference:

NBN-4BBZ-4GYM-5136 - Cooroibah
Log in to download the original file

Town Planning Report and Appendices - Cooroibah.pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of pages 2 to 119 (of 195)

Page 2

Disclaimer
This document is provided for information purposes only. This document is subject to the
information classification set out on this page. If no information classification has been included,
this document must be treated as UNCLASSIFIED, SENSITIVE and must not be disclosed other
than with the consent of nbn. The recipient (including third parties) must make and rely on their
own inquiries as to the currency, accuracy and completeness of the information contained herein
and must not use this document other than with the consent of nbn co.
© 2015 nbn co limited. All rights reserved.


Document control

Document information

Document type               Planning Assessment Report
Author                      Alexandra Gaynor
Approver (owner)            Lisa Shields (Project Manager)
Status                      Final Report
Issue date                  18/08/2016
Revision number             3
Classification              UNCLASSIFIED



Revision history


Date             Revision          Details
27/02/2016       1                 Draft Report
18/08/2016       2                 Draft Report
18/08/2016       3                 Final Report




Page 2

Page 3

Contents
     Executive Summary                                                           5

1.   INTRODUCTION                                                                6

2.   BACKGROUND                                                                  8

     2.1   nbn and the National Broadband Network                                8

     2.2   What is Fixed Wireless and how is it different to Mobile Broadband?   8

     2.3   The Fixed Wireless Network – Interdependencies                        9

3.   SITE SELECTION                                                              11

     3.1   Identification of areas requiring Fixed Wireless coverage             11

     3.2   Site Selection Parameters                                             11

     3.3   Candidate Sites                                                       12

4.   SUBJECT SITE & SURROUNDS                                                    18

     4.1   Site Details                                                          18

     4.2   Site Surrounds                                                        20

5.   THE PROPOSAL                                                                22

     5.1   Facility and Equipment Details                                        22

     5.2   Site Selection                                                        26

6.   CURRENT PLANNING CONTROLS                                                   28

     6.1   Commonwealth Legislation                                              28

     6.2   Queensland Planning Legislation and Guidelines                        29

     6.3   Local Government Regulatory Framework                                 37

7.   PLANNING CONSIDERATIONS                                                     41

     7.1   Desired Environmental Outcomes                                        41

     7.2   Applicable Codes                                                      46

8.   OTHER ENVIRONMENTAL CONSTRAINTS AND OPPORTUNITIES                           61

     8.1   Visual Impact                                                         61

     8.2   Heritage                                                              68

     8.3   Electrical Interference and Grounding of the Facility                 68

     8.4   Erosion, Sedimentation Control and Waste Management                   68

     8.5   Traffic Generation                                                    69

     8.6   Utility Services                                                      69

     8.7   Noise                                                                 69

     8.8   Flora and Fauna                                                       69

     8.9   Endangered Species                                                    71

     8.10 Social and Economic Impacts                                            71

     8.11 Public Safety                                                          71



Page 3

Page 4

     8.12 The Public Interest and the Benefits of Telecommunications   72

9.   CONCLUSION                                                        74

Appendix A - Proposal Plans                                            75

Appendix B - Copy of Title                                             76

Appendix C - Code Table Assessment                                     77

Appendix D - Environmental Searches                                    101

Appendix E - ARPANSA EME Report                                        102

Appendix F - SDAP Code Assessment                                      103

Appendix G – Letter to Council                                         104




Page 4

Page 5

Executive Summary


 Proposal              nbn propose to install a new Fixed Wireless facility at
                       Cooroibah comprised of the following:

                             45 m monopole;
                             1 X parabolic dish antenna;
                             3 X panel antennas;
                             1 X outdoor units (ODU) at ground level (outdoor
                              cabinets);
                             2.4m high chain link security compound fencing;
                              and
                             Ancillary equipment associated with operation of the
                              facility, including cable trays, cabling, safe access
                              methods, bird proofing, earthing, electrical works
                              and air-conditioning equipment.

 Purposes
                       The proposed facility is necessary to provide nbn™ Fixed
                       Wireless coverage to Cooroibah.

 Property Details      Lot & Plan No: Lot 47 on RP136461
                       Street Address: 23 Jirrima Crescent, Cooroibah QLD 4570
                       Property Owner: Rebekah Georgina Timms

 Town Planning         Council: Noosa Council
 Scheme                Planning Scheme: The Noosa Plan
                       Zone: Rural Settlement Zone
                       Use Definition: Infrastructure Use – Service and Utility
                       (Type 3 Tower)


 Applicable Planning   Relevant State & Local Planning Policies      Complies
 Policies
                       South-East Queensland Regional Plan           Yes
                       State Planning Policy                         Yes

                       The Noosa Plan                                Yes

 Application           Use and development of the land for the purposes of
                       construction & operation of a Telecommunications Facility
                       (Fixed Wireless facility)

 Applicant
                       nbn Co Limited (nbn)
                       c/- Aurecon
                       Locked Bag 331, Brisbane QLD 4001
                       Contact: Kelly Pickering
                       Our Ref: NBN-4BBZ-4GYM-5136 - Cooroibah




Page 5

Page 6

1. INTRODUCTION
nbn has engaged Ericsson as the equipment vendor and project manager to
establish the infrastructure required to facilitate the Fixed Wireless component of
the National Broadband Network (nbn™). Ericsson has in turn engaged Aurecon
to act on its behalf in relation to the establishment of the required Fixed Wireless
network infrastructure.

The nbn™ is an upgrade to Australia’s existing telecommunications network. It
is designed to provide Australians with access to fast, affordable and reliable
internet and landline phone services.

nbn™ plans to upgrade the existing telecommunications network in the most
cost-efficient way using best-fit technology and taking into consideration existing
infrastructure.

To support the Fixed Wireless component of this network, nbn™ requires a Fixed
Wireless transmission site to provide Fixed Wireless internet coverage to
Cooroibah.

An in-depth site selection process was undertaken in the area prior to confirming
the site as the preferred location. This process matched potential candidates
against four key factors, namely:
         •   Town planning considerations (such as zoning, surrounding land uses,
             environmental significance and visual impact);
         •   The ability of the site to provide acceptable coverage levels to the
             area;
         •   Construction feasibility; and
         •   The ability for nbn to secure a lease agreement with the landowner.

This application seeks planning consent for:
    •    a 45 m high monopole;
    •    radio transmission equipment; and
    •    ancillary equipment shelter;

located on Lot 47 on RP136461, described as 23 Jirrima Crescent, Cooroibah
QLD 4570.




Page 6

Page 7

This submission will provide assessment in respect of the relevant planning
guidelines, and demonstrates site selection on the basis of:
   •     The proposal is designed so as to be appropriately located & sited so as to
         minimise visual impact on the immediate & surrounding area;
   •     The proposal is designed to comply with The Noosa Plan and
         Sustainable Planning Act 2009;
   •     The proposal is designed to achieve the required coverage objectives for
         the area;
   •     The proposal is designed to operate within the regulatory framework of
         Commonwealth, State and Local Government; and
   •     The proposal is designed to operate within all current and relevant
         standards and is regulated by the Australian Communications and Media
         Authority.




Page 7

Page 8

2. BACKGROUND

2.1 nbn and the National Broadband Network

nbn is the organisation responsible for overseeing the upgrade of Australia’s
existing telecommunications network and for providing wholesale services to
retail service providers. The nbn™ is designed to provide Australians with access
to fast, affordable and reliable internet and landline phone services.

nbn plans to upgrade the existing telecommunications network in the most cost-
efficient way using best-fit technology and taking into consideration existing
infrastructure.

The nbn™ Fixed Wireless network will use cellular technology to transmit signals
to and from a small antenna fixed on the outside of a home or business, which is
pointed directly towards the Fixed Wireless facility.

nbn™ Fixed Wireless network is designed to offer service providers with
wholesale access speeds of up to 25Mbps for downloads and 5Mbps for uploads. 1



2.2 What is Fixed Wireless and how is it different to Mobile
    Broadband?

The nbn™ Fixed Wireless network, which uses advanced technology commonly
referred to as LTE or 4G, is engineered to deliver services to a fixed number of
premises within each coverage area.

This means that the bandwidth per household is designed to be more consistent
than mobile wireless, even in peak times of use.

Unlike a mobile wireless service where speeds can be affected by the number of
people moving into and out of the area, the speed available in a Fixed Wireless
network is designed to remain relatively steady.




1
  nbn is designing the nbn™ to provide these speeds to our wholesale customers, telephone and internet
service providers. End user experience including the speeds actually achieved over the nbn™ depends on some
factors outside nbn control like equipment quality, software, broadband plans and how the end user’s service
provider designs its network.



Page 8

Page 9

2.3 The Fixed Wireless Network – Interdependencies

Although Fixed Wireless facilities are submitted to Council as standalone
developments from a planning perspective, they are highly interdependent. Each
Fixed Wireless facility is connected to another to form a chain of facilities that
link back to the fibre network. This is called the ‘transmission network’.

The transmission network requires line of sight from facility to facility until it
reaches the fibre network. The Fixed Wireless network will remain unconnected
without the transmission network and a break in this chain can have flow on
effects to multiple communities.

A typical Fixed Wireless facility will include three antennas mounted above the
surrounding area. Each antenna is designed to cover a set area to maximise
signal strength. These network antennas communicate to a small antenna
installed on the roof of each customer’s home or business.

The proposed Fixed Wireless facility at Cooroibah is a Transmission End Site and
has been designed to provide wireless broadband services to surrounding
premises in Cooroibah. The character of the Fixed Wireless network is visually
demonstrated through Figure 1 below.




Page 9

Page 10

          Figure 1: The Fixed Wireless network




Page 10


[OCR of page images]
 

Physical connection
to optical fibre — the
fibre spur

Fixed wireless facility —
the Fibre Hub

' Transmission signal

Facility coverage area ' connecting the facilities

Fixed wireless facility
- wireless hub site

Transmission signal / \ Transmission signal
connecting the facilities 7 \ Connecting the facilities
‘ \

   
   

Fixed wireless facility
- transmission end site

Fixed wireless facility
-transmission end site

Facility coverage area

Figure 1: The Fixed Wireless network

Page 10

Page 11

3. SITE SELECTION
Planning for a new Fixed Wireless broadband facility is a complex process. nbn
conducts a rigorous multi-stage scoping process, as outlined below.


3.1 Identification of areas requiring Fixed Wireless coverage

nbn™ Fixed Wireless locations are determined by a number of factors including
the availability of both the nbn™ Fibre transit network and the availability of
Point of Interconnect (POI) facilities to allow for the installation of nbn™ fibre
equipment. nbn™ uses a number of methods to identify those parts of Australia
that require Fixed Wireless coverage. When an area is identified as requiring
Fixed Wireless coverage, investigations are undertaken to determine the
measures required to provide this coverage.

nbn has identified a requirement to provide a Fixed Wireless facility at
Cooroibah. The facility is designed to provide Fixed Wireless internet services to
more than 180 premises across the larger-lot, rural-residential area of
Cooroibah.


3.2 Site Selection Parameters

nbn generally identifies an area where the requirement for a Fixed Wireless
facility would be highest, a ‘search area.’ A preliminary investigation of the area
is then undertaken, in conjunction with planning and property consultants,
radiofrequency engineers and designers in order to identify possible locations to
establish a facility.

Generally speaking, new sites must be located within, or immediately adjacent
to, the identified search area in order to be technically feasible. However, while
the operational and geographical aspects of deploying new facilities are primary
factors, there are also many other issues that influence network design, which
have to be resolved in parallel.

Some of the issues that may be considered include visual amenity, potential co-
location opportunities, the availability and suitability of land as well as a willing
site provider, occupational health and safety, construction issues (including
structural and loading feasibility and access for maintenance purposes),
topographical constraints affecting network line of site, legislative policy
constraints, environmental impacts, and cost implications.




Page 11

Page 12

The number, type and height of facilities required to complete the Fixed Wireless
network are largely determined by the above operational, geographical and
other factors discussed that influence final network design. These compounding
factors often severely restrict the available search area within which a facility
can be established to provide Fixed Wireless internet services to a local
community.


3.3 Candidate Sites
          Opportunities to Co-locate

The objective for the Cooroibah site is to provide coverage to as many premises
as practicable in the community of Cooroibah. It should be noted that nbn has
attempted to utilise where possible as a first preference, any existing
infrastructure or co-location opportunities. In this instance, the existing 30 m
Telstra facility located at 1 Illoura Place, Cooroibah was investigated (refer to
Figure 2).

The height required by nbn for the Cooroibah site is determined by a
combination of coverage objective to the community of Cooroibah coupled with
the need to have microwave connectivity back to the broader nbn™ network via
the proposed nbn™ facility at Cootharaba.

In this case, from a network performance and coverage perspective, a height of
45 m is required to adequately service the community of Cooroibah and a
minimum height of 37 m is required to connect back to the proposed Cootharaba
facility. Given that neither of these heights can be achieved by co-locating on
the existing Telstra facility as it is only 30 m in height, the co-location option is
therefore considered unfeasible from a technical perspective, and was
discounted.




Page 12

Page 13

                  Figure 2: Opportunities to co-locate in the Cooroibah area


          Existing Structures

Where possible, nbn have looked for opportunities to utilise other forms of
existing infrastructure to ‘co-site’. Using desktop analysis and site inspection, no
opportunities for ‘co-siting’ were identified.

          Greenfield Candidates

Following the identification of the search area, several candidate sites were
examined. Each candidate was assessed based on the ability to meet the
coverage objectives and site considerations detailed above. A total of four (4)
candidates were selected by both nbn and Noosa Council for in-depth
investigation, as per Figure 3 below. nbn endeavours to avoid locating search
areas in close proximity to residential localities and potentially sensitive land
uses, where practicable. The Cooroibah area is comprised predominantly of rural
residential land uses, with smaller lot, residential properties concentrated within
the Cooroibah township to the west. As such, it is considered that the eastern
area of Cooroibah provides an appropriate location on the periphery of the



Page 13

Page 14

township for development of a new facility, while still being capable of servicing
the targeted premises.




                                Figure 3: nbn Candidate Sites


A detailed assessment of the above-shown candidates was provided to Council
on February 24, 2016 prior to the lodgement of this development application
(refer to Appendix G – Letter to Council). A summary of the four (4)
candidates is set out in Table 1 below.

Table 1: Alternative Candidate Assessment


Candidate    Site Address            Proposed                   Description
                                  Structure Type

     A      23        Jirrima     45 m monopole     nbn investigated locating a 45 m
            Crescent,                               monopole at 23 Jirrima Crescent,
            Cooroibah                               Cooroibah.

                                                    Out of the four (4) candidates
                                                    considered, Candidate A provided the
                                                    greatest   separation  distance   to



Page 14

Page 15

Candidate    Site Address         Proposed                       Description
                               Structure Type
                                                   nearby dwellings and roads. The
                                                   closest dwelling to this proposed
                                                   location is approximately 220 m to
                                                   the north-east.
                                                   Furthermore, mature vegetation on
                                                   the subject site, and within the
                                                   surrounding area and road corridors,
                                                   will provide screening benefits to the
                                                   proposed facility, reducing its visual
                                                   dominance in the landscape.
                                                   This location also enables the height
                                                   of the proposed facility to be
                                                   restricted to 45 m and a slim-line,
                                                   monopole      structure     whilst   still
                                                   achieving coverage to all the targeted
                                                   localities and obtaining line of sight to
                                                   other planned sites in the nbn™
                                                   wireless network; and

                                                   As such, Candidate A has been
                                                   selected as the prime candidate.


                                                   nbn investigated co-locating on the
     B      1 Illoura Place,   Telstra co-locate
                                                   existing Telstra tower at 1 Illoura
            Cooroibah
                                                   Place, Cooroibah.

                                                   The height required by nbn for the
                                                   Cooroibah site is determined by a
                                                   combination of coverage objective to
                                                   the community of Cooroibah coupled
                                                   with the need to have microwave
                                                   connectivity back to the broader
                                                   nbn™ network via the proposed
                                                   nbn™ facility at Cootharaba.

                                                   In this case, from a network
                                                   performance          and      coverage
                                                   perspective, a height of 45 m is
                                                   required to adequately service the
                                                   community of Cooroibah and a
                                                   minimum height of 37 m is required
                                                   to connect back to the proposed
                                                   Cootharaba facility. Given that neither
                                                   of these heights can be achieved by
                                                   co-locating on the existing Telstra
                                                   facility as it is only 30 m in height,
                                                   the co-location option is therefore



Page 15

Page 16

Candidate    Site Address        Proposed                   Description
                              Structure Type
                                               considered    unfeasible     from   a
                                               technical   perspective,    and   was
                                               discounted.


     C      12        Lake    45 m monopole    nbn investigated locating a 45 m
            Cooroibah                          monopole at 12 Lake Cooroibah Road,
            Road,                              Cooroibah.
            Cooroibah
                                               Due to its location further south of
                                               the targeted service area, it was
                                               determined that a facility in this
                                               location would not provide reliable
                                               service to the targeted premises in
                                               Cooroibah.

                                               This proposed location is likely to
                                               result   in   degraded      coverage/a
                                               complete loss of service to numerous
                                               properties,    particularly   premises
                                               along Murchinson Lane and McKinnon
                                               Drive. Premises in these areas would
                                               receive a signal strength that is 1/10th
                                               the signal strength that Candidate A
                                               can deliver, which represents an
                                               extremely week signal incapable of
                                               connecting those properties to the
                                               Fixed Wireless network.

                                               As such, Candidate C was determined
                                               to be unfeasible, and was discounted.


     D      Northern end of   45 m monopole    nbn investigated locating a 45 m
            Lake Cooroibah                     monopole at the northern end of Lake
            Road.                              Cooroibah Road.
                                               This particular area was subject to a
                                               higher      density      of    existing
                                               development      in    comparison    to
                                               alternative candidates, meaning a
                                               new facility at this location would be
                                               in   close    proximity     to  several
                                               dwellings.

                                               Further, while Candidate A is oriented
                                               to the rear of the community with
                                               residences facing away from it, this
                                               location is oriented in front of many
                                               properties, increasing the potential
                                               for visual intrusion.



Page 16

Page 17

Candidate   Site Address      Proposed                   Description
                           Structure Type

                                            As such, it was determined that a
                                            facility in this location would result in
                                            a     greater     visual  impact,    and
                                            Candidate D was discounted.




Page 17

Page 18

4. SUBJECT SITE & SURROUNDS
4.1       Site Details

The Telecommunications Facility is to be located on land described as Lot 47 on
RP136461, situated at 23 Jirrima Crescent, Cooroibah. The topography of the
subject site is relatively flat with ground levels ranging from 6 m AHD at its
lowest point along the southern boundary to 9 m AHD at the highest point near
to the eastern boundary. The ground level of the proposed facility location is
approximately 7 m AHD.

The Local Government Authority for the proposal is Noosa Council and the site is
zoned as ‘Rural Settlement’ under The Noosa Plan. Figure 4 illustrates the
location of the site and the proposed facility (indicated by the green point).




                                Proposed Facility




Figure 4: Proposed subject site and location of facility (Source: SARA Mapping, DILGP)



The subject property currently contains a dwelling and ancillary shed located
towards the Jirrima Crescent frontage. Additionally, a Type 2 (Moderate)
watercourse also extends through the centre of the site. Figure 5 illustrates an
aerial view of the site location.




Page 18

Page 19

          Figure 5: Characteristics of subject site and location of proposed facility



The proposed facility comprises a 10 m x 12 m lease area (nbn™ compound) to
be located within close proximity of the rear property boundary.

Access to the proposed facility location will be provided via the existing property
access off Jirrima Crescent, and via a proposed extension to the proposed
compound area (total approximately 370 m in length).

An existing culvert located near the centre of the subject property is proposed to
be replaced, triggering referral for constructing or raising waterway barrier
works, in accordance with Schedule 7, Table 2, Item 29 of the Sustainable
Planning Regulation 2009 (SP Reg). The culvert is required to be replaced to
allow for safe access to and from the proposed compound area. Minor vegetation
clearing will be required for access through the subject property, as well as
associated with the culvert replacement (refer to Figures 11 and 12 on Pages
23 and 24).




Page 19

Page 20

The location of the access is illustrated within the attached drawings within
Appendix A – Proposal Plans. Figure 6 shows the proposed location of the
facility within the subject site.




Figure 6: Location of proposed facility (arrowed) looking south west on the subject
property



4.2       Site Surrounds

The immediate area surrounding the site is characterised by rural residential
properties and corridors of mature vegetation. Smaller properties containing
dwellings and businesses are concentrated within the Cooroibah township
situated to the west of the subject site.

The subject site is bordered by Jirrima Crescent to the east, rural residential
properties to the north and south and reserve land to the west. The reserve to
the west of the facility will form a significant vegetation buffer to the higher
density residential properties located west of the proposed facility location. The
closest neighbouring dwelling is situated approximately 220 m to the north-east
of the proposed facility. Figure 7 illustrates an aerial view of the characteristics
of the surrounding area.




Page 20

Page 21

          Figure 7: Location of proposed facility and surrounding context




Page 21


[OCR of page images]
Ford

AANA io )

 

Figure 7: Location of proposed facility and surrounding context

Page 21

Page 22

5. THE PROPOSAL

5.1 Facility and Equipment Details
          Equipment to be installed

Approval is sought for the use and development of a Telecommunications
Facility, comprising a 45 m monopole, and ancillary components including two
(2) outdoor units (ODU) enclosed within a secure compound which measures
approximately 120 m2.
The specific components of the proposed installation are described below:
   •      The installation of a 45 m monopole;
   •      The installation of one (1) 900 mm parabolic dish antenna            for
          transmission purposes, at an elevation of 37 m on the monopole;
   •      The installation of three (3) panel antennas (dimensions 1.07 m high x
          0.30 m wide x 0.115 m deep), attached to the headframe at an elevation
          of 45 m;
   •      The installation of a 2.4 m high chain-link security compound fence
          (compound area 12 m x 10 m), with 3 m wide access gate;

   •      The installation of two (2) outdoor equipment units (dimensions: 1.5 m
          high x 0.65 m wide x 0.65 m deep) at ground level, adjacent to the
          proposed monopole. The outdoor units will be installed on a concrete
          slab of dimensions 2.4 m x 1 m and will be metallic grey in colour;

   •      The installation of associated feeder cables that will run underground
          from the equipment cabinets, and then internally within the monopole to
          the antennas.

The Cooroibah nbn™ Fixed Wireless facility is a Terminal Site within the
network, providing nbn™ services to areas of Cooroibah.

Figure 8 represents an example of a monopole.

Figure 9 represents an example of a parabolic dish.

Figure 10 identifies the specific site on the subject property where the proposed
development is to be located.

Please refer to Appendix A – Proposed Plans for further details.




Page 22

Page 23

   Figure 8: Example of a
         monopole                    Figure 9: Example of a parabolic dish antenna




     Figure 10: Proposed facility location (arrowed) on subject land (facing west)



Page 23

Page 24

          Access and Parking Details

Access to the proposed facility location will be provided via the existing property
access off Jirrima Crescent, and via a proposed extension to the proposed
compound area (total approximately 370 m in length).

For safety reasons, an existing culvert located near the centre of the subject
property is proposed to be replaced, triggering referral for constructing or raising
waterway barrier works, in accordance with Schedule 7, Table 2, Item 29 of the
Sustainable Planning Regulation 2009 (SP Reg). Minor vegetation clearing will be
required for access through the subject property, as well as associated with the
culvert replacement. Refer to Figures 11 and 12 for photographs of the existing
culvert.




          Vegetation to be
             removed




     Figure 11 – Existing culvert to be replaced to allow for safe access to proposed
                                      compound area




Page 24

Page 25

       Vegetation to be
          removed




       Figure 12 - Existing culvert to be replaced to allow for safe access to proposed
                                        compound area


The facility and all ancillary components will be constructed over the one title. A
copy of title is provided in Appendix B. Plans indicating the details of the
proposal form part of the documentation of this application.

The site access is considered to be appropriate given the nbn™ facility will not
be a significant generator of traffic.

During the construction phase, a truck will be used to deliver the equipment and
a crane will be utilised to lift most of the equipment into place. Any traffic
impacts associated with construction will be of a short-term duration and are not
anticipated to adversely impact on the surrounding road network. In the unlikely
event that road closure will be required, nbn will apply to the relevant
authorities for permission.

A total construction period of approximately ten weeks (including civil works and
network integration and equipment commissioning) is anticipated. Construction
activities will involve four basic stages:
   •      Stage 1 (Week 1) – Site preparation works, including field testing,
          excavation and construction of foundations;



Page 25

Page 26

   •      Stage 2 (Weeks 2, 3 and 4) – Construction of the monopole;
   •      Stage 3 (Weeks 5 and 6) – Construction of the equipment shelter and
          fences;
   •      Stage 4 (Weeks 7 – 10) – Installation of antennas and radio equipment,
          as well as equipment testing.


Once operational, the facility will function on a continuously unstaffed basis and
will typically only require maintenance works three times a year.


          Utility Service Details

Power will be supplied to the proposed facility via a new aerial electricity route.
The conditions of supply are indicative only and are subject to Energex approval
and final offer. In the unlikely event that power is not available to the site, a
temporary power supply would be required in the form of a generator. Upgrades
to the existing power facilities will provided at the expense of the applicant.

          Construction and Noise

Noise and vibration emissions associated with the proposed facility are expected
to be limited to the construction phase outlined above. Noise generated during
the construction phase is anticipated to be of short duration and accord with the
standards outlined in the relevant EPA guidelines. Construction works are
planned only to occur between the hours of 7.00am and 6.00pm.

There is expected to be some low level noise from the ongoing operation of air
conditioning equipment associated with the equipment shelter, once installed.
Noise emanating from the air conditioning equipment is expected to be at a
comparable level to a domestic air conditioning installation, and should generally
accord with the background noise levels prescribed by relevant guidelines.


5.2 Site Selection
Following an evaluation of the alternative options and the issues identified, a
new monopole and associated infrastructure at 23 Jirrima Crescent, Cooroibah is
deemed to be the most acceptable solution for the following reasons:


   •      Existing mature vegetation on both the subject site and within the wider
          area will assist in minimising the visual impact of the facility when viewed
          from surrounding dwellings and roads;
   •      The proposed facility location at the rear of a rural residential allotment
          provides for separation from neighbouring dwellings; the closest of which
          is 220 m to the north-east;



Page 26

Page 27

   •      The location enables the height of the proposed facility to be restricted to
          45 m and a monopole structure whilst still achieving coverage to all the
          targeted localities and obtaining line of sight to other planned sites in the
          nbn™ wireless network; and
   •      A monopole was selected as the preferred structure over a lattice tower
          design as this type of facility can remain slim line and is less visually
          obtrusive when viewed from a distance.




Page 27

Page 28

6. CURRENT PLANNING CONTROLS
6.1 Commonwealth Legislation
As a licensed telecommunications carrier, nbn must operate under the provisions
of the Telecommunications Act 1997 and the following supporting legislation:

   •      The Telecommunications Code of Practice 1997;
   •      The Telecommunications (Low-impact Facilities) Determination 1997 (as
          amended); and
   •      The Environment Protection and Biodiversity Conservation (EPBC) Act
          1999.


          The Telecommunications Act

This legislation establishes the criteria for ‘low impact’ telecommunication
facilities. If a proposed facility satisfies the requirements of a ‘low impact’
facility, the development is exempt from the planning approval process.

Further clarification of the term ‘low impact’ is provided in the
Telecommunications Act 1997 and the Telecommunications (Low Impact
Facilities) Determination 1997, which was gazetted subsequent to the Act. The
Telecommunications (Low Impact Facilities) Determination 1997 establishes
certain facilities, which cannot be considered ‘low impact’ facilities.

The proposed facility is not considered to be low impact under the definitions
contained in the Commonwealth legislation as it involves the construction of a
new tower. Therefore, it is subject to the Sustainable Planning Act 2009 and
requires development approval under the provisions of The Noosa Plan.

          Telecommunications Code of Practice 1997

Under the Telecommunications Act 1997, the Government established the
Telecommunications Code of Practice 1997, which sets out the conditions under
which a carrier must operate.

Section 2.11 of the Telecommunications Code of Practice 1997 sets out the
design, planning and installation requirements for the carriers to ensure the
installation of facilities is in accordance with industry ‘best practice’. This is
required to:

          “… minimise the potential degradation of the environment and the visual
          amenity associated with the facilities.” [Section 2.11(3)]




Page 28

Page 29

The siting and design of the proposal has taken place in accordance with Section
3 (Planning and Siting) of the Australian Standard – Siting of Radio
Communications Facilities (AS 3516.2).

Furthermore, following an assessment of the available options, it became
evident that there were no suitable existing telecommunications facilities or
other structures (including buildings or power poles) located within the search
area that could provide the required site objective or co-location opportunities.

          The Telecommunications (Low-impact Facilities) Determination 1997

The Telecommunications (Low-impact Facilities) Determination 1997 identifies
both the type of facilities that can be “Low-impact”, and the areas in which these
facilities can be installed. Importantly, this current facility is not defined as a
“low impact facility” and is therefore subject to State and Territory Planning
Laws and Regulation. In this specific instance, the provisions of the Sustainable
Planning Act 2009 and The Noosa Plan will be applicable to the proposal.

          The Environment Protection and Biodiversity Conservation Act 1999

The Environment Protection and Biodiversity Conservation (EPBC) Act 1999
obliges telecommunications carriers to consider ‘matters of national
environmental significance’. Under this legislation, an action will require approval
from the Minister of Environment if the action has or is likely to have an impact
on a matter of ‘national environmental significance’. According to the EPBC Act
1999, there are seven matters of national significance which must be
considered.

All relevant EPBC matters have been considered. It is not anticipated that the
proposal will have a significant impact on any matters of national environmental
significance. Accordingly, approval from the Minister of Environment is not
required in this instance.

6.2 Queensland Planning Legislation and Guidelines
As identified in Section 6.1.3 of this report, the proposed facility does not fall
within the definition for ‘low impact’ facility under the Telecommunications (Low-
impact Facilities) Determination 1997. Therefore, it is subject to State planning
instruments and regulation in addition to the Commonwealth regulatory
framework.

There are a number of State Government provisions which could potentially
apply to the proposed nbn facility. These include:

   •      The Sustainable Planning Act 2009;
   •      Regional Plan;
   •      State Planning Regulatory Provisions;
   •      State Planning Policy;


Page 29

Page 30

   •      Referral Agencies; and
   •      State Development Assessment Provisions.

          The Sustainable Planning Act 2009

The Sustainable Planning Act 2009 (SPA) has the overall aim of achieving
ecological sustainability, through:

   •      Managing the process by which development takes place, including
          ensuring the process is accountable, effective and efficient and delivers
          sustainable outcomes;
   •      Managing the effects of development on the environment, including
          managing the use of premises; and
   •      Continuing the coordination and integration of planning at the local,
          regional and State levels (Section 1.2.3 SPA)

Pursuant to Chapter 6 of the Sustainable Planning Act 2009, this application has
been prepared to form part of an Impact Assessable material change of use
development application, seeking a development permit under The Noosa
Plan .

6.2.2 Regional Plan

The proposed development falls within the South-East Queensland region which
is covered by the South-East Queensland Regional Plan 2009-2031 (SEQ
Regional Plan). The Plan covers the following local government areas:

            •   Brisbane City Council;
            •   Gold Coast City Council;
            •   Ipswich City Council;
            •   Lockyer Valley Regional Council;
            •   Logan City Council;
            •   Moreton Bay Regional Council;
            •   Toowoomba Regional Council (part of);
            •   Redland City Council;
            •   Scenic Rim Regional Council;
            •   Somerset Regional Council and
            •   Sunshine Coast Regional Council.

The SEQ Regional Plan allocates all land into one of three land use categories;
Regional Landscape and Rural Production Area, Urban Footprint and Rural Living
Area. These categories provide the spatial context for the regulatory provisions
of the SEQ Regional Plan. The subject site falls within the Rural Living Area
under the Regional Plan.

The Rural Living Area identifies land allocated for large lot residential subdivision
within a rural, semi-rural or conservation setting. The SEQ Regional Plan seeks



Page 30

Page 31

to contain and limit areas for rural residential development to prevent the
fragmentation of land, reduce the loss of productive agricultural land, maintain
the rural character, and ensure effective land management to protect
biodiversity, land and water quality.

The proposed use does not compromise the existing character of the
surrounding area, and is considered to support the wider Cooroibah locality.
Therefore, the proposed facility is generally compliant with the provisions of the
SEQ Regional Plan for the Rural Living Area.

6.2.3 State Planning Regulatory Provisions

State Planning Regulatory Provisions (SPRPs) are the pre-eminent planning
instruments and have the ability to regulate and prohibit development, despite
the provisions of a local planning instrument. Assessment against the relevant
SPRPs is outlined in Table 2 below.

Table 2 – Assessment of State Planning Regulatory Provisions

 Current Regulatory Provisions          Comments

 Amendment     to the South East        Applicable - The site is located within the
 Queensland Regional Plan 2009-2031     Rural Living Area of the South East Queensland
 State planning regulatory provisions   Regional Plan 2009-2031.
 – 2 May 2014

 Guragunbah        State     Planning   Not Applicable - The site is not located within
 Regulatory Provision – 27 September    the Guragunbah affected area.
 2013

 State planning regulatory provision    Not Applicable – No infrastructure charges
 (adopted charges) – 2 August 2013      are considered applicable for the proposal,
                                        given the use.

 Yeerongpilly     Transit    Oriented   Not Applicable - The site is not located within
 Development       State     Planning   the area of the Yeerongpilly Transit Oriented
 Regulatory Provision – 23 September    Development.
 2014

 Off-road motorcycling facility on      Not Applicable - The site is not located in
 State-owned land at Wyaralong –        Wyaralong nor is the proposed use of the site
 October 2010                           for a motor sport activity facility.

 State Planning Regulatory Provisions   Not Applicable - The proposed use of the site
 (Adult stores) – July 2010             does not involve an Adult Store.

 South    East   Queensland     Koala   Not Applicable - The site is not located within
 Conservation      State     Planning   a Koala Assessable Development Area.
 Regulatory Provisions – May 2010




Page 31

Page 32

          State Planning Policy (SPP)

On 2 December 2013, the Queensland Government adopted its new single State
Planning Policy (SPP). The SPP replaces the previous multiple policies in
existence. The SPP sets out policies on matters of state interest in relation to
planning and development, and provides a key framework for the government's
broader commitment to planning reform.

The SPP identifies the state's interests in planning and development and how
these are to be dealt with in planning instruments, Council development
assessment processes and in designating land for community infrastructure.

The SPP has not been reflected in The Noosa Plan, and therefore the
proposed development requires assessment against the ‘interim development
assessment provisions’ as outlined in Part E of the SPP.

In accordance with the Part E interim development assessment provisions of the
SPP, there are three (3) codes triggered and addressed in Table 3 below.

Table 3 – Assessment of Interim Development Assessment Provisions

        State Interest                  Assessment                     Compliance
Natural Hazards –               A development application      Complies
    •     Flood Hazard area*    for a material change of       The subject site is identified
          -    Level  1    –    use, reconfiguring a lot or    under the SPP mapping as
          Queensland            operational works on land      being within a Flood Hazard
          Floodplain            within:                        Area    –    Level     1     –
          Assessment overlay                                   Queensland         Floodplain
                                   •    A flood hazard area,
    •     Flood hazard area*                                   Assessment Overlay, Flood
                                        or
          - Level 1 – Local                                    Hazard Area – Level 1 –
                                   •    A bushfire hazard
          Government flood                                     Local Government Flood
                                        area, or
          mapping area                                         Mapping Area.       However,
                                   •    A landslide hazard
                                                               the proposed compound
    •     Bushfire Hazard               area; or
                                                               area is not identified as
                                   •    A    coastal  hazard
                                                               being located within a Flood
                                        area
                                                               Hazard Area under the
                                   •    For     all  natural
                                                               Planning Scheme.
                                        hazards:
                                                               Nonetheless, the proposed
                                Development:                   compound area is relatively
                                                               small (10 m x 12 m) and
                                1. Avoids natural hazards      therefore, any runoff will be
                                   areas or mitigates the      minimal and unlikely to
                                   risks of the natural        increase     the     risk  of
                                   hazards; and                overland flooding issues in
                                2. Supports, and does not      the vicinity of the site.
                                   unduly burden, disaster     Furthermore, certain areas
                                   management response         of the subject site are
                                   or recovery capacity and    identified to be High and



Page 32

Page 33

                                      capabilities; and               Medium Potential Bushfire
                                   3. Directly, indirectly and        Intensity areas. However,
                                      cumulatively avoids an          the proposed compound
                                      increase in the severity        area is not identified to be
                                      of the natural hazards          within these areas, and
                                      and the potential for           instead is located within the
                                      damage on the site or to        Potential Impact Buffer.
                                      other properties; and           Nonetheless, the proposed
                                   4. Avoids risks to public          facility will not increase the
                                      safety       and      the       habitable      footprint     or
                                      environment from the            number of dwellings in the
                                      location of hazardous           bushfire impact area. A
                                      materials      and    the       telecommunications facility
                                      release      of     these       on the subject site will not
                                      materials as a result of        increase community risk,
                                      a natural hazard; and           vulnerability, exposure or
                                   Maintains   or     enhances        sensitivity     to     bushfire
                                   natural processes and the          hazard,        given      that
                                   protective    function   of        hazardous or combustible
                                   landforms and vegetation           materials are not stored on
                                   that can mitigate risks            site.
                                   associated with the natural
                                   hazard



Biodiversity –                     A development application          The subject site is identified
    •     MSES     -    Wildlife   where the land relates to a        under the SPP mapping as
          habitat                  matter          of         state   containing Wildlife Habitat,
    •     MSES – Regulated         environmental significance,        and Regulated Vegetation
          Vegetation               if the application is for:         (intersecting                a
          (intersecting        a   (a)     operational work, or       watercourse).
          watercourse)             (b)    a material change of        The proposed facility is not
                                   use other than for a               considered to negatively
                                   dwelling house, or                 impact upon Matters of
                                   (c)    reconfiguring a lot         State         Environmental
                                   that results in more than six      Significance (MSES), for the
                                   lots or lots less than five        following reasons:
                                   hectares.
                                                                      •   No works or vegetation
                                                                          clearing    within    the
                                   Development:
                                                                          Wildlife Habitat areas on
                                   (1) enhances matters of                site is proposed for
                                   state         environmental
                                                                          either                the
                                   significance where possible,           Telecommunications
                                   and
                                                                          Facility  or    waterway
                                   (2) identifies any potential           barrier works;
                                   significant         adverse        •   The waterway barrier
                                   environmental impacts on               works associated with
                                   matters        of     state


Page 33

Page 34

                                 environmental significance,        this application will only
                                 and                                involve the replacement
                                                                    of the existing culvert.
                                 (3) manages the significant
                                                                    The proposed works will
                                 adverse       environmental
                                                                    incorporate appropriate
                                 impacts on matters of state
                                                                    construction controls to
                                 environmental significance
                                                                    minimise run off from
                                 by protecting the matters of
                                                                    the     work     site    and
                                 state         environmental
                                                                    minimise               works
                                 significance    from,     or
                                                                    undertaken within the
                                 otherwise mitigating, those
                                                                    waterway. Any potential
                                 impacts.
                                                                    impacts on water are
                                                                    proposed          to       be
                                                                    managed              through
                                                                    appropriate       mitigation
                                                                    measures, and              all
                                                                    works      will      be     in
                                                                    compliance       with     the
                                                                    Code for self-assessable
                                                                    development,            Minor
                                                                    waterway barrier works,
                                                                    Part       3:         culvert
                                                                    crossings; and
                                                                •   All           construction
                                                                    activities       will      be
                                                                    managed to avoid any
                                                                    sediment run-off during
                                                                    the construction period
                                                                    in    accordance         with
                                                                    nbn’s           contractor’s
                                                                    Construction
                                                                    Environmental
                                                                    Management Plan.

Water Quality –                  Water quality is to ensure     The                proposed
                                 development is planned,        telecommunication facility
    •     Climatic    regions:
                                 designed, constructed and      will not negatively impact
          stormwater
                                 operated      to    manage     on water quality, for the
          management
                                 stormwater and wastewater      following reasons:
          design objectives
                                 in ways that support the       •   The need for drainage
                                 protection of environmental        and     erosion/sediment
                                 values identified in the           control measures for the
                                 Environmental     Protection       construction     of    the
                                 (Water) Policy 2009.               compound is unlikely
                                                                    given the minor ground
                                                                    disturbance during the
                                                                    construction        phase.
                                                                    However,      the    nbn.
                                                                    compound       foundation
                                                                    will have a gravel finish



Page 34

Page 35

                                                          to aid in the dissipation
                                                          of stormwater on-site;
                                                          and
                                                      •   The proposed compound
                                                          area will be 120 m2,
                                                          which is approximately
                                                          0.029% of the overall
                                                          site area. The relatively
                                                          small    scale     of   the
                                                          development will not be
                                                          a significant generator
                                                          of additional runoff or
                                                          cause the degradation of
                                                          the water quality in
                                                          nearby catchments;
                                                      •   The waterway barrier
                                                          works associated with
                                                          this application will only
                                                          involve the replacement
                                                          of the existing culvert.
                                                          The    impact      of   the
                                                          proposed works will be
                                                          relatively           minor.
                                                          Notwithstanding,         all
                                                          works         will       be
                                                          undertaken               in
                                                          accordance      with    the
                                                          Code for self-assessable
                                                          development – Minor
                                                          waterway barrier works
                                                          –    Part     3:    culvert
                                                          crossings; and
                                                      •   No hazardous chemicals
                                                          or      pollutants      are
                                                          proposed to be stored
                                                          within      the       nbn™
                                                          compound.



          Referral Agencies

A referral agency is an agency that has jurisdiction over a matter in a
Development Application if referral to that agency is triggered under Schedule 7
of the Sustainable Planning Regulation 2009 (SP Reg).

The State Assessment and Referral Agency (SARA) established on 1 July 2013,
made the Department of State Development (DSD) the single referral agency for
all development applications where the Chief Executive of SPA has a jurisdiction
as either the Assessment Manager or referral agency. While DSDIP is responsible



Page 35

Page 36

for a number of referral agency triggers now that the SARA provisions have
commenced, there are still a number of other entities that exist outside of SARA,
that still hold jurisdiction for their own referral agency triggers.

In accordance with Schedule 7 of the Sustainable Planning Regulation 2009 (SP
Reg), the proposed development requires referral for the following matters:


Constructing or raising waterway barrier works

The proposal will require referral to DILGP who will act as a ‘concurrence agency’
in accordance with Sustainable Planning Regulation 2009 – Schedule 7, Table 2,
Item 29, as the proposal involves the replacement of the existing culvert in a
Type 1 – Low waterway. The proposed works are not considered to constitute
Self Assessable development as the removal of vegetation lower than ground will
likely be required.


          State Development Assessment Provisions

The Queensland State Development Assessment Provisions (SDAP) set out the
matters of interest to the State for development assessment, where the Chief
Executive administering SPA (that, is the Director-General of DSD), is
responsible for assessing development applications as either Assessment
Manager or Referral Agency.

The SDAP is prescribed as a statutory instrument under SPA and contains the
matters the Chief Executive of SPA may have regard to in development
assessment, bounded by the decision-making rules outlined in SPA.

Specifically, the SDAP states that where the Chief Executive is a Referral Agency
for a development application under the provisions of the SP Reg mentioned in
Table B.3, Column 3, the application must comply with the State codes
mentioned in Table B.3, Column 5.

Table 4 summarises the relevant provisions of the SP Regulation (that is, the
referral triggers identified in Table 1) together with the matters of interest and
relevant SDAP module and corresponding code. Appendix F – SDAP Code
Assessment includes an assessment of the proposed works against each
module.

Table 4 - State Development Assessment Provisions Codes relevant to proposed
development

Matter of State         Relevant Provision of       Prescribed Relevant Module & Code
Interest                the Regulation              (for Material Change of Use)

Constructing or         Schedule 7, Table 2,        Module 5: Fisheries Resources
raising waterway        Item 29                     5.2 Constructing or raising waterway
barrier works



Page 36

Page 37

                                                   barrier works in fish habitats state code




6.3 Local Government Regulatory Framework
In addition to relevant Commonwealth and State Government regulatory
requirements, the proposed facility is also subject to the Local Government
regulatory framework. In this instance, the relevant Local Government
regulatory framework is the SPA compliant The Noosa Plan.

          The Noosa Plan

The proposed development is defined within The Noosa Plan as follows:

          •   Primary Use: ‘Infrastructure Uses’
              o Use Class: ‘Service and utility’
                     Use: ‘Type 3 Tower’


Type 3 Tower is defined as: ‘The use of premises for a tower, antennas or mast
and supporting shelter or equipment, in the provision or supply of electricity or
telecommunications. The use excludes facilities deemed to be “Low Impact
Facilities” under the Telecommunication (Low Impact Facility) Determination Act
1997, and excludes power poles. The use includes a telecommunication tower,
wind turbine, high voltage transmission lines (110kv or greater).’

          Zoning

The subject site is zoned ‘Rural Settlement’ under the Planning Scheme. A
proposed Material Change of Use for a ‘Type 3 Tower’ in this Zone is Impact
Assessable in accordance with Division 5, Table 5.3 – Assessment table for the
Rural Settlement Zone. Figure 13 illustrates the zoning of the subject site.




Page 37

Page 38

                                    Proposed Facility




       Figure 13: Zoning of the site Rural Settlement (Source: The Noosa Plan)



          Overlays

The subject site is identified as having the following overlays as outlined under
The Noosa Plan:

   •      Cooroibah Biodiversity Overlay – the subject site is identified within the
          Riparian Buffer Area and Koala Habitat Area;
   •      Cooroibah Natural Hazard: Landslide & Flooding Overlay – the subject site
          is identified within an area subject to minimum floor height; and
   •      Cooroibah Natural Hazard: Bushfire & Acid Sulfate Soils Overlay – the
          subject site is identified within the high potential acid sulfate area (0-5m
          AHD).

The provisions relating to these overlays are assessed in Section 7 of this report.
Figures 14 to 16 identify the location of the site in relation to the
abovementioned overlays.




Page 38

Page 39

                                                                 Key:




                                             Proposed Facility




Figure 14: Cooroibah Biodiversity Overlay (Source: The Noosa Plan)




                                                                 Key:




                         Proposed Facility




Figure 15: Cooroibah Natural Hazard: Landslide & Flooding Overlay (Source: The Noosa
Plan)




Page 39

Page 40

                                                 Key:




                            Proposed Facility




Figure 16: Cooroibah Natural Hazard: Bushfire & Acid Sulfate Soils Overlay (Source: The
Noosa Plan)




Page 40

Page 41

7. PLANNING CONSIDERATIONS
7.1 Desired Environmental Outcomes
As the proposed use is identified as Impact Assessable development,
assessment against the Desired Environmental Outcomes (DEO’s) of The Noosa
Plan is required.

There are 12 categories of DEO’s within The Noosa Plan; five (5) of which are
considered to be relevant to this proposal. Demonstration of compliance with the
relevant DEO’s is contained below in Table 7.1.

Table 7.1 - Compliance with the relevant Desired Environmental Outcomes

          Desired Environmental                          Compliance
                Outcomes

 3.1.3 (a) Agricultural Uses               Complies.

 Agricultural industry is maintained The subject site is not currently utilised
 by—                                        for agricultural purposes. However, the
                                            proposed      development      will    not
    (i) conserving           land       for adversely affect the capabilities or
         economically        viable    and practices of the site or surrounding land
         environmentally        sustainable uses, as the establishment of the
         agricultural purposes;             proposed facility will occupy a relatively
    (ii) preventing the fragmentation small lease area (120 m²). The nbn
         of good quality agricultural compound            has    been    strategically
         land;                              located near the western perimeter of
                                            the subject site to reduce any potential
    (iii)       facilitating the growth fragmentation of the uses undertaken
         of non-traditional, though high on site.
         value, crops        which have
         minimal impact on the natural The introduction of Fixed Wireless
         environment        or    adjacent coverage will enhance the community’s
         crops;                             economic wellbeing and social growth.
                                            Fixed Wireless in Cooroibah will aid
    (iv)        facilitating the growth economic and social growth and
         of    non-traditional      animal diversification within the agricultural
         husbandry practices such as sectors, and create an opportunity for
         aquaculture where it does not supplementary incomes and business
         alienate        good       quality pursuits.
         agricultural land or have a
         detrimental impact upon the Therefore the proposal is consistent
         environment;                       with DEO 3.1.3 (a).

    (v) protecting agricultural pursuits



Page 41

Page 42

          Desired Environmental                         Compliance
                Outcomes

          from incompatible uses;

    (vi)       facilitating the growth
        of farm forestry practices;

    (vii)       value adding to farm
        produce to enhance economic
        viability; and

    (viii)    adopting     water    and
        energy efficient practices.

 3.1.3 (c)     Community      Uses    and Complies.
 facilities
                                        The     proposed     development      is
 An adequate range of community considered an essential community
 services and facilities supporting the service for residents within the larger-
 physical, safety, artistic and social lot areas of Cooroibah.
 needs     of    the   community    are
 equitably distributed having regard The proposed facility will provide
 to the-                                improved network access to remote
                                        locations within the region to help
     (i)    Location and density of service current and future resident’s
            housing                     needs by providing access to efficient
                                        and reliable broadband services.
     (ii)   Location     of   transport
            infrastructure              The use has been appropriately located
                                        within the Cooroibah locality and sited
     (iii)  Location     of    business away from community sensitive uses.
            centres
                                        For these reasons the proposal is
     (iv) Social,      economic     and consistent with DEO 3.1.3 (c).
            demographic patterns of
            Noosa; and

    (v)      Functions   of   towns   and
             villages

 3.1.3 (d) Heritage                         Complies.

 The indigenous and non-indigenous          The proposed development will be
 history, culture and traditions are        located on freehold land. In addition,
 reflected in the built and natural         the subject site is not identified as
 heritage of Noosa and are preserved        containing any heritage items.
 for future generations.
                                            Therefore, the proposal is consistent



Page 42

Page 43

          Desired Environmental                          Compliance
                Outcomes

                                          with DEO 3.1.3 (d).

 3.1.3 (g) Open space, environment Complies.
 and conservation functions
                                            The subject site is privately owned land
 Networks of open space and natural and is not identified as being located in
 habitat,    vegetated       lands,    and an open space corridor.
 riparian zones along watercourses-
                                            The development will require the
     (i)   Are sensitively managed removal of vegetation (approximately
           and protected from any 30 m2) for access and in association
           adverse impacts, including with the proposed waterway barrier
           cumulative             impacts, works. However, the facility has been
           resulting                  from intentionally sited on a property which
           development;                     contains vegetation in order to utilise
                                            natural screening benefits, but within a
     (ii)  Set Noosa apart from other location which is relatively clear, thus
           coastal parts of south-east minimising the extent of clearing
           Queensland by strongly required.
           protecting       the     natural
           environment                      The proposed clearing is to occur
                                            adjacent to existing, pre-cleared areas,
     (iii) Support       the      economy resulting in minimal impact on flora and
           through        the      tourism fauna linkages and to avoid any
           industry                         fragmentation          of     vegetation.
     (iv) Define the boundaries to or Furthermore, it is considered that the
           of each of the distinct amount of vegetation clearing is
           localities of Noosa;             relatively minor given the total area of
                                            the subject site is approximately 4
     (v)   Protect      water      quality, hectares; a large portion of which is
           landscape       stability   and vegetated.      This in turn will assist in
           biodiversity                     the protection and enhancement of the
                                            Region’s     biodiversity   quality   and
     (vi) Provide passive, nature-
                                            integrity of habitats.
           based      recreational     and
           educational opportunities;       The waterway barrier works associated
    (vii)    Enhance        amenity; with this application will only involve
                       visual
             and                     the replacement of the existing culvert.
                                     The proposed works will incorporate
    (viii) Provide linkages beyond appropriate construction controls to
           Noosa’s boundaries.       minimise run off from the work site and
                                     minimise works undertaken within the
                                     waterway. Any potential impacts on
                                     water quality, landscape stability and


Page 43

Page 44

          Desired Environmental                Compliance
                Outcomes

                                  biodiversity are proposed to be
                                  managed through mitigation measures
                                  including:

                                    •   All works will be undertaken in
                                        accordance with the guidelines
                                        presented within the Code for
                                        self-assessable development –
                                        Minor waterway barrier works –
                                        Part 3: culvert crossings;
                                    •   Construction     works    will   be
                                        undertaken during periods of low
                                        rainfall or when the stream is
                                        dry. This will minimise the
                                        potential impacts associated with
                                        scouring,        erosion       and
                                        sedimentation. In addition, it will
                                        minimise impact to aquatic
                                        species that may normally be
                                        located within the subject site
                                        when it is inundate;
                                    •   Alternatively, the waterway can
                                        be temporarily blocked and
                                        drained to allow for construction
                                        in dry conditions. A spotter-
                                        catcher would be required to be
                                        present during drainage works to
                                        ensure the safe relocation of
                                        fauna from the waterway to
                                        further      downstream.       The
                                        waterway will be reinstated post
                                        construction works.
                                    •   Works will be limited to the
                                        minimum disturbance area as far
                                        as practicable; and
                                    •   There will be no additional
                                        temporary      waterway     barrier
                                        works        associated        with
                                        construction.    All   construction
                                        materials and machinery will be
                                        stored within designated laydown
                                        areas away from the waterway.



Page 44

Page 45

          Desired Environmental                        Compliance
                Outcomes

                                                Stockpiles will be protected by
                                                suitable   drainage    diversion
                                                structures and/or covered to
                                                minimise contact with rainfall
                                                and/or stormwater.

                                          Furthermore, the proposed compound
                                          will occupy a relatively small, mostly
                                          pervious area and will not result in a
                                          noticeable increase in stormwater
                                          runoff from the site, thereby protecting
                                          the     water   quality    of    nearby
                                          watercourses and streams.

                                          The site has been strategically located
                                          to the rear of a large rural residential
                                          allotment that will offer screening
                                          through existing vegetation located on-
                                          site and in the surrounding area to
                                          preserve the visual amenity and
                                          character of the area.

                                          The introduction of Fixed Wireless
                                          coverage will enhance the community’s
                                          potential in regard to economic
                                          wellbeing and social growth of the
                                          wider Noosa area. Fixed Wireless in the
                                          Cooroibah area will aid economic and
                                          social growth and diversification within
                                          the tourism sectors of the Shire.

                                          For these reasons the proposal         is
                                          consistent with DEO 3.1.3 (g).

 3.1.3 (l) Infrastructure and services    Complies.

 (i) The efficient provision and use of   The      proposed      use      for     a
 services such as water, sewerage,        Telecommunications Facility is identified
 power,     telecommunications     and    as an Infrastructure Use.
 waste disposal, caters for the needs
 of residents and visitors, relative to The locality of Cooroibah has been
 their location within Noosa            identified for the development of a new
                                        facility to provide nbn™ broadband
 (ii) the ongoing viability of existing services to residents, visitors and



Page 45

Page 46

          Desired Environmental                        Compliance
                Outcomes

 infrastructure uses and facilities are businesses within the area.
 protected from the impacts of future
 development.                           To minimise impacts on amenity, the
                                        facility has been appropriately sited
                                        near a heavily vegetated reserve,
                                        which,    along     with   the     existing
                                        vegetation     on      the   surrounding
                                        residential    allotments,    will    offer
                                        screening to the facility when viewed
                                        from the surrounding area. The
                                        significant setback distances offered by
                                        the rural residential allotments that
                                        characterise the settlement of the area,
                                        will provide appropriate separation
                                        between the facility and existing uses.

                                         The siting of this facility has been a
                                         strategic and comprehensive process
                                         undertaken to provide an efficient and
                                         high quality service to the community,
                                         whilst minimising potential impacts on
                                         amenity and the environment.

                                         Furthermore, existing infrastructure
                                         uses within the area will not be
                                         impacted     by     the    proposed
                                         development.

                                         For these reasons, the proposal is
                                         considered to comply with the intent of
                                         DEO 3.1.3 (l).



7.2 Applicable Codes
As the proposed use is identified as Impact Assessable within the ‘Rural
Settlement’ Zone, the proposal must be assessed against all relevant
components of The Noosa Plan. The development and overlay codes that have
been deemed applicable to this application are outlined hereunder:

Part 5 – Planning Area Codes
   • Cooroibah Locality Code.

Part 14 – Development Codes


Page 46

Page 47

   •      Land Use Code:
             o Infrastructure Uses Code.

   •      General Development Codes:
            o Driveways and Car Parking Code;
            o Earthworks Code; and
            o Landscaping Code.

   •      Overlay Codes:
            o Cooroibah Biodiversity Overlay; and
            o Cooroibah Natural Hazard Overlay.


7.2.1 Cooroibah Locality Code

A ‘Tower’ in the Cooroibah Locality is assessable against the Cooroibah Locality
Code. The Overall Outcomes for the Cooroibah Locality which are relevant to the
current proposal are addressed below.

a) New uses and works are located, designed and managed to—

          i be compatible with other uses and works;

          ii maintain the safety of people and works;

          iii avoid significant adverse impacts on the amenity enjoyed by users of
          other premises, including impacts on acoustic and visual qualities; and

          iv avoid significant impacts to native habitat including fragmentation,
          attrition, or removal of vegetation or significant habitat features;

b) Development is consistent with the Priority Infrastructure Plan in Part 15.

c) The Cooroibah Locality forms a transition between the more intensive
development in the Shire’s coastal urban area and the rural hinterland;

d) The Cooroibah Locality retains its role as a rural residential area supported by
urban facilities in other localities;

e) The main concentration of residents is in the southern and eastern part of the
locality;

f) The dominant land uses are—

          i rural settlement, at varying densities consistent with the environmental
          constraints of the area; and

          ii open space, comprising natural bushland settings in both public and
          private tenure;




Page 47

Page 48

g) The distinct boundaries between urban Tewantin and rural settlement in
Cooroibah are maintained, preventing the localities from merging;

h) Physical expansion of the Cooroibah village is avoided to—

          i protect the village’s discrete and informal character; and

          ii ensure urban development is consistent with infrastructure capacity;

i) Residential and rural settlement uses in the area are supported by a
community focal point, with basic services to support the local community;

j) Extractive resources are protected for their economic importance for this
locality and the Shire and extraction of resources is carried out with minimal
adverse impact on the sensitive environments of the Cooroibah Locality;

k) Land unsuited for development, including land which is flood prone or boggy
in wet weather, is left in its natural state;

l) Areas of ecological and environmental significance are protected through the
consolidating and securing of such lands;

m) Areas of native remnant or regrowth vegetation, including their biodiversity
and habitat values are protected;

n) McKinnon Drive, and Louis Bazzo Drive are protected as parts of Noosa’s
major road network;

o) The function, safety and visual amenity of Noosa’s major road network are
protected;

p) The natural core values and the water quality of watercourses of the
Cooroibah Locality, including the Noosa River and Lake Cooroibah, are protected
and enhanced;

q) The major open space network is based on the following links—

          i Tewantin to Lake Cooroibah and the Noosa River;

          ii Ringtail Creek to Lake Cooroibah and the Noosa River; and

          iii a riparian corridor along the Noosa River, Cooloothin Creek, Cooroibah
          Creek and Ringtail Creek;

r) Recreational pursuits are based on—

          i water activities, particularly small-scale non-motorised craft on Lake
          Cooroibah, the Noosa River and creeks;

          ii the Noosa Trails Network; and

          iii public picnic grounds and children’s playground;


Page 48

Page 49

s) A sealed bikeway between Cooroibah and Tewantin allows residents to
commute to other localities;

t) Visitor accommodation is focused on the locality’s camping grounds, small
cabin parks and bed and breakfast style accommodation;

w) For the Rural Settlement Zone—detached housing on large lots—

          i is the dominant building form, to the general exclusion of other uses;

          ii incorporates designs that respond to, and are integrated with site
          characteristics including steep slopes and native vegetation;

          iii offers a relaxed rural lifestyle for residents;

          iv contributes to the rural or semi-rural character and amenity of the
          area;

          v may be located in close proximity to working farms or other rural
          industries;

          vi offer convenient access to Tewantin via sealed roads;

          vii include associated home-based businesses on large lots such that
          neighbours are not impacted upon; and

          viii are dominated by native vegetation and landscaping;


Compliance

Development for a ‘Tower’ is identified as an inconsistent land use within the
Cooroibah Locality – Rural Settlement Zone. However, the subject site at 23
Jirrima Crescent is considered to be an appropriate location to accommodate the
proposed Fixed Wireless facility as impacts on visual amenity will be minimal.

In order to achieve the most appropriate solution, a comprehensive site
selection process was undertaken prior to identifying a preferred site for the
development of a new facility. This process involved consideration of the site’s
ability to achieve coverage and transmission objectives, as well as minimising
visual amenity impacts to the surrounding area.

The subject site is considered to demonstrate an appropriate balance of the
abovementioned goals. The proposed facility has been appropriately located
within a rural residential area that provides for generous separation to nearby
dwellings and roads. The facility is setback more than 220 m from the closest
dwelling and more than 360 m from the Jirrima Crescent frontage.

Furthermore, the surrounding locality contains extensive areas of established
mature vegetation, which will mitigate the potential visual impacts associated



Page 49

Page 50

with the development. The reserve situated to the west of the subject site will
provide a backdrop to the facility when viewed from the east, and will also act as
a significant buffer between the facility and dwellings to the west.

While the subject property is not currently used for agricultural purposes, the
facility will not adversely affect any future potential agricultural and grazing
capabilities of the site. The proposed facility will occupy a relatively small lease
area equivalent to 0.029% of the four (4) hectare site, and is located on the
periphery of the property to avoid fragmentation of land.

Additionally, the proposed development will not result in adverse impacts upon
the riparian buffer area which intersects the subject site. While the proposed
waterway barrier works associated with this application will intersect this area,
the proposed works only involve the replacement of the existing culvert. The
impact of the proposed works will be relatively minor. Notwithstanding, all works
will be undertaken in accordance with the Code for self-assessable development
– Minor waterway barrier works – Part 3: culvert crossings.

The development will require the removal of vegetation (approximately 30 m2)
for access to the subject site, and in association with the culvert replacement.
However, the facility has been intentionally sited on a property which contains
dense vegetation in order to utilise natural screening benefits, but within a
location which is relatively clear, thus minimising the extent of clearing required.
To effectively integrate the facility with the natural environment, vegetation
clearing is necessary.

The proposed clearing is to occur adjacent to existing, pre-cleared areas,
resulting in minimal impact on flora and fauna linkages and to avoid any
fragmentation of vegetation. Furthermore, it is considered that the amount of
vegetation clearing is relatively minor given the total area of the subject site is
approximately 4 hectares in size; a large portion of which is vegetated. This in
turn will assist in the protection and enhancement of the Region’s biodiversity
quality and integrity of habitats.

All clearing activities will be undertaken in accordance with nbn construction
management plans, including measures to avoid impacts to fauna species, and
vegetation outside of the clearing footprint. Further to the above, a pre-clearing
flora and fauna survey will be undertaken to identify any EVNT species, prior to
any works commencing on-site.

For these reasons, the proposal is considered to comply with the Overall
Outcomes of the Cooroibah Locality. Further compliance with the Specific
Outcomes and Probable Solutions is included in Appendix 3 – Code Table
Assessment.




Page 50

Page 51

          Infrastructure Uses Code

A ‘Tower’ is considered an Infrastructure Use within The Noosa Plan and is
therefore assessable against the Infrastructure Uses Code. Section 14.372 of the
Noosa Plans lists overall outcomes for the Infrastructure Uses Code, which have
been considered against the proposal in Table 7.2.

Table 7.2 - Compliance with Overall Outcomes of the Infrastructure Uses Code

            Overall Outcomes                             Compliance

a) Residents and visitors have access to Complies.
adequate levels of infrastructure to
                                         The      proposed    Telecommunications
meet their needs;
                                         Facility    is    considered  to     be
b) Infrastructure Uses do not detract appropriately located in order to
from the visual amenity of the major provide the Cooroibah locality with
road network nor on the rural or essential             communication   services,
residential   amenity       enjoyed  by whilst minimising potential visual and
residents of and visitors to Noosa;      amenity impacts.

c) Facilities are co-located   where The proposed facility will provide
appropriate and practical;           improved network access to the region
                                     to help service current and future
d) Infrastructure uses are energy residents needs and has the potential to
efficient;                           add to the economic viability by
                                     providing access to efficient and reliable
e) Infrastructure Uses do not pose a
                                     broadband services.
threat to public safety;
                                      Potential visual and amenity impacts
f)   The   natural   character   and
                                      have also been considered in the site
environmental values of Noosa are
                                      selection process. The subject property
protected  from    adverse    impacts
                                      and surrounding Cooroibah area is
associated with Infrastructure Uses;
                                      characterised by clusters of dense
and
                                      vegetation. This vegetation will help to
g) Convenient, comfortable and safe mitigate potential visual impacts and
access is provided with the design of provide screening of the facility from
infrastructure uses.                  the surrounding area.

                                            It is recognised that the facility will be
                                            an addition to the landscape. However,
                                            telecommunications       facilities    are
                                            required to be located within the area
                                            they     are    intended      to    serve.
                                            Furthermore, the proposed facility has
                                            been set back from Jirrima Crescent,
                                            approximately 360 m, to reduce the
                                            visual dominance of the facility when



Page 51

Page 52

          Overall Outcomes                           Compliance

                                        viewed by road users and dwellings in
                                        this area.

                                        The    proposed     facility has   been
                                        appropriately located within a low
                                        density, rural residential area and will
                                        not    adversely    impact   the  Rural
                                        Settlement Zone. The facility has been
                                        intentionally located near the western
                                        property boundary of the subject site to
                                        reduce the disturbance of the site and
                                        to provide greater separation to
                                        dwellings in the area. Furthermore, the
                                        nbn™      compound      will occupy    a
                                        relatively small lease area (120 m²) of
                                        the total 4 hectares of land, which will
                                        prevent the fragmentation of the
                                        potentially productive land, although
                                        the site is not currently used for
                                        agricultural or grazing purposes.

                                        The facility has been intentionally
                                        located on privately owned land for
                                        which an extension to the existing
                                        access is required and will involve
                                        minor vegetation clearing works. The
                                        site access is considered to be
                                        appropriate given the nbn facility will
                                        not be a significant generator of traffic
                                        and is not anticipated to adversely
                                        impact on the surrounding road
                                        network. The proposed facility will also
                                        have restrictions aimed at preventing
                                        public access, including a secured
                                        compound fence with a locked gate and
                                        warning signs placed around the
                                        facility.



For these reasons, the proposal is considered to comply with the overall
outcomes for the Infrastructure Uses Code. Further compliance with the Specific
Outcomes and Probable Solutions for the Infrastructure Uses Code is included in
Appendix 3 – Code Table Assessment.



Page 52

Page 53

          Driveway and Car Parking Code

The Code for Driveways and Car parking is required to be assessed as part of
this application. The Overall Outcomes of this code have been assessed against
the proposal in Table 7.3.

Table 7.3 - Compliance with Overall Outcomes of the Driveway and Car Parking Code

             Overall Outcomes                             Compliance

 a) Safe and reasonable access to and Complies.
 from     vehicle    accommodation   and
 standing areas within a property and The car parking requirements in the
 from the public road is provided;       Code for Driveway and Car Parking do
                                         not provide parking requirements for an
 b) The safety of pedestrians and ‘Infrastructure Use’.
 cyclists is protected;
                                         Nonetheless, access to the proposed
 c) Development reduces the reliance on facility location will be provided via the
 private vehicles and promotes public existing property access track off
 and nonmotorised transport options;     Jirrima Crescent, and via a proposed
                                         extension to the proposed compound
 d) Car parking spaces and the area. An existing culvert located near
 associated manoeuvring areas provided the centre of the subject property is
 are designed to be safe and functional proposed to be replaced, triggering
 and meet the reasonable requirements referral for constructing or raising
 of the particular land use;             waterway barrier works, in accordance
 e) Adequate provision is made for the with Schedule 7, Table 2, Item 29 of
 standing,      parking,   loading   and the Sustainable Planning Regulation
 unloading, access and manoeuvring of 2009 (SP Reg). The culvert is required
 service vehicles within the development to be replaced to allow for safe access
 site;                                   to and from the proposed compound
                                         area. Minor vegetation clearing will be
 f) Development does not adversely required for access through the subject
 impact on existing public parking;      property, as well as associated with the
                                         culvert replacement. All works will be
 g) Adequate monetary contributions are
                                         undertaken in accordance with the
 made in circumstances where Council
                                         guidelines presented within the Code
 considers the provision of external
                                         for self-assessable development – Minor
 parking will fulfil the parking demand
                                         waterway barrier works – Part 3:
 generated by the development and will
                                         culvert crossings, and adverse impacts
 not have an adverse impact on existing
                                         upon      existing    landscaping     and
 public parking; and
                                         vegetation is unlikely.
 h) Vehicular access does not impact
 adversely upon existing landscaping or The proposed development does not
 native vegetation.                     provide for onsite parking as the facility
                                        will not be a large generator of traffic.



Page 53

Page 54

            Overall Outcomes                              Compliance

                                             The only times vehicle access will be
                                             required is during the installation of the
                                             equipment and maintenance periods 3-
                                             4 times a year. There is sufficient
                                             parking and manoeuvring space on-site
                                             for vehicles during these periods.



For these reasons, the development is considered to comply with the Driveways
and Car parking Code.


          Earthworks Code

The Overall Outcomes of the Earthworks Code have been considered against the
proposal in Table 7.4.

Table 7.4 - Compliance with Overall Outcomes of the Earthworks Code

             Overall Outcomes                             Compliance

 a) To ensure that earthworks do not Complies.
 unreasonably impact on the natural
                                            The proposed facility will be located
 environment or other properties with
                                            within a lease area of approximately
 regard to –
                                            120 m2. Earthworks are required to
       (i)    Land    stability  (including construct the facility, but will be
       differential      settlement      or minimal and limited to the extent
       expansion in reactive soils);        required     to   establish    appropriate
                                            foundations for the monopole and will
       (ii) Contamination of land;          not result in any adverse impacts on
                                            land stability, drainage, soil disturbance
       (iii) Flooding and drainage;
                                            or existing amenity.
       (iv) Groundwater, watercourses
       and wetlands;                        The waterway barrier works associated
                                            with this application will only involve
       (v) Loss of native remnant or the replacement of the existing culvert.
       regrowth vegetation; and             The proposed works will incorporate
                                            appropriate construction controls to
 b) Earthworks are designed and
                                            minimise run off from the work site and
 constructed to be structurally sound.
                                            minimise works undertaken within the
                                            waterway. Any potential impacts on
                                            land stability, groundwater or the
                                            watercourse are proposed to be
                                            managed through mitigation measures



Page 54

Page 55

          Overall Outcomes                Compliance

                             including:

                                •   All works will be undertaken in
                                    accordance with the guidelines
                                    presented within the Code for
                                    self-assessable development –
                                    Minor waterway barrier works –
                                    Part 3: culvert crossings;
                                •   Construction     works    will  be
                                    undertaken during periods of low
                                    rainfall or when the stream is
                                    dry. This will minimise the
                                    potential impacts associated with
                                    scouring,        erosion       and
                                    sedimentation. In addition, it will
                                    minimise     impact to aquatic
                                    species that may normally be
                                    located within the subject site
                                    when it is inundate;
                                •   Alternatively, the waterway can
                                    be temporarily blocked and
                                    drained to allow for construction
                                    in dry conditions. A spotter-
                                    catcher would be required to be
                                    present during drainage works to
                                    ensure the safe relocation of
                                    fauna from the waterway to
                                    further      downstream.       The
                                    waterway will be reinstated post
                                    construction works.
                                •   Works will be limited to the
                                    minimum disturbance area as far
                                    as practicable; and

                             There will be no additional temporary
                             waterway barrier works associated with
                             construction. All construction materials
                             and machinery will be stored within
                             designated laydown areas away from
                             the waterway. Stockpiles will be
                             protected by suitable drainage diversion
                             structures and/or covered to minimise
                             contact with rainfall and/or stormwater.



Page 55

Page 56

For these reasons, the proposed development is considered to comply with the
intent of the Earthworks Code, and further assessment is not required.

          Landscaping Code

The Code for Landscaping is required to be assessed as part of this application.
The Overall Outcomes of this code have been considered against the proposal in
Table 7.5.

Table 7.5 - Compliance with Overall Outcomes of the Landscaping Code

             Overall Outcomes                             Compliance

 a) retains, reinforces and enhances the Complies.
 natural landscape character of the site,
 streetscape and locality;                  The current development does not
                                            propose the establishment of additional
 b) retains existing vegetation and other landscaping. The proposed facility is
 natural features for their ecological, located near the western boundary of
 aesthetic and cultural values;             the property in an area, which is
                                            bordered by existing mature vegetation
 c) ensures the revegetation and and is set back from existing dwellings
 rehabilitation of native wildlife habitat and the road network in order to reduce
 and riparian zones to protect and the visual dominance.
 enhance ecological and biodiversity
 values;                                    The provision of landscaping to screen
                                            the facility is not considered to provide
 d)     facilitates    water    management additional screening benefits beyond
 including on-site detention and the what is provided by the existing
 efficient infiltration of stormwater;      vegetation      on-site   and    in   the
 e) enables the establishment of surrounding                 area.   Therefore,   the
 appropriate plantings that are of a scale proposal is considered to have a minor
 and      density     commensurate     with impact on the natural landscape and
 building height, bulk and scale to buffer built environment as the existing
 development and conflicting land uses;     mature vegetation will largely be
                                            retained to act as a visual buffer.
 f) enhances privacy between dwelling
 units and accommodation units;

 g)    accommodates       the    outdoor
 recreation needs of dwelling occupants;
 and

 h)   provides   adequate    vegetation
 treatment to steep slopes and unstable
 landforms.




Page 56

Page 57

For these reasons, the proposed development is considered to comply with the
intent of the Landscaping Code, and further assessment is not required.

          Biodiversity Overlay Code

The subject lot is identified as containing ‘Riparian Buffer Area’ and ‘Koala
Habitat Area’ within the Biodiversity Overlay. The Overall Outcomes relevant to
the subject site have been considered in Table 7.6.

Table 7.6 - Compliance with Overall Outcomes of the Biodiversity Overlay Code

              Overall Outcomes                              Compliance

 a) The natural resources of the former Complies.
 Noosa Shire are conserved including—
                                             The proposed facility has been located
       i. land which is of scenic, within a freehold rural residential
       cultural, historical, educational, property, which is currently occupied by
       recreational, scientific, ecological, a single dwelling.
       biodiversity, economic, social or
       aesthetic value;                      The development will require the
                                             removal of vegetation (approximately
       ii. soil or landforms such as 30 m2) for access and in association
       watercourses, drainage lines, with the proposed waterway barrier
       foreshores, dunes and steep works. However, the facility has been
       slopes;                               intentionally sited on a property which
                                             contains vegetation in order to utilise
       iii. the ecosystem health and natural screening benefits, but within a
       quality of the water, land and location which is relatively clear, thus
       other natural resources; and          minimising the extent of clearing
       iv. the extent and condition of required.
           native and remnant vegetation,      The proposed clearing is to occur
           including wetlands and areas of     adjacent to existing, pre-cleared areas,
           significant regrowth of local       resulting in minimal impact on flora and
           origin;                             fauna linkages and to avoid any
 b) The biological diversity of native flora   fragmentation          of    vegetation.
 and fauna and their habitats is               Furthermore, it is considered that the
 maintained;                                   amount of vegetation clearing is
                                               relatively minor given the total area of
 c) Wildlife corridors, vegetation links       the subject site is approximately 4
 and riparian vegetation are conserved,        hectares; a large portion of which is
 managed and rehabilitated to ensure           vegetated.     This in turn will assist in
 the long term ecological viability and        the protection and enhancement of the
 sustainability of native flora and fauna      Region’s     biodiversity  quality    and
 species;                                      integrity of habitats.

 d) Activities that may impact upon The waterway barrier works associated



Page 57

Page 58

            Overall Outcomes                            Compliance

 vegetation are managed so as to with this application will only involve
 minimise the impact upon Noosa’s the replacement of the existing culvert.
 natural resources, including—           The proposed works will incorporate
                                         appropriate construction controls to
       i. the ecological values of water minimise run off from the work site and
       catchment areas;                  minimise works undertaken within the
       ii. that part of the natural waterway. Any potential impacts on
       environment      that   may   be ecological values are proposed to be
       environmentally      harmed    by managed through mitigation measures
       vermin, pests, noxious plants or including:
          threats such as fire, development
                                              •   All works will be undertaken in
          and       inappropriate      land
                                                  accordance with the guidelines
          management; and
                                                  presented within the Code for
          iii. vistas and scenic amenity of       self-assessable development –
          the landscape;                          Minor waterway barrier works –
                                                  Part 3: culvert crossings;
 e) The replanting or rehabilitation of       •   Construction works will be done
 degraded ecosystems and habitat is               during periods of low rainfall or
 achieved;                                        when the stream is dry. This will
 f) In the case of urban areas, urban             minimise the potential impacts
 amenity, quality of life and ecosystem           associated with scouring, erosion
 health is maintained and enhanced.               and sedimentation. In addition, it
                                                  will minimise impact to aquatic
                                                  species that may normally be
                                                  located within the subject site
                                                  when it is inundate;
                                              •   Alternatively, the waterway can
                                                  be temporarily blocked and
                                                  drained to allow for construction
                                                  in dry conditions. A spotter-
                                                  catcher would be required to be
                                                  present during drainage works to
                                                  ensure the safe relocation of
                                                  fauna from the waterway to
                                                  further      downstream.      The
                                                  waterway will be reinstated post
                                                  works.
                                              •   Works will be limited to the
                                                  minimum disturbance area as far
                                                  as practicable; and
                                              •   There will be no additional
                                                  temporary      waterway    barrier



Page 58

Page 59

              Overall Outcomes                             Compliance

                                                    works        associated       with
                                                    construction.   All   construction
                                                    materials and machinery will be
                                                    stored within designated laydown
                                                    areas away from the waterway.
                                                    Stockpiles will be protected by
                                                    suitable    drainage     diversion
                                                    structures and/or covered to
                                                    minimise contact with rainfall
                                                    and/or stormwater.

                                             In addition, the development will
                                             occupy only a small footprint within the
                                             site (approximately 0.029% of the total
                                             site area) and will involve minor
                                             excavation works to install the facility.



For these reasons, the proposed facility is considered to comply with the Overall
Outcomes of the Biodiversity Overlay Code and further assessment is not
required.

          Natural Hazards Overlay Code

The subject site is identified as a ‘Flood Hazard Area’ and ‘Area Subject to
Minimum Floor Height’ within the Landslide and Flooding Overlay as well as ‘High
Potential Acid Sulfate Soils’ within the Bushfire and Acid Sulfate Soils Overlay.
The Overall Outcomes relevant to the subject site have been considered in Table
7.7.

Table 7.7 - Compliance with Overall Outcomes of the Natural Hazards Overlay Code

              Overall Outcomes                             Compliance

 a) development in areas at risk from Complies.
 natural hazards is compatible with the
 nature of the natural hazard;           As the subject site is identified within
                                         the ‘Area Subject to Minimum Floor
 b) the risk to people, property and the Height’, and ‘High Potential Acid Sulfate
 natural environment from natural Soils’ of Council’s mapping, the Natural
 hazards is minimised;                   Hazards Overlay Code applies to this
                                         application.
 c) development does not result in a
 material increase in the extent or The          proposed      development       is
 severity of natural hazards; and        considered to be compatible with the
                                         nature of the identified natural hazards


Page 59

Page 60

          Overall Outcomes                             Compliance

 d)    for  acid   sulfate  areas—the     on the subject site. The proposed
 generation or release of acid and        compound area is relatively small (10 m
 associated metal contaminants into the   x 12 m) and therefore, any runoff will
 environment is avoided                   be minimal and unlikely to increase the
                                          risk of overland flooding issues in the
                                          vicinity of the site, with no increase in
                                          the risk to people, property or the
                                          natural environment, or in the extent or
                                          severity of the hazard.

                                          Furthermore, the proposal involves
                                          excavation of less than 100 m³ of soil
                                          material    (subject  to  geotechnical
                                          investigations). Any disturbed acid
                                          sulphate soil will be treated and
                                          managed in accordance with the
                                          current Queensland standards.

                                          For these reasons, the proposed
                                          development is considered to comply
                                          with the Natural Hazards Area Code and
                                          further assessment is not considered
                                          necessary.




Page 60

Page 61

8. OTHER ENVIRONMENTAL CONSTRAINTS
   AND OPPORTUNITIES
8.1 Visual Impact
nbn has endeavoured to strike a balance between providing services and
minimising visual impact on the community and local environment.
Telecommunication towers need to be located in or near the area for which they
are designated to provide or improve coverage. This site was selected based on
consideration of town planning matters, coverage objectives, and the ability to
mitigate impacts on the area’s visual amenity.

The subject site is a large, rural residential property currently containing a
dwelling and ancillary shed located towards the Jirrima Road frontage. The
remainder of the property is relatively clear with clusters of mature vegetation
situated towards the western half of the property and near the watercourse
which intersects the site. Figures 17 and 18 illustrate the site location and site
characteristics.




Figure 17: Location of proposed facility (arrowed) looking west on the subject property




Page 61

Page 62

Figure 18: Location of proposed facility (arrowed) looking west on the subject property



As illustrated in Figures 17 and 18, while the proposed facility has been located
on a relatively clear portion of the subject site, mature vegetation surrounding
the proposed compound area will provide significant screening benefits to the
proposed facility. This mature vegetation will assist in integrating the facility into
the surrounding landscape, and will also provide screening to the proposed
facility when viewed from the surrounding area. The dense vegetation in the
reserve land to the west of the proposed compound area, which extends as tall
as 15-20 m, will not only provide a backdrop to the facility when viewed from
the east, but will provide a buffer between the proposed facility and dwellings
located to the west along Devonstone Drive.

Furthermore, and as illustrated in Figure 19, the surrounding Cooroibah area is
also characterised by areas of dense vegetation. Mature trees on adjoining lots
and within the wider area will further obscure views towards the proposed
facility, in turn reducing its visual dominance in the landscape.




Page 62

Page 63

      Clusters of dense
         vegetation




   Figure 19: Aerial view of the surrounding area and characteristics (Source: Google
                                         Earth)




Figure 19 also illustrates the proposed facility’s strategic location within the
rural residential area of Cooroibah, removed from the higher density, urban
settlement to the west, and from neighbouring dwellings. The proposed facility
has been sited in an area subject to a lower density of development that will
benefit from generous separation distances to surrounding land uses, whilst
being able to achieve both coverage and transmission objectives at a maximum
height of 45 m.
The proposed location also provides for significant separation distances to road
corridors, and is set back more than 350 m from the Jirrima Crescent frontage.
As illustrated within the Photomontage contained within Figure 20, whilst
intermittent views of the facility may be visible from directly in front of the
subject site, the large separation distance will assist in reducing the visual
impact of the facility. Figure 20 also illustrates that the facility will be viewed in
the context of existing vertical elements in the area, i.e. the power poles that
line the Jirrima Crescent corridor.




Page 63

Page 64

Figure 20: Photomontage illustrating the general location of proposed facility looking
west from Jirrima Crescent (separation distance of approximately 360 m)




The visual impact of the facility when viewed from dwellings and roads within
the wider area will be minimal given the considerable separation distances
afforded to the facility, as well as the dense vegetation in the wider area.
Figures 22 to 24 below illustrate views towards the proposed facility from
several perspectives in the surrounding Cooroibah area. Photograph locations
are identified in Figure 21 below.

As illustrated in the following figures, views of the facility will be sufficiently
obscured as a result of the sparsely development, vegetated nature of the
Cooroibah area. As such, the facility will not adversely impact upon the area’s
scenic and landscape values.




Page 64

Page 65

          Figure 21: Photograph locations




Page 65


[OCR of page images]
 

Figure 21: Photograph locations

Page 65

Page 66

Figure 22: View looking north-west towards the proposed facility (obscured) from near
to 19 Jirrima Crescent (separation distance of approximately 400 m)




Figure 23: View looking south-west towards the proposed facility (obscured) from near
to 28 Jirrima Crescent (separation distance of approximately 500 m)




Page 66

Page 67

Figure 24: View looking east towards of the proposed facility (obscured) from
Adensfield Court (separation distance of approximately 460 m)




Therefore, while it is acknowledged that the proposed facility will be an addition
to the area, it is considered that the facility has been located and designed
appropriately to minimise detrimental visual impacts. Once established, the
monopole is not likely to result in significantly adverse impacts upon the scenic
amenity of the surrounding area when considering the following reasons:

   •      Existing mature vegetation on both the subject site and within the wider
          area will assist in minimising the visual impact of the facility when viewed
          from surrounding dwellings and roads;
   •      The proposed facility location at the rear of a rural residential allotment
          provides for separation from neighbouring dwellings; the closest of which
          is 220 m to the north-east.
   •      The location enables the height of the proposed facility to be restricted to
          45 m and a monopole structure whilst still achieving coverage to all the
          targeted localities and obtaining line of sight to other planned sites in the
          nbn™ wireless network; and




Page 67

Page 68

   •      A monopole was selected as the preferred structure over a lattice tower
          design as this type of facility can remain slim line and is less visually
          obtrusive when viewed from a distance.



8.2 Heritage
In order to determine any possible natural or cultural values of state or national
significance associated with the site, a search was conducted through the
relevant Heritage Registers (refer to Appendix D). As a result of this search,
no known items of cultural, historical or environmental heritage significance
were found to be located in the vicinity of the proposed facility. However, the
duty of care outlined in the Aboriginal Cultural Heritage Act 2003 Duty of Care
Guidelines will be exercised during construction and if at any time a cultural
heritage find is made, all activities will cease immediately until further notice to
proceed has been obtained from the relevant cultural heritage party.


8.3 Electrical Interference and Grounding of the Facility
The nbn™ Fixed Wireless network is licensed by the Australian Communications
and Media Authority (ACMA) for the exclusive use of the OFDMA9800 frequency
band. As nbn is the exclusive licensee of this sub-band, emissions from nbn
equipment within the frequency band should not cause interference.

Filters will also help to ensure that each facility meets the ACMA specifications
for emission of spurious signals outside the nbn frequency allocations. nbn
intends to promptly investigate any interference issues that are reported.

The facility is also designed to be grounded to the relevant Australian Standards
– that is, the facility will be ‘earthed’.


8.4 Erosion, Sedimentation Control and Waste Management
All erosion and sediment control mitigation measures will be detailed in
construction plans and will comply with the Building Code of Australia and local
Council standards. In addition, contractors must comply with the ‘NBN
Construction Specification' that requires contractors to undertake the necessary
erosion and sediment control measures in order to protect the surrounding
environment. On completion of the installation, the site will be restored and
reinstated to an appropriate standard. No waste which requires collection or
disposal will be generated by the operation of the facility.




Page 68

Page 69

8.5 Traffic Generation
After the construction period, the only traffic generated by the base station will
be that associated with maintenance vehicles. In this respect, it is estimated
that maintenance of the facility will generate only one visit per year and it will
remain unattended at all other times. The traffic generation will therefore be
minimal and not sufficient to create any adverse impacts in this regard or by
creating a demand for parking facilities.


8.6 Utility Services
All services required for the ongoing operation of the base station are capable of
being provided to the facility without impacting on the supply or reliability of
these services to any existing consumers in the locality. No stormwater,
sewerage or waste management facilities are required.


8.7 Noise
Noise and vibration emissions associated with the proposed facility will be limited
to the initial construction phase. There will be some low level noise from the
ongoing operation of air conditioning equipment associated with the equipment
shelter, once installed. Noise emanating from the air conditioning equipment is
at a comparable level to a domestic air conditioning installation, and will
generally accord with the background noise levels prescribed by Australian
Standard AS1055.


8.8 Flora and Fauna
          – Vegetation Management Act 1999

The Vegetation Management Act 1999 (VMA) is the legislation that regulates
vegetation management and the clearing of native vegetation in Queensland.
The VMA, administered by the Department of Natural Resources and Mines
(DNRM), controls the rules and regulations that guide what clearing can be
done, and how it must be done to meet the requirements of the law.

The proposed facility is located approximately 55 m from identified Category B
Regulated Vegetation (Of Concern/Least Concern Regional Ecosystem). Refer to
Figure 25 below.




Page 69

Page 70

Figure 25: Regulated Vegetation Management Map



The clearing of regulated vegetation is not proposed, and therefore the proposed
development does not involve a State interest for clearing vegetation under the
Sustainable Planning Regulation 2009, nor assessment under the State
Development Assessment Provisions.



          – Nature Conservation Act 1992

The Nature Conservation Act 1992 (NC Act) provides for the conservation and
management of nature through two mechanisms:
 •   the declaration and management of protected areas; and
 •   the protection of native wildlife that is not found within a protected area.
The NC Act provides for orders to conserve, protect or manage wildlife, habitat
or areas subject to a threatening process likely to have a significant detrimental
effect.

Part 3 of the Nature Conservation (Wildlife Management) Regulation 2006
outlines exemptions which apply to the clearing of protected plants. The clearing
of ‘least concern’ species are exempt under the NC Act. However, the clearing of
Endangered, Vulnerable or Near Threatened (EVNT) species will require a
clearing permit. Areas identified at ‘high risk’ of containing EVNT species require
a pre-clearing flora survey prior to confirming requirements under the NC Act



Page 70

Page 71

(as per Section 265 of the Nature Conservation (Wildlife Management)
Regulation 2006).

The site is identified within the DEHP flora survey trigger mapping as being
within a ‘high risk’ area (refer Appendix D). A pre-clearing flora and fauna
survey will be undertaken and approvals sought, prior to any construction works
commencing.



8.9 Endangered Species
In order to determine any possible Protected Species associated with the site an
EPBC report was obtained (refer to Appendix D). The EPBC Act Protected
Matters Report illustrates that some protected species are present within the
1km radius search ring; however the proposal for a Telecommunications Facility
is not considered an activity that will have a significant impact on any
threatened or migratory species in the area.



8.10 Social and Economic Impacts
Access to fast internet is an essential service in modern society. Initially, small
to medium business customers accounted for a significant part of the demand
for broadband technology, but internet services have now been embraced by the
general public. Usage of internet services continues to widen as new
technologies become progressively more affordable and accessible for the wider
community.

The proposed development should provide significantly enhanced Fixed Wireless
internet coverage to the area of Cooroibah. This is expected to be of particular
benefit for residential dwellings in the locality.

The new nbn™ is designed to provide the community with access to fast and
reliable internet services. A reliable internet service is important to help promote
the economic growth of communities, and the facility is anticipated to have
significant social and economic benefits for the local community.


8.11 Public Safety
          Radiofrequency Emissions

In relation to public safety and specifically Electromagnetic Emissions (EME) and
public health, nbn operates within the operational standards set by the
Australian Communication and Media Authority (ACMA) and Australian Radiation
Protection and Nuclear Safety Agency (ARPANSA). ARPANSA is a Federal


Page 71

Page 72

Government agency incorporated under the Health and Ageing portfolio and is
charged with the responsibility for protecting the health and safety of both
people and the environment from the harmful effects of radiation (ionising and
non-ionising).

All nbn installations are designed and certified by qualified professionals in
accordance with all relevant Australian Standards. This helps to ensure that the
nbn facility does not result in any increase in the level of risk to the public.

This facility is to be operated in compliance with the mandatory standard for
human exposure to EME – currently the Radio communications (Electromagnetic
Radiation Human Exposure) Standard 2003. The EME Report associated with this
site is attached in Appendix E. The report shows that the maximum predicted
EME will equate to 0.089% of the maximum exposure limit. This is
approximately 1,123 times below the maximum allowable exposure limit (where
100% of the limit is still considered to be safe).

Moreover, all nbn equipment has the following features, all of which help to
minimise the amounts of energy used and emitted:
   •      Dynamic/Adaptive Power Control is a network feature that automatically
          adjusts the power and hence minimises EME from the facility.
   •      Varying the facility’s transmit power to the minimal required level,
          minimising EME from the network, and
   •      Discontinuous transmission, a feature that reduces EME emissions by
          automatically switching the transmitter off when no data is being sent.


          Access

The proposed facility will have restrictions aimed at preventing public access,
including a secured compound fence with a locked gate and warning signs placed
around the facility.


8.12 The Public Interest and the Benefits of Telecommunications
The proposed nbn facility is expected to have significant benefit for residents in
the Cooroibah area. nbn believes that the public interest would be served by
approval of the proposal, given benefits for enhanced internet coverage in the
area. The facility is expected to have benefits for local residents and businesses
within the district.




Page 72

Page 73

          Other Benefits of Reliable Broadband Services

There are numerous other benefits of telecommunications connectivity, as
follows: 2
    •     There are many potential educational benefits justifying the
          implementation of the nbn™. Curriculum and data sharing, increased
          availability and accessibility of research materials, and virtual classroom
          environments are good examples. Such elements are particularly
          beneficial within a tertiary education context.
    •     Businesses can, through internet usage, increase efficiency through time,
          resource and monetary savings. Improved internet services effectively
          remove physical distance and travel time as a barrier to business.
    •     Improvements to internet services may also be of benefit for local
          employees, by enabling telecommuting and home business. The
          telecommuting trend is heavily reliant on access to fast internet services,
          and is anticipated to continually increase in popularity.

The public benefits of access to fast internet have been widely acknowledged for
many years. Reliable internet access is now more than ever an integral
component of daily life, so much so that its absence is considered a social
disadvantage.




2
  End user experience including the speeds actually achieved over the nbn™ depends on some factors outside
nbn control like the end user’s equipment quality, software, broadband plans and how the end user’s service
providers designs its network.



Page 73

Page 74

9. CONCLUSION

The proposed nbn facility, comprising a 45 m monopole, three (3) x panel
antennas (1.077 m), 1 x transmission dish (0.9 m) and ancillary equipment has
been sited in the most appropriate location given the context of the local area
and service objective – providing broadband services to the larger lot
development in the Cooroibah community.

The facility has been strategically sited and designed to minimise visibility within
the surrounding environment as much as practicable. The visual impact of the
development on the surrounding area has been assessed and given the siting
and design, the proposal is considered unlikely to cause any significant harm to
the visual amenity or scenic value of the area. Although the monopole would be
visible at varying degrees depending on the line of site of the viewer, negative
impacts on visual amenity are not deemed to be significant.

Accordingly, it is considered that the visual impact of the proposal is acceptable
having had full regard to the context of the locality, the nature of the design
employed, and the coverage benefits deriving from the installation.

The proposal is also consistent with the stated objectives of The Noosa
Plan. It is considered that the proposal will provide an important community
benefit to the area of Cooroibah providing service to local residents and
businesses.

We respectfully request that Council considers the limited impacts and expected
benefits of this proposed facility in assessing this Development Application.

Page 75

Appendix A - Proposal Plans




                              75


[OCR of page images]
Appendix A - Proposal Plans

75

Page 76

                                                  Client:




DATE OF ISSUE
DRAWING PACKAGE VERSION

GENERAL
                                                  Client:



                           COOROIBAH
                                                             ERICSSON
                           23 JIRRIMA CRESCENT
ELECTRICAL
                           COOROIBAH
                                                  Client:




                           QLD 4565
RF AND TX CONFIGURATIONS
                           RFNSA No.: 4565010     Project:


                                                 NATIONAL BROADBAND
STRUCTURAL                                            NETWORK




CIVIL



MONOPOLE DOCUMENTATION
                                                 Rev Date     Revision Details




LEASE
                                                  DESIGNER:                      JR

DISTRIBUTION               PROJECT SUMMARY        CHECKED:
                                                  APPROVED:
                                                                                 MR
                                                                                 LS
                                                  Drawing Title:




                                                  Drawing No.                         Revision

                                                                                      02

Page 77

 Client:




 Client:




            ERICSSON

 Client:




 Project:


NATIONAL BROADBAND
     NETWORK

       COOROIBAH




Rev Date     Revision Details




 DESIGNER:                      JR
 CHECKED:                       MR
 APPROVED:                      LS
 Drawing Title:




 Drawing No.                         Revision

                                     01

Page 78

                      Client:

     SITE LOCATION




                      Client:




                                 ERICSSON

                      Client:




SITE CO-ORDINATES     Project:


                     NATIONAL BROADBAND
 MONOPOLE LOCATION        NETWORK

                            COOROIBAH




                     Rev Date     Revision Details




                      DESIGNER:                      JR
                      CHECKED:                       MR
                      APPROVED:                      LS
                      Drawing Title:




                      Drawing No.                         Revision

                                                          02

Page 79

 Client:




 Client:




            ERICSSON

 Client:




 Project:


NATIONAL BROADBAND
     NETWORK

       COOROIBAH




Rev Date     Revision Details




 DESIGNER:                      JR
 CHECKED:                       MR
 APPROVED:                      LS
 Drawing Title:




 Drawing No.                         Revision

                                     01

Page 80

 Client:




 Client:




            ERICSSON

 Client:




 Project:


NATIONAL BROADBAND
     NETWORK

       COOROIBAH




Rev Date     Revision Details




 DESIGNER:                      JR
 CHECKED:                       MR
 APPROVED:                      LS
 Drawing Title:




 Drawing No.                         Revision

                                     01

Page 81

 Client:




 Client:




            ERICSSON

 Client:




 Project:


NATIONAL BROADBAND
     NETWORK

       COOROIBAH




Rev Date     Revision Details




 DESIGNER:                      JR
 CHECKED:                       MR
 APPROVED:                      LS
 Drawing Title:




 Drawing No.                         Revision

                                     01

Page 82

Appendix B - Copy of Title




                             76


[OCR of page images]
Appendix B - Copy of Title

76

Page 83

                      CURRENT TITLE SEARCH
               DEPT OF NATURAL RESOURCES AND MINES, QUEENSLAND
 Request No: 21860518
Search Date: 21/09/2015 10:14                      Title Reference: 15366038
                                                      Date Created: 06/05/1975

Previous Title: 14965161

REGISTERED OWNER

Dealing No: 702642905    28/04/1998

REBEKAH GEORGINA TIMMS

ESTATE AND LAND

 Estate in Fee Simple

 LOT 47     REGISTERED PLAN 136461
            County of MARCH                Parish of NOOSA
            Local Government: NOOSA

EASEMENTS, ENCUMBRANCES AND INTERESTS

     1. Rights and interests reserved to the Crown by
        Deed of Grant No. 14724201 (POR 319)
        Deed of Grant No. 14724202 (POR 319)

     2. MORTGAGE No 709682084 15/06/2006 at 11:39
        ADELAIDE BANK LIMITED A.B.N. 54 061 461 550

     3. TRANSFER No 711321772 07/01/2008 at 14:04
        MORTGAGE: 709682084
        COMMONWEALTH BANK OF AUSTRALIA A.B.N. 48 123 123 124

     4. MORTGAGE No 711321774 07/01/2008 at 14:04
        COMMONWEALTH BANK OF AUSTRALIA A.B.N. 48 123 123 124

ADMINISTRATIVE ADVICES - NIL
UNREGISTERED DEALINGS - NIL


CERTIFICATE OF TITLE ISSUED - No

Caution - Charges do not necessarily appear in order of priority

                         ** End of Current Title Search **

COPYRIGHT THE STATE OF QUEENSLAND (DEPT OF NATURAL RESOURCES AND MINES) [2015]
Requested By: D-ENQ INFOTRACK PTY LIMITED




                                                                      Page 1/1

Page 84

Appendix C - Code Table Assessment
Table E1 – Compliance with the Specific Outcomes and Probable Solutions for the Cooroibah Locality

     Specific Outcomes               Probable Solutions                      Comments


Effects of use


Amenity                            No solution provided              Complies.

O1     Uses     are    located,                                      The proposed facility will
designed and operated to                                             not    have    a   significant
avoid    significant   adverse                                       impact on the light, air
changes to the light, air                                            quality,       noise,       or
quality, noise, accessibility or                                     accessibility.
other conditions enjoyed by
users of associated, adjoining                                       The access will be gained
or nearby uses.                                                      off Jirrima Crescent via the
                                                                     existing   driveway.      Once
                                                                     installed, the proposal will
                                                                     not generate a significant
                                                                     volume     of    traffic.   As
                                                                     maintenance is required 3
                                                                     to 4 times annually, it will
                                                                     not affect the access or
                                                                     increase traffic flows to the
                                                                     site, which is privately
                                                                     owned.

                                                                     As    previously     outlined
                                                                     within Section 8.1 of this
                                                                     report, due consideration
                                                                     has been given to the
                                                                     merits of the selected site,
                                                                     which     offers   significant
                                                                     physical     separation     to
                                                                     potentially sensitive land
                                                                     uses       and      extensive
                                                                     screening will be afforded
                                                                     by the mature vegetation
                                                                     located on-site and in the
                                                                     surrounding area.


Entrances                          No solution provided              Complies.

O2    The    southern  and                                           The proposed development
northern entrances to the                                            is located within the Rural
Cooroibah     locality are                                           Settlement            Zone,
characterised by bushland,                                           established to the east of


                                                                                                     77

Page 85

     Specific Outcomes              Probable Solutions           Comments


which is protected from                                   the Cooroibah township and
visually         intrusive                                will not adversely affect the
development.                                              bushland               which
                                                          characterises the north and
                                                          south      entrances       to
                                                          Cooroibah.


Major road network                 No solution provided   Complies.

O3 The function of, and                                   McKinnon Drive is located
visual amenity and character                              approximately 3km to the
surrounding the, major road                               west, and Lake Cooroibah
network, including McKinnon                               Road        is      located
Drive and Lake Cooroibah                                  approximately 900m east of
Road    is   protected  and                               the subject site. At these
enhanced.                                                 distances, the proposal will
                                                          not impact on the function,
                                                          visual amenity or character
                                                          of the major road network
                                                          in Cooroibah.


Built Form


Density                            No solution provided   Not applicable.

O4     The   density     of                               The proposed facility is not
development within the site                               a residential development
area—                                                     and will not increase the
                                                          density of the surrounding
a)    is  compatible  with                                area.
surrounding   development;
and

b) has a low site impact to
enhance the opportunity to
maintain       natural      site
characteristics,      including
native vegetation and natural
landforms.


Height                        S5.1 Buildings and other Does not comply.
                              structures have a maximum
O5    Buildings   and   other building height of—         The proposed development
structures—                                               is located within the Rural
                              a) if in the Rural or Rural Settlement Zone and will
a) are low rise and present a Settlement Zone—8m, or comprise         a     monopole
building height consistent 9m where the pitched roof structure of 45 m in height.
with structures on adjoining


                                                                                    78

Page 86

    Specific Outcomes            Probable Solutions                 Comments


and surrounding premises;      but no other part of the Nonetheless, the proposed
                               building      or     structure use     will  not   visually
b) have a maximum building exceeds 8m; or                     dominate      the    street,
height of 2 storeys;                                          surrounding spaces or the
                               b) in all other zones—8m.      existing skyline for the
c) do not visually dominate
                                                              following reasons:
the    street,    surrounding
spaces    or    the   existing                                    • Existing      mature
skyline;                                                              vegetation on both
                                                                    the subject site and
d) preserve the amenity of
                                                                    within the wider area
surrounding land;
                                                                    will     assist     in
e) respect the scale of                                             minimising the visual
surrounding vegetation; and                                         impact of the facility
                                                                    when viewed from
f) respond to the topography                                        surrounding
of     the site  and   avoid                                        dwellings and roads;
extensive   excavation   and
filling.                                                        •   The proposed facility
                                                                    location at the rear
                                                                    of a rural residential
                                                                    allotment    provides
                                                                    for separation from
                                                                    neighbouring
                                                                    dwellings;        the
                                                                    closest of which is
                                                                    220 m to the north-
                                                                    east.

                                                                •   The location enables
                                                                    the height of the
                                                                    proposed facility to
                                                                    be restricted to 45 m
                                                                    and     a     monopole
                                                                    structure whilst still
                                                                    achieving coverage
                                                                    to all the targeted
                                                                    localities           and
                                                                    obtaining      line   of
                                                                    sight      to      other
                                                                    planned sites in the
                                                                    nbn™            wireless
                                                                    network;

                                                                •   A    monopole    was
                                                                    selected    as    the
                                                                    preferred   structure
                                                                    over a lattice tower


                                                                                         79

Page 87

    Specific Outcomes            Probable Solutions                 Comments


                                                                    design as this type
                                                                    of facility can remain
                                                                    slim line and is less
                                                                    visually      obtrusive
                                                                    when viewed from a
                                                                    distance; and

                                                             Furthermore,        extensive
                                                             excavation and filling will be
                                                             avoided.

                                                             For these reasons, the
                                                             height of the facility is
                                                             considered to comply with
                                                             O5.


Setbacks                      S6.1      Buildings    and Complies.
                              structures comply with the
O6    Buildings  and    other setbacks     specified   in In        accordance        with
structures are appropriately Schedule 1 - Minimum Schedule 1, the proposed
designed and sited to—        Boundary Setbacks.          facility has been set back
                                                          approximately 360 m from
a) provide amenity for users                              the street frontage, 45 m
of the premises as well as                                from         the       southern
preserve the visual and                                   boundary, approximately 65
acoustic privacy of adjoining                             m      from     the    northern
and nearby properties;                                    boundary,                    and
                                                          approximately 25 from the
b) preserve any existing
                                                          western boundary, which is
vegetation on the site that
                                                          compliant         with       the
will buffer the proposed
                                                          requirements            outlined
building;
                                                          within Schedule 1.
c) allow for landscaping to be
                                                             The proposal complies with
provided between buildings;
                                                             Specific Outcome O6 as it is
d)    maintain  the   visual                                 well      removed       from
continuity and pattern of                                    community          sensitive
buildings   and   landscape                                  locations; and significant
elements within the street;                                  areas of mature vegetation
and                                                          exist on-site and within the
                                                             surrounding area, which will
e) help protect the natural                                  help to mitigate potential
character and visual amenity                                 visual impacts associated
of the Noosa River system.                                   with the development.

                                                             The     development   will
                                                             require the removal of
                                                             vegetation (approximately


                                                                                        80

Page 88

Specific Outcomes   Probable Solutions          Comments


                                         30 m2) for access and in
                                         association      with     the
                                         proposed waterway barrier
                                         works. However, the facility
                                         has been intentionally sited
                                         on     a   property     which
                                         contains vegetation in order
                                         to utilise natural screening
                                         benefits,   but    within    a
                                         location which is relatively
                                         clear, thus minimising the
                                         extent of clearing required.

                                         The proposed clearing is to
                                         occur adjacent to existing,
                                         pre-cleared areas, resulting
                                         in minimal impact on flora
                                         and fauna linkages and to
                                         avoid any fragmentation of
                                         vegetation. Furthermore, it
                                         is considered that         the
                                         amount      of     vegetation
                                         clearing is relatively minor
                                         given the total area of the
                                         subject         site         is
                                         approximately 4 hectares; a
                                         large portion of which is
                                         vegetated. This in turn will
                                         assist in the protection and
                                         enhancement         of     the
                                         Region’s biodiversity quality
                                         and integrity of habitats.

                                         A pre-clearing flora and
                                         fauna     survey   will  be
                                         undertaken       and    any
                                         relevant approvals sought
                                         prior to the commencement
                                         of any clearing works.

                                         The subject site is located
                                         approximately 1.5km from
                                         Lake    Cooroibah,    which
                                         forms part of the Noosa
                                         River   system.    At   this
                                         distance, the proposal will
                                         not adversely affect the
                                         natural character and visual


                                                                     81

Page 89

     Specific Outcomes              Probable Solutions           Comments


                                                          amenity of the river.


Site cover                         No solution provided   Not Applicable.

O7 The site cover of buildings                            The proposed facility is not
and other roofed structures—                              a    building  or     roofed
                                                          structure.
a) is of a scale that is
compatible with surrounding
development;

a) for a class 1 or class 10a
structure within the Detached
Housing Zone, does not
exceed—

i for a single storey building -
50%; or

ii for a building of 2 or more
storeys - 50% on the ground
floor and 30% for the upper
storey(s), or 40% for all
storeys for a building of 2 or
more storeys;

b) for other classes within the
Detached House Zone - 40%;

c) does not present an
appearance    of    bulk    to
adjacent properties, roads or
other areas in the vicinity of
the site;

d) maximises the retention of
existing mature trees and
allows for additional deep
landscaping         between
buildings;

e) allows for adequate area
at ground level for outdoor
recreation,     entertainment,
clothes drying and other site
facilities; and

f)     facilitates onsite
stormwater management and



                                                                                    82

Page 90

    Specific Outcomes            Probable Solutions                  Comments


vehicular access.


Flooding and drainage           S8.1 For new buildings or Complies.
                                structures or additions of
O8 Buildings and other works more than 50m2 gross floor While the subject property
are designed and sited to—      area to an existing building is identified as containing
                                or structure, floor levels for areas subject to flooding as
a) provide flood free access                                   per the Planning Scheme
                                habitable rooms are—
to premises and flood free                                     mapping,     the    proposed
habitable areas;                a) for areas where minimum development is a small
                                floor levels are available— scale, non-habitable use
b) allow only minor, short
                                not less than the specified considered to be consistent
term and infrequent flooding
                                level;                         with the nature of the
of non-habitable areas;
                                                               identified hazard.
                                b) for areas where flood
c) ensure carparking areas
                                modelling is available—a The relatively small scale of
can be adequately drained;
                                minimum of 500mm above the development (120 m2
d) ensure drainage does not the modelled flood level; compound area) will not
adversely impact upon other and                                exacerbate     flooding   or
premises; and                                                  ponding on the site or on
                                c) for areas where flood nearby land. Furthermore,
e) ensure filling or excavation modelling is not available, a the proposal is for a non-
does not adversely impact minimum of 500mm above habitable use and will not
upon other premises by—         the highest known flood increase the number of
                                level;                         people living or working on-
i. causing ponding on the site
                                                               site.
or nearby land;                 AND
                                                             Any excavated material will
ii. increasing flooding, which S8.2      Where       Council
                                                             be distributed across the
adversely affects the safety infrastructure is available—
                                                             site in a location that will
or use of any land upstream
                               a) any drainage (from not worsen the flood hazard
and downstream; and
                               buildings and land) flows to on the site or surrounding
iii. adversely affecting the that infrastructure; and        premises. The proposal will
flow of water in any overland                                not include car parking and
                               b) the infrastructure has the will      only       require
flow path.
                               capacity to accept any maintenance 3 to 4 times
                               additional loading.           annually.

                               AND

                               S8.3    Car   parking  and
                               maneuvering     areas   are
                               constructed at a level that
                               permits the parking area to
                               drain from the site by
                               gravity means, without the
                               need      for    mechanical




                                                                                        83

Page 91

    Specific Outcomes              Probable Solutions                  Comments


                                 pumping; or

                                 S8.4      Basements      for
                                 residential uses have flood
                                 immunity above the Q100
                                 where alternative means to
                                 mechanical pumping are
                                 used    to   achieve  such
                                 immunity; or

                                 S8.5 Basements for non-
                                 residential uses have flood
                                 immunity above the Q100
                                 that may be achieved by
                                 means       of     mechanical
                                 pumping only where the
                                 mechanical       feature    is
                                 installed    with    adequate
                                 holding    tanks     and   an
                                 alternative back up power
                                 source.


Roof form                       S9.1 The main roof of the Not applicable.
                                building has a roof pitch no
O9 Rooflines—                   less than 5 degrees and has The proposed development
                                minimum 600mm eaves to does not involve a building.
a) contribute positively to the
                                at    least  75%     of   the
local skyline;
                                perimeter of the building;
b) complement the character
                            AND
of the locality;
                               S9.2       Buildings        and
c) are articulated, pitched or
                               structures do not       include
skillion;
                               roof top terraces.
d) avoid low pitched (eg. less
than 5 degrees) or box
profiles/parapets;

e) do not create opportunities
for residents to overlook the
private open space areas of
neighbouring properties.


Materials and finishes           S10.1 Buildings—                 Complies.

O10 Buildings and other a) use a mix of lightweight The proposed monopole will
structures use materials and and     textured     external be have a non-reflective,
finishes that complement the building materials, including galvanised finish to help


                                                                                  84

Page 92

     Specific Outcomes               Probable Solutions                    Comments


rural character and integrate timber,  corrugated   iron, integrate the facility with
with the surrounding natural steel and weatherboard; or the surrounding landscape.
landscape.
                              b) use masonry construction
                              with where variation in
                              texture, detailing and the
                              like;

                                    c) use materials and finishes
                                    that    blend    with     the
                                    surrounding vegetation.


Environment, Conservation and Recreation


Environment and cultural No solution provided                       Complies.
heritage values
                                                                    The proposed development
O11 There are no significant                                        will have a minor impact on
adverse        effects      on                                      environmental values of the
biodiversity,           native                                      site.
vegetation,            habitat,
landscape     quality,   water                                      The      development      will
quality or cultural heritage                                        require the removal of
values,     including    those                                      vegetation (approximately
related to—                                                         30 m2) for access and in
                                                                    association      with     the
a)   changes      to      natural                                   proposed waterway barrier
drainage;                                                           works. However, the facility
                                                                    has been intentionally sited
b) disturbance of the wetland                                       on     a   property     which
system;                                                             contains vegetation in order
                                                                    to utilise natural screening
c) management of landslide
                                                                    benefits,   but    within    a
and fire risk;
                                                                    location which is relatively
d) erosion and the transport                                        clear, thus minimising the
of sediments off site;                                              extent of clearing required.

e) unmanaged public access;                                         The proposed clearing is to
                                                                    occur adjacent to existing,
f) effluent disposal46;                                             pre-cleared areas, resulting
                                                                    in minimal impact on flora
g) changes to fauna habitat
                                                                    and fauna linkages and to
and behaviour; and
                                                                    avoid any fragmentation of
h) disturbance of buildings                                         vegetation. Furthermore, it
and     features,     including                                     is considered that        the
natural features, of cultural                                       amount      of     vegetation
heritage significance.                                              clearing is relatively minor
                                                                    given the total area of the


                                                                                               85

Page 93

Specific Outcomes   Probable Solutions          Comments


                                         subject         site         is
                                         approximately 4 hectares; a
                                         large portion of which is
                                         vegetated. This in turn will
                                         assist in the protection and
                                         enhancement         of     the
                                         Region’s biodiversity quality
                                         and integrity of habitats.

                                         The waterway barrier works
                                         associated      with     this
                                         application will only involve
                                         the replacement of the
                                         existing     culvert.    The
                                         proposed       works      will
                                         incorporate       appropriate
                                         construction    controls   to
                                         minimise run off from the
                                         work site and minimise
                                         works undertaken within
                                         the waterway. Any potential
                                         impacts on natural drainage
                                         and wetland systems are
                                         proposed to be managed
                                         through            mitigation
                                         measures including:

                                            •   All works will be
                                                undertaken          in
                                                accordance with the
                                                guidelines presented
                                                within the Code for
                                                self-assessable
                                                development – Minor
                                                waterway       barrier
                                                works – Part 3:
                                                culvert crossings;

                                            •   Construction works
                                                will be undertaken
                                                during periods of low
                                                rainfall or when the
                                                stream is dry. This
                                                will minimise the
                                                potential    impacts
                                                associated       with
                                                scouring,     erosion
                                                and sedimentation.


                                                                     86

Page 94

Specific Outcomes   Probable Solutions       Comments


                                             In addition, it will
                                             minimise impact to
                                             aquatic species that
                                             may normally be
                                             located within the
                                             subject site when it
                                             is inundate;

                                         •   Alternatively,     the
                                             waterway can be
                                             temporarily blocked
                                             and drained to allow
                                             for construction in
                                             dry conditions. A
                                             spotter-catcher
                                             would be required to
                                             be present during
                                             drainage works to
                                             ensure     the    safe
                                             relocation of fauna
                                             from the waterway
                                             to             further
                                             downstream.        The
                                             waterway     will   be
                                             reinstated        post
                                             construction works.

                                         •   Works will be limited
                                             to    the   minimum
                                             disturbance area as
                                             far as practicable;
                                             and

                                         •   There will be no
                                             additional temporary
                                             waterway       barrier
                                             works      associated
                                             with construction. All
                                             construction
                                             materials         and
                                             machinery will be
                                             stored          within
                                             designated laydown
                                             areas away from the
                                             waterway. Stockpiles
                                             will be protected by
                                             suitable     drainage
                                             diversion structures


                                                                87

Page 95

    Specific Outcomes            Probable Solutions                 Comments


                                                                    and/or covered to
                                                                    minimise      contact
                                                                    with rainfall and/or
                                                                    stormwater.

                                                             Furthermore, the facility will
                                                             not      cause     significant
                                                             sediment run-off, impact on
                                                             effluent disposal or increase
                                                             the risk of fire.

                                                             There is no significant
                                                             cultural  heritage   values
                                                             present on the subject site.

                                                             Therefore, the proposal is
                                                             considered to be consistent
                                                             with O15.


Open space network               S12.1 Open space corridors Not applicable.
                                 and     existing    native
O12 An integrated open vegetation               in    areas The subject site is located
space network is established, indicated in Schedule 5 – outside of open space
enhanced      and     protected Map 4 are protected from corridors and is not within
throughout the locality to—      fragmentation          and the       existing     native
                                 encroachment            by vegetation as outlined on
a) provide for both passive                                 Map      4     Open    Space
                                 development.
and     active     recreational                             Networks. Additionally, the
pursuits;                                                   subject site is not shown on
                                                            the Heritage Overlay as
b) provide connectivity for
                                                            being located within close
pedestrians,    cyclists,   and
                                                            proximity to any heritage
horse riders;
                                                            sites or character areas, nor
c)       provide         habitat                            is the subject site identified
connectivity for wildlife;                                  on the Pathways and Trunk
                                                            Network Infrastructure Map
d) protect watercourses and                                 as being located within
drainage lines;                                             proximity of any pathways
                                                            or bike paths.
e) protect vegetation on
steep slopes; and

f) form a scenic backdrop for
residential development.




                                                                                        88

Page 96

    Specific Outcomes           Probable Solutions                  Comments


Noosa Trail Network           S13.1 No solution provided      Not applicable.

O13       A     comprehensive S14.1 Development includes The subject site is not
network of bridle trails and linkages to or between identified on the Noosa Trail
pedestrian      and      bicycle existing      or      future Network Map as being
linkages     is     established, components of the Noosa located adjacent or within
enhanced      and     protected Trail Network, as indicated proximity to a current or
incorporating road reserves, in Schedule 5 – Map 3;           future   identified trail
State forests, Council owned                                  network.
land    and     private    lands AND
consistent with the lifestyle
                                 S14.2 Development does
and outdoor recreation needs
                                 not have an adverse impact
of the Shire’s residents and
                                 on the access functions of
visitors;
                                 the Noosa Trail Network, as
AND                              indicated in Schedule 5 –
                                 Map 3, including severing of
O14 Existing and future existing or future linkages;
pedestrian, bridle trail or or
bicycle linkages are retained
as part of a Shire wide trail S14.3 Alternative linkages
network.                         to    those   indicated   in
                                 Schedule 5 – Map 3 are
                                 provided;

                              AND

                              S14.4 Linkages to the Noosa
                              Trails Network are designed
                              and       constructed     in
                              accordance with—

                              a)    Australian     Standard
                              2156.1 Walking Tracks Part
                              1:     Classification     and
                              Signage to a minimum of a
                              Class 4 Standard; and

                              b)     Australian   Standard
                              2156.2 Walking Tracks Part
                              2. Infrastructure Design


Pedestrian    and   bicycle S15.1 Pedestrian and bicycle Not applicable.
pathways                     pathways are provided and
                             retained where indicated in The subject site is not
O15 Safe and convenient the Priority Infrastructure located adjacent to an
pedestrian    and    bicycle Plan in Part 15;            identified pedestrian and/or
pathways are provided and                                bike path under Schedule 5
retained between and around


                                                                                     89

Page 97

    Specific Outcomes    Probable Solutions                     Comments


key destinations.       AND                            Map 2.

                        S15.2 Contributions toward
                        pedestrian    and    bicycle
                        pathways are provided in
                        accordance with the Priority
                        Infrastructure Plan in Part
                        15.




                                                                           90

Page 98

Table E2 - Compliance with the Specific Outcomes and Probable Solutions of the Infrastructure Uses
Code

     Specific Outcomes              Probable Solutions                    Compliance


Effects of use


Location and siting            S1.1 For Installations and Does not comply.
                               Towers, where practicable,
O30 The location and siting infrastructure is —            Access to the subject site
of Infrastructure Uses—                                    will be provided via the
                               a) co-located with existing existing access point from
a) maximises accessibility for Infrastructure Uses; or     Jirrima     Crescent.     An
maintenance purposes; and                                  extension to the existing
                               b) located on or within an internal access track will be
b) does not disrupt access for existing building;
                                                           required. Sufficient parking
other purposes.
                                                           and manoeuvring space is
                               AND
                                                           available    on    site    to
                               S1.2 Easements for access accommodate            vehicles
                               to Infrastructure Uses are  undertaking  maintenance   to
                               granted to the Council or the facility.
                                  the    beneficiary of   the
                                                              While nbn seeks to install
                                  easement to ensure suitable
                                                              new facilities with existing
                                  access can be gained, where
                                                              structures, no opportunities
                                  practicable.
                                                              were identified during the
                                                              candidate     selection    that
                                                              would     offer   appropriate
                                                              separation to potentially
                                                              sensitive uses and meet the
                                                              coverage      objectives     to
                                                              serve       the       targeted
                                                              dwellings. As such, a new
                                                              monopole is proposed and
                                                              will be located to the rear of
                                                              the property, away from
                                                              existing dwellings in the
                                                              area and sited in a location
                                                              that       benefits       from
                                                              vegetation screening.

                                                                  Furthermore, the proposed
                                                                  facility has been located on
                                                                  a rural residential property,
                                                                  which affords significant
                                                                  separation     distances   to
                                                                  dwellings and is considered
                                                                  a compatible use in the
                                                                  rural setting.

                                                                  For    these    reasons,    the


                                                                                               91

Page 99

    Specific Outcomes            Probable Solutions                  Compliance


                                                              proposal is considered to
                                                              comply     with    Specific
                                                              Outcome O30.


Separation               from No solution provided.           Complies.
incompatible uses
                                                              The proposed facility has
O31     Sufficient  separation                                been located to the rear of
distance is provided between                                  the property, approximately
Infrastructure     Uses   and                                 220m from the closest
incompatible uses on the                                      dwelling. At this distance,
same site and neighbouring                                    the proposed facility is
premises to maintain amenity                                  afforded            significant
for neighbouring uses.                                        separation from potentially
                                                              sensitive uses. The location
                                                              of the compound is near
                                                              existing mature vegetation
                                                              which will integrate the
                                                              monopole        with        the
                                                              surrounding landscape and
                                                              respect the character of the
                                                              rural residential area.

                                                              As such, the proposal meets
                                                              the outcomes sought in
                                                              Specific Outcome O31.


O32 Vehicular access to the S3.1. Vehicle access to the Complies.
site of the Infrastructure Use infrastructure is gained from
does not adversely impact on roads      other    than    local The proposed facility will be
residential amenity.           residential     streets      to accessed from an existing
                               maintain            residential vehicle access point to the
                               amenity.                        site. An extension to the
                                                               internal access track is
                                                               required     to   meet    the
                                                               location of the compound.

                                                              Additionally, the waterway
                                                              barrier works associated
                                                              with this application will
                                                              only        involve      the
                                                              replacement of the existing
                                                              culvert. The proposed works
                                                              will incorporate appropriate
                                                              construction    controls  to
                                                              minimise run off from the
                                                              work site and minimise
                                                              works undertaken within


                                                                                          92

Page 100

    Specific Outcomes             Probable Solutions            Compliance


                                                         the waterway. Any potential
                                                         impacts associated with the
                                                         works are proposed to be
                                                         managed            through
                                                         appropriate       mitigation
                                                         measures;     impacts     on
                                                         residential amenity will be
                                                         minimal.

                                                         Once       installed      and
                                                         operational, the facility will
                                                         only require maintenance 3-
                                                         4 times per year and is
                                                         unlikely     to    have     a
                                                         significant impact on the
                                                         residential amenity of the
                                                         surrounding area.

                                                         For these reasons, the
                                                         proposal is considered to
                                                         comply     with    Specific
                                                         Outcome O32.


Building siting and design       No solution provided.   Complies.

O33 The siting and design of                             As mentioned in response
buildings or other structures                            to O32, the nbn compound
reflects and is compatible                               has been intentionally sited
with     the    setting   and                            away       from    potentially
character of the locality in                             sensitive uses and near
which the Infrastructure Use                             existing mature vegetation
is located, including the use                            that will help integrate the
of      sympathetic     colour                           slimline monopole design
schemes.                                                 with      the    surrounding
                                                         landscape. The monopole
                                                         will feature a non-reflective,
                                                         galvanised finish which will
                                                         assist in blending the facility
                                                         into its surroundings.

                                                         Accordingly, the proposal is
                                                         considered compliant with
                                                         Specific Outcome O33.


Safety and security          S5.1 For Installations and Complies.
                             Towers—the use is fenced
O34 Infrastructure Uses are with security fencing;      The lease area for the
secure and potential impacts                            facility will be surrounded


                                                                                     93

Page 101

    Specific Outcomes            Probable Solutions                 Compliance


from      vandalism        are AND                          by a 2.4m high chain link
minimised.                                                  fence and will prevent
                               S5.2         For       other public   access    to    any
                               Infrastructure      Uses—no unauthorised       personnel,
                               probable solution            which is consistent with the
                                                            outcomes sought in Specific
                                                            Outcome O34.


Artificial lighting              S6.1 Lighting associated Not Applicable.
                                 with the use is designed,
O35 The generation of spill installed,       operated     and The facility will not require
light by development, which maintained in accordance the installation of lighting.
gives rise to annoyance, with Section 3 of AS4282
discomfort, distraction or a The Control of the Obtrusive
reduction in the ability to see Effects of Outdoor Lighting.
essential    information,     is
avoided.


Mechanical      plant     and S7.1 Plant and equipment Complies.
equipment                      are—
                                                           The proposed facility will be
O36 Mechanical plant and a) located more than 2m located near the western
equipment     (including   air from        any    property boundary of the property.
conditioning       equipment) boundary; and                The nbn compound will
are—                                                       benefit    from     significant
                               b)    screened  by   dense boundary        setbacks      at
a) positioned to minimise vegetation or fencing (i.e. approximately 25m from
adverse impacts on the 1.5m wide vegetated buffer the western boundary, 45m
amenity of any residential area);                          from        the       southern
premises;                                                  boundary, 65m from the
                               OR
                                                           northern     boundary,      and
b) designed and positioned to
                                                           360m     from     the    street
visually integrate with the S7.2 Plant and equipment
building and roof design; and are      located within    a frontage.
                               building.
                                                           Furthermore, the property
c) appropriately screened.
                                                           currently              contains
                                                           vegetated areas which will
                                                           help screen the facility from
                                                           dwellings to the north,
                                                           south, and east. The nature
                                                           reserve to the west of the
                                                           site contains dense mature
                                                           vegetation, which acts as a
                                                           buffer between the facility
                                                           from the higher density
                                                           residential         settlement
                                                           situated to the west. This



                                                                                        94

Page 102

Specific Outcomes   Probable Solutions          Compliance


                                         vegetation will also act as a
                                         backdrop which will also
                                         help integrate the slimline
                                         monopole        with      the
                                         surrounding        landscape
                                         when viewed from the east.
                                         This is considered to be in
                                         accordance with S7.1.

                                         Noise      and      vibration
                                         emissions associated with
                                         the proposed facility will be
                                         limited to the construction
                                         phase.    Noise    generated
                                         during    the    construction
                                         phase will be of short
                                         duration and will be in
                                         accordance      with      the
                                         standards outlined in the
                                         Environmental      Protection
                                         Regulation     1998      and
                                         Environmental      Protection
                                         (Noise)     Policy     1997.
                                         Construction works will only
                                         occur between the hours of
                                         7.00am and 6.00pm.

                                         There will be some low level
                                         noise from the ongoing
                                         operation of air conditioning
                                         equipment associated with
                                         the outdoor cabinets, once
                                         installed. Noise emanating
                                         from the air conditioning
                                         equipment       is     at    a
                                         comparable     level    to   a
                                         domestic air conditioning
                                         installation,      and     will
                                         generally accord with the
                                         background noise levels
                                         prescribed by Australian
                                         Standard AS1055. The air
                                         conditioning unit will be well
                                         removed from surrounding
                                         residential dwellings.

                                         For these reasons, the
                                         proposal is considered to


                                                                     95

Page 103

     Specific Outcomes              Probable Solutions         Compliance


                                                         comply    with       Specific
                                                         Outcome O36.


Environment      &     heritage No solution provided.    Complies.
values
                                                         The proposed development
O37 There are no significant                             will have a minor impact on
adverse     effects   on   the                           environmental values of the
biodiversity,           natural                          site.
vegetation, native wildlife,
habitats, landscape quality,                             The proposed facility has
water quality or heritage                                been located on a site with
values,     including    those                           existing vegetation, which
related to—                                              will be protected and serve
                                                         to screen the facility from
a)   changes      to      natural                        dwellings in the surrounding
drainage;                                                area. No landscaping is
                                                         proposed. The development
b) disturbance to any of the                             will require the removal of
wetland systems;                                         vegetation (approximately
                                                         30 m2) for access and in
c) management of landslide
                                                         association      with     the
and fire risk;
                                                         proposed waterway barrier
d) erosion and the transport                             works. However, the facility
of sediments off-site;                                   has been intentionally sited
                                                         on     a   property     which
e) unmanaged public access;                              contains vegetation in order
                                                         to utilise natural screening
f) effluent disposal12;
                                                         benefits,   but    within    a
g) changes to fauna habitat                              location which is relatively
and behaviour; and                                       clear, thus minimising the
                                                         extent of clearing required.
h) disturbance of buildings
and      features,  including                            The proposed clearing is to
natural features, of heritage                            occur adjacent to existing,
significance.                                            pre-cleared areas, resulting
                                                         in minimal impact on flora
                                                         and fauna linkages and to
                                                         avoid any fragmentation of
                                                         vegetation. Furthermore, it
                                                         is considered that        the
                                                         amount      of     vegetation
                                                         clearing is relatively minor
                                                         given the total area of the
                                                         subject        site         is
                                                         approximately 4 hectares; a
                                                         large portion of which is



                                                                                    96

Page 104

     Specific Outcomes              Probable Solutions                    Compliance


                                                                  vegetated. This in turn will
                                                                  assist in the protection and
                                                                  enhancement        of      the
                                                                  Region’s biodiversity quality
                                                                  and integrity of habitats.

                                                                  The proposed facility will be
                                                                  located away from wetland
                                                                  systems and will be unlikely
                                                                  to impact on the natural
                                                                  drainage or cause erosion of
                                                                  the land.

                                                                  Furthermore, the facility will
                                                                  not cause sediment run-off,
                                                                  impact on effluent disposal
                                                                  or increase the risk of fire.

                                                                  There is no significant
                                                                  cultural  heritage   values
                                                                  present on the subject site.

                                                                  Therefore the proposal is
                                                                  consistent  with  Specific
                                                                  Outcome O37.




Table E3 - Compliance with the Specific Outcomes and Probable Solutions of the Infrastructure Uses
Code: Service & Utility Type 3 - Tower

     Specific Outcomes              Probable Solutions                    Compliance




                                                                                               97

Page 105

    Specific Outcomes            Probable Solutions                 Compliance


Effects of use


Visual amenity                  S10.1 The tower is—          Complies.

O39 The tower is visually a) not established in the The proposal is located in
integrated with its landscape Detached Housing, Semi- the Rural Settlement Zone
or townscape setting so as Attached Housing, Attached and not in a zone listed
not to be visually dominant Housing or Visitor Mixed Use under      S10.1   (a).   The
or obtrusive.                 Zones;                       slimline   monopole     will
                                                           appear unobtrusive when
                              b) camouflaged through the viewed         from       the
                              use of colours and materials surrounding road network,
                              which    blend    into  the in particular major roads,
                              surrounding landscape; and such as Lake Cooroibah
                                                           Road               (located
                              c) unobtrusive when viewed
                                                           approximately 900m to the
                              from any part of the major
                                                           east) and McKinnon Drive
                              road network;13 or
                                                           (located approximately 3km
                              S10.2 The tower is co- to west).
                                located   on   an   existing
                                                             Furthermore, the proposed
                                telecommunication tower;
                                                             location of the compound
                                AND                          will    benefit    from   the
                                                             existing, mature vegetation
                                S10.3 The height of the established both on site and
                                tower does not exceed—       on neighbouring properties,
                                                             which     will   assist  with
                                a) 20 metres where on land
                                                             visually    integrating   the
                                in the Community Services,
                                                             facility with the surrounding
                                Business Centre or Industry
                                                             landscape.
                                Zones; or
                                                           For these reasons, the
                                b) 25 metres where on land
                                                           proposal is considered to
                                in the Rural Zone.
                                                           comply     with    Specific
                                                           Outcome O39.


Health and safety               No solution provided.        Complies.

O40 The development avoids                                   The nbn compound will be
or effectively manages any                                   secured by a 2.4m high
emissions of light, noise,                                   chainwire fence to prevent
vibration or radiation beyond                                public       access      to
the site such that—                                          unauthorised      personnel.
                                                             Warning    signs    will be
a) environmental nuisance to                                 mounted to the external
occupants   or    users   of                                 fence and the gate will be
surrounding premises is not                                  locked.



                                                                                       98

Page 106

    Specific Outcomes            Probable Solutions          Compliance


caused;                                               The facility is designed to
                                                      operate in compliance with
b) unacceptable risks to the                          the mandatory standard for
environment or to personal                            human exposure to EME–
and public safety are unlikely                        currently      the     Radio
to be caused; and                                     communications
                                                      (Electromagnetic Radiation
c) public access is restricted
                                                      Human Exposure) Standard
to meet workplace, health
                                                      2003. Further detail is
and safety requirements.
                                                      provided in Section 8.11.1
                                                      of this report and an EME
                                                      Report associated with this
                                                      site    is    attached    in
                                                      Appendix E.

                                                      The proposed facility will
                                                      not require the installation
                                                      of lighting.

                                                      Noise      and      vibration
                                                      emissions associated with
                                                      the proposed facility will be
                                                      limited to the construction
                                                      phase.    Noise    generated
                                                      during    the    construction
                                                      phase will be of short
                                                      duration and will be in
                                                      accordance      with      the
                                                      standards outlined in the
                                                      Environmental      Protection
                                                      Regulation     1998      and
                                                      Environmental      Protection
                                                      (Noise)     Policy     1997.
                                                      Construction works will only
                                                      occur between the hours of
                                                      7.00am and 6.00pm.

                                                      There will be some low level
                                                      noise from the ongoing
                                                      operation of air conditioning
                                                      equipment associated with
                                                      the outdoor cabinets, once
                                                      installed. Noise emanating
                                                      from the air conditioning
                                                      equipment       is     at    a
                                                      comparable     level    to   a
                                                      domestic air conditioning
                                                      installation,      and     will


                                                                                  99

Page 107

    Specific Outcomes            Probable Solutions                 Compliance


                                                             generally accord with the
                                                             background noise levels
                                                             prescribed by Australian
                                                             Standard AS1055. The air
                                                             conditioning unit will be well
                                                             removed from surrounding
                                                             residential dwellings.

                                                             For these reasons, the
                                                             proposal is considered to
                                                             comply     with    Specific
                                                             Outcome O40.


Access to sunlight          S12.1       For       proposed Complies.
                            buildings     or     structures
O41 The Tower does not cast having a height exceeding The proposed facility has
shadows    such  that   the 8.5m above ground level been located on private
amenity    of   surrounding and a cross sectional area land and will not be in close
premises or useability of exceeding 20m2, shadowing proximity to public open
public open space is unduly does not affect residential space.           The      closest
reduced.                    lots, child care centres or     residential    dwelling     is
                            public open space to the located               approximately
                            extent of more than 20% of      220m    away    and at this
                            their site area for a period in distance,    will   not    be
                            excess of three hours on        affected  by  any shadowing
                            any day of the year.            resulting      from       the
                                                            monopole.

                                                             As  such,    the   proposal
                                                             complies with O41.




                                                                                       100

Page 108

Appendix D - Environmental Searches




                                      101


[OCR of page images]
Appendix D - Environmental Searches

101

Page 109

11/9/2015 Aboriginal and Torres Strait Islander Cultural Hertiage Database and Register

Aboriginal and Torres Strait Islander Cultural Heritage
Database and Register

Search Request - Submission Details

Your search request has been successfully submitted. Your search request reference
number is 3668

Please record this reference number for future identification of the search request.

https://culturalheritage.datsip.qld.gov.au/achris/public/application-for-advice/enter

1M

Page 110

11/9/2015

Search Results

No results found.

Australian Heritage Database

Enter at least one search criterion.

Search Hints

Place name

Street name
Jirrima Cresent

Town or suburb
Cooroibah

Country
Australia

List
All Lists

Different lists will provide different status and class options

Local Government Area

Legal status
--All-- ¥

Keyword Search

¥ Description

Latitude/Longitude

Longitude 1

Wholly within region

v
¥ Statement of Significance
N
Latitude 1
S Longitude 2
Latitude 2 E E
Ss
Ss

© Wholly or partially within region

Longitude coordinates should be entered as ddd.mm.ss
Latitude coordinates should be entered as dd.mm.ss

Map Ref No

1:100,000 eg 2357
1:250,000 eg SF-50-01

Search Hints

Search Reset form

State
Queensland v

Place ID number

Class
--All-- ¥

¥ Place history

© Not all fields need to be filled in. The fewer you fill in the more results you will get.
e Ifyou cannot find a place, check spelling and try alternative names. Reduce the number of words that you include

and use fewer fields.

http:/Awww.environment.gov.au/cgi-bin/ahdb/search.pl

1/2

Page 111

11/9/2015 Australian Heritage Database

e The Local Government field used on its own will provide a comprehensive list of places in an area.

 

Report Produced: Mon Nov 9 17:28:54 2015

 

Accessibility | Disclaimer | Privacy | © Commonwealth of Australia

 

 

 

http:/Awww.environment.gov.au/cgi-bin/ahdb/search.pl

2/2

Page 112

                       152 °59 '2 0"E                                    152 °59 '3 0"E                152 °59 '4 0"E                            152 °59 '5 0"E                   153 °0'0"E                             153 °0'10 "E             153 °0'20 "E             153 °0'30 "E               153 °0'40 "E
26° 20'30 "S




                                                                                                                                                                                                                                                                                                                              26° 20'30 "S
                                                                                                                                                                                                       AM
                                                                                                                                                                                                              AR
                                                                                                                                                                                                                O
                                                                                                                                                                                                                    O
                                                                                                                                                                                                                        PL
                                                                                                                                                                                                                          AC
                                                                                                                                                                                                                               E
26° 20'40 "S




                                                                                                                                                                                                                                                                                                                              26° 20'40 "S
26° 20'50 "S




                                                                                                                                                                                                                                                                                                                              26° 20'50 "S
                                                                                                                                                                 NE
                                                                                                                                                            LA
                                                                                                                                                        R
                                                                EX
                                                                   F                                                                                  TE
                                                                                                                                                 AS
                                                                                                                                             C
                                                                  O




                                                                                                                                         N
                                                                       RD




                                                                          CO                                                        LA
                                                                             U
                                                                                 RT
                               OAD
26° 21'0"S




                                                                                                                                                                                                                                                                                                                              26° 21'0"S
                        GATE R
                  GREEN




                                                                                                          AD
                                                                     E
                                                                DRI V




                                                                                                             E
                                                                                                             NSF
                                                               GTON




                                                                                                                 IE LD COURT
                                                          EDIN




                                                                                                                                                                                                         NT
26° 21'10 "S




                                                                                                                                                                                                                                                                                                                              26° 21'10 "S
                                                                                               RI VE




                                                                                                                                                                                                            E
                                                                                                                                                                                                        ES C
                                                                                        ON E D




                                                                                                                                                                                                      A CR
                                                                                         NST




                                                                                                                                                                                                         IM
                                                                                                                                                                                                    JIRR
                                                                                      VO
                                                                                      DE




                                                                                                                                                                                                                                                                                                              E
                                                                                                                                                                                                                                                                                                           IV
                                                                                                                                                                                                                                                                                                               D




                                                                                                                                                                                                                                                                                                       R
                                                                                                                                                                                                                                                                                                       D   E
                                                                                                                                                                                                                                                                                                    SI
                                 CR
26° 21'20 "S




                                                                                                                                                                                                                                                                                                                              26° 21'20 "S
                                                                                                                                                                                                                                                                                                KE
                                    A   IG




                                                                                                                                                                                                                                                                                              LA
                                          SL
                                               EA
                                                    CO
                                                         UR
                                                            T                                                                                                                                                                                                                                      LAKEWA
                                                                                                                                                                                                                                                                                                         Y DRIVE




                                                                                                                                                                                                                                                                                                                   PIN
               WO
                 OD




                                                                                                                                                                                                                                                                                                                       ES
                    H         AV
                                 EN




                                                                                                                                                                                                                                                                                                                          A
                                                                                                                                                                                                                                                                                                      SU
                                    WA




                                                                                                                                                                                                                                                                                                                       VE
                                      Y




                                                                                                                                                                                                                                                                                                         NS




                                                                                                                                                                                                                                                                                                                         NU
26° 21'30 "S




                                                                                                                                                                                                                                                                                                                              26° 21'30 "S
                                                                                                                                                                                                                                                                                                            ET




                                                                                                                                                                                                                                                                                                                          E
                                   T




                                                                   WO
                                UR




                                                                                                                                                                                                                                                                                                               WA
                                                                     OD
                                                                                                                                                                                                                                                              D




                                                                        H
                                                                                                                                                                                                                                                            OA
                              CO




                                                                                 AV




                                                                                                                                                                                                                                                                                                                 Y
                                                                                    EN
                        DEL
                                                                                                                                                                                                                                                          HR




                                                                                       WA
                           A




                                                                                         Y
                                                                                                                                                                                                                                                         IBA
                                                                                                                                                                                                                                                       RO
                                                                                                                                                                                                                                                     OO




               IL
                  LO
                                                                                                                                                                                                                                                   EC




                       UR
                          A
                                                                                                                                                                                                                                                     K




                              PL
                                                                                                                                                                                                                                                  LA




                                 A   CE
26° 21'40 "S




                                                                                                                                                                                                                                                                                                                              26° 21'40 "S
                       152 °59 '2 0"E                                    152 °59 '3 0"E                152 °59 '4 0"E                            152 °59 '5 0"E                   153 °0'0"E                             153 °0'10 "E             153 °0'20 "E             153 °0'30 "E              153 °0'40 "E




                                                                                                                                     Coastal Hazard Areas Map
                                                                                                                                        Erosion Prone Area
                                                                                                                               Requested By: [email protected]
                                                                                                                                            Date: 09 Nov 15 Time: 16.31.26
                                                                                                                                                                      Centred on Lot on Plan:
                                                                                                                                                                           47 RP136461                                                     Notes
                                                                                                                                                                                                                                           1. The areas shown on this map are indicative of the ex tent of
                                                                                                                                                                                                                                           erosion and permanent inundation defined by erosion prone area
                                                                                                                                                                                                                                           plans declared under the Coas tal Protec tion and Management Ac t
                                                                                                                                                                                                                                           1995. Only the declared erosion prone area plans should be used
                       Selected Land Parcel                                                                                                                                                                                                for development ass es sment. To determine the actual pos ition of
                                                                                                                                                                                                                                           the erosion prone area a regis tered surveyor or geotechnical
                                                                                                                                                                                                                                           consultant may be required if there is any doubt.

Indicative Erosion Prone Area                                                                                                                                                                                                              2. Erosion prone area plans for each loc al government area and a
(including projected climate change impact to 2100)                                                                                                                        LOC AL IT Y D IA GRA M
                                                                                                                                                                                                                                           comprehensive description of their determination are available from
                                                                                                                                                                                                                                           the Department of Environment and Heritage Protection webs ite at
                                                                                                                                                                                                                                           www.ehp.qld.gov.au
                        Erosion due to storm impact and long
                        term trends including sediment supply                                                                                                                                                                              Version 5 - J uly 2015
                        deficit and channel migration
                                                                                                                                                                                                                                           Disclaimer
                        Erosion from permanent tidal                                                                                                                                                                                       Whils t ev ery care is taken to ensure the acc urac y of this produc t,
                        inundation due to sea level rise                                                                                                                                                                                   the Department of Environment and Heritage Protection mak es
                                                                                                                                                                                                                                           no repres entations or warranties about its accuracy, reliability,
                                                                                                                                                                                                                                           completeness or suitability for any particular purpos e and dis claims
                        Coastal Management District                                                                                                                                                                                        all responsibility and all liability (including without limitation, liability




                                                                                                                                                                                  ¯
                                                                                                                                                                                                                                           in negligence) for all expenses , losses , damages (inc luding indirect
                                                                                                                                                                                                                                           or consequential damage) and costs whic h you may inc ur as a
                        Coastal Building Lines                                                                                                                                                                                             result of the produc t being inacc urate or incomplete in any way and
                                                                                                                                                                                                                                           for any reas on. This map is intended to be printed on an A4 page.



                                                                                                                                     0                            130      260          390              520                       650 m




                                                                                                                                 This product is projected into GDA 1994 MGA Zone 56
                                                                                                                                                                                                                                                                    © The State of Queensland, 2015

Page 113

                         152 °59 '2 0"E                                    152 °59 '3 0"E                152 °59 '4 0"E                            152 °59 '5 0"E                   153 °0'0"E                             153 °0'10 "E              153 °0'20 "E              153 °0'30 "E              153 °0'40 "E
  26° 20'30 "S




                                                                                                                                                                                                                                                                                                                                 26° 20'30 "S
                                                                                                                                                                                                         AM
                                                                                                                                                                                                                AR
                                                                                                                                                                                                                  O
                                                                                                                                                                                                                      O
                                                                                                                                                                                                                          PL
                                                                                                                                                                                                                            AC
                                                                                                                                                                                                                                 E
  26° 20'40 "S




                                                                                                                                                                                                                                                                                                                                 26° 20'40 "S
  26° 20'50 "S




                                                                                                                                                                                                                                                                                                                                 26° 20'50 "S
                                                                                                                                                                   NE
                                                                                                                                                              LA
                                                                                                                                                          R
                                                                  EX
                                                                     F                                                                                  TE
                                                                                                                                                   AS
                                                                                                                                               C
                                                                    O




                                                                                                                                           N
                                                                         RD




                                                                            CO                                                        LA
                                                                               U
                                                                                   RT
                                 OAD
  26° 21'0"S




                                                                                                                                                                                                                                                                                                                                 26° 21'0"S
                          GATE R
                    GREEN




                                                                                                            AD
                                                                       E
                                                                  DRI V




                                                                                                               E
                                                                                                               NSF
                                                                 GTON




                                                                                                                   IE LD COURT
                                                            EDIN




                                                                                                                                                                                                           NT
  26° 21'10 "S




                                                                                                                                                                                                                                                                                                                                 26° 21'10 "S
                                                                                                 RI VE




                                                                                                                                                                                                              E
                                                                                                                                                                                                          ES C
                                                                                          ON E D




                                                                                                                                                                                                        A CR
                                                                                           NST




                                                                                                                                                                                                           IM
                                                                                                                                                                                                      JIRR
                                                                                        VO
                                                                                        DE




                                                                                                                                                                                                                                                                                                                 E
                                                                                                                                                                                                                                                                                                              IV
                                                                                                                                                                                                                                                                                                                  D




                                                                                                                                                                                                                                                                                                          R
                                                                                                                                                                                                                                                                                                          D   E
                                                                                                                                                                                                                                                                                                       SI
                                   CR
  26° 21'20 "S




                                                                                                                                                                                                                                                                                                                                 26° 21'20 "S
                                                                                                                                                                                                                                                                                                    KE
                                      A   IG




                                                                                                                                                                                                                                                                                                  LA
                                            SL
                                                 EA
                                                      CO
                                                           UR
                                                              T                                                                                                                                                                                                                                       LAKEWA
                                                                                                                                                                                                                                                                                                            Y DRIVE




                                                                                                                                                                                                                                                                                                                      PIN
                 WO
                   OD




                                                                                                                                                                                                                                                                                                                          ES
                      H         AV
                                   EN




                                                                                                                                                                                                                                                                                                                             A
                                                                                                                                                                                                                                                                                                         SU
                                      WA




                                                                                                                                                                                                                                                                                                                          VE
                                        Y




                                                                                                                                                                                                                                                                                                            NS




                                                                                                                                                                                                                                                                                                                            NU
  26° 21'30 "S




                                                                                                                                                                                                                                                                                                                                 26° 21'30 "S
                                                                                                                                                                                                                                                                                                               ET




                                                                                                                                                                                                                                                                                                                             E
                                     T




                                                                     WO
                                  UR




                                                                                                                                                                                                                                                                                                                  WA
                                                                       OD
                                                                                                                                                                                                                                                                 D




                                                                          H
                                                                                                                                                                                                                                                               OA
                                CO




                                                                                   AV




                                                                                                                                                                                                                                                                                                                    Y
                                                                                      EN
                          DEL
                                                                                                                                                                                                                                                             HR




                                                                                         WA
                             A




                                                                                           Y
                                                                                                                                                                                                                                                            IBA
                                                                                                                                                                                                                                                          RO
                                                                                                                                                                                                                                                        OO




                 IL
                    LO
                                                                                                                                                                                                                                                      EC




                         UR
                            A
                                                                                                                                                                                                                                                        K




                                PL
                                                                                                                                                                                                                                                     LA




                                   A   CE
  26° 21'40 "S




                                                                                                                                                                                                                                                                                                                                 26° 21'40 "S
                         152 °59 '2 0"E                                    152 °59 '3 0"E                152 °59 '4 0"E                            152 °59 '5 0"E                   153 °0'0"E                             153 °0'10 "E              153 °0'20 "E              153 °0'30 "E              153 °0'40 "E




                                                                                                                                      Coastal Hazard Areas Map
                                                                                                                                      Storm Tide Inundation Area
                                                                                                                                 Requested By: [email protected]
                                                                                                                                              Date: 09 Nov 15 Time: 16.31.31
                                                                                                                                                                        Centred on Lot on Plan:
                                                                                                                                                                             47 RP136461

                                                                                                                                                                                                                                             Notes
                                                                                                                                                                                                                                             1. A default s torm tide inundation lev el of 1.5 m HAT in South East
                                                                                                                                                                                                                                             Queensland regional planning area and 2 m HAT for the
                                                                                                                                                                                                                                             remainder of Q ueens land is us ed where projec ted s torm tide
                     Selected Land Parcel                                                                                                                                                                                                    inundation levels have not been determined locally.


Storm Tide Inundation Area *
                                                                                                                                                                                                                                             2. The high hazard area may c oincide with the area of permanent
                                                                                                                                                                                                                                             inundation - refer to the Eros ion Prone Area map.

                     High hazard (greater than 1.0m water depth)                                                                                                             LOC AL IT Y D IA GRA M
                                                                                                                                                                                                                                             3. The map s hould be us ed as a guide only. Field s urv eys are
                                                                                                                                                                                                                                             recommended to v erify feature boundaries.

                     Medium hazard (less than 1.0m water depth)                                                                                                                                                                              Version 4 - J uly 2015

                                                                                                                                                                                                                                             Disclaimer
                     Coastal Management District                                                                                                                                                                                             Whils t every c are is tak en to ensure the ac curac y of this product, the
                                                                                                                                                                                                                                             Department of Environment and Heritage Protec tion mak es no
                                                                                                                                                                                                                                             repres entations or warranties about its acc uracy, reliability,
                     Coastal hazard data not available in this area                                                                                                                                                                          completeness or suitability for any particular purpose and disc laims
                     Refer to note 1 to determine                                                                                                                                                                                            all responsibility and all liability (including without limitation, liability in




                                                                                                                                                                                    ¯
                                                                                                                                                                                                                                             negligence) for all expenses, loss es, damages (inc luding indirec t or
                     Coastal Building Lines                                                                                                                                                                                                  consequential damage) and c osts which y ou may incur as a result of
                                                                                                                                                                                                                                             the product being inaccurate or inc omplete in any way and for any
                                                                                                                                                                                                                                             reason. This map is intended to be printed on an A4 page.


* Regional  default values for a 100yr ARI
  inundation level including 0.8m sea level                                                                                            0                            130      260          390              520                       650 m
  rise.

                                                                                                                                   This product is projected into GDA 1994 MGA Zone 56
                                                                                                                                                                                                                                                                       © The State of Queensland, 2015

Page 114

                                                  Lot on Plan Search


Reference Number:           3668
Lot:                        47
Plan:                       RP136461
LGA:                        Noosa Shire
Buffer Distance:            0 metres




There are no Aboriginal cultural heritage site points recorded in your specific search area.


There are no Aboriginal cultural heritage site polygons recorded in your specific search area.




Nov 10, 2015, 3:34 PM

Page 115

                                                  Lot on Plan Search


Cultural heritage party for the area is:
   QC Ref Number          QUD Ref Number               Party Name                          Contact Details
QC2013/003             QUD280/2013             Kabi Kabi First Nation        Queensland South Native Title Services
                                                                             Limited
                                                                             PO Box 10832, Adelaide Street
                                                                              Brisbane
                                                                              QLD 4000
                                                                              P (07) 3224 1200 | 1800 663 693
                                                                              F (07) 3229 9880
                                                                             E [email protected]


There is no cultural heritage body recorded in your specific search area.


There are no cultural heritage management plans recorded in your specific search area.


There are no Designated Landscape Areas (DLA) recorded in your specific search area.


There are no Registered Study Cultural Heritage Areas recorded in your specific search area.


Regional Coordinator:
        Name                    Position              Phone             Mobile                   Email
Andrew Rutch            Cultural Heritage        3247 6220        0459 840 294    [email protected]
                        Coordinator Southern
                        Region




Nov 10, 2015, 3:34 PM

Page 116

                                                  Lot on Plan Search



I refer to your application in which you requested advice on Aboriginal cultural heritage places recorded on the above
location.

The Cultural Heritage Database and Register search has been completed and I would like to advise that no Aboriginal
cultural heritage is currently recorded in your specific search area, from the data provided by you. However, it is
probable that the absence of recorded Aboriginal cultural heritage places reflects a lack of previous cultural heritage
surveys of the area. Therefore, our records are not likely to reflect a true picture of the Aboriginal cultural heritage
values of the area.

I note that, pursuant to the Cultural Heritage Duty of Care Guidelines, you have advised that the proposed activity is a
'Category 5 activity'. As such, I take this opportunity to remind you that in accordance with those Guidelines:-
   Where an activity is proposed under category 5 there is generally a high risk that it could harm
Aboriginal cultural heritage. In these circumstances, the activity should not proceed without cultural heritage
assessment.
   Where an activity is proposed under category 5, it is necessary to notify the Aboriginal Party and seek:
   (a) Advice as to whether the feature constitutes Aboriginal cultural heritage; and
   (b) If it does, agreement as to how best the activity may be managed to avoid or minimise harm to any Aboriginal
cultural heritage.

I remind you also that the extent to which the person has complied with Cultural Heritage Duty of Care Guidelines and
the extent to which the person consulted with Aboriginal parties about the carrying out of the activity, and the results
of the consultation are factors a court may consider when determining if a party has complied with the duty of care.

Please refer to our website www.datsip.qld.gov.au/people-communities/aboriginal-and-torres-strait-islander-cultural-
heritage for a copy of the gazetted Cultural Heritage duty of care guidelines, which set out reasonable and practical
measures for meeting the duty of care.

Should you have any further queries, please do not hesitate to contact the approval officer on (07) 3405 3050.

Kind regards




The Director
Cultural Heritage | Community Participation | Department of Aboriginal and Torres Strait Islander Partnerships




Nov 10, 2015, 3:34 PM

Page 117

EPBC Act Protected Matters Report
This report provides general guidance on matters of national environmental significance and other matters
protected by the EPBC Act in the area you have selected.

Information on the coverage of this report and qualifications on data supporting this report are contained in the
caveat at the end of the report.

Information is available about Environment Assessments and the EPBC Act including significance guidelines,
forms and application process details.


Report created: 09/11/15 17:46:13

    Summary
    Details
        Matters of NES
        Other Matters Protected by the EPBC Act
        Extra Information
    Caveat
    Acknowledgements




                                                                      This map may contain data which are
                                                                      ©Commonwealth of Australia
                                                                      (Geoscience Australia), ©PSMA 2010

                                                                      Coordinates
                                                                      Buffer: 1.0Km

Page 118

Summary
Matters of National Environmental Significance
This part of the report summarises the matters of national environmental significance that may occur in, or may
relate to, the area you nominated. Further information is available in the detail part of the report, which can be
accessed by scrolling or following the links below. If you are proposing to undertake an activity that may have a
significant impact on one or more matters of national environmental significance then you should consider the
Administrative Guidelines on Significance.


World Heritage Properties:                             None
National Heritage Places:                              None
Wetlands of International Importance:                  None
Great Barrier Reef Marine Park:                        None
Commonwealth Marine Area:                              None
Listed Threatened Ecological Communities:              1
Listed Threatened Species:                             28
Listed Migratory Species:                              13

Other Matters Protected by the EPBC Act

This part of the report summarises other matters protected under the Act that may relate to the area you nominated.
Approval may be required for a proposed activity that significantly affects the environment on Commonwealth land,
when the action is outside the Commonwealth land, or the environment anywhere when the action is taken on
Commonwealth land. Approval may also be required for the Commonwealth or Commonwealth agencies proposing to
take an action that is likely to have a significant impact on the environment anywhere.



The EPBC Act protects the environment on Commonwealth land, the environment from the actions taken on
Commonwealth land, and the environment from actions taken by Commonwealth agencies. As heritage values of a
place are part of the 'environment', these aspects of the EPBC Act protect the Commonwealth Heritage values of a
Commonwealth Heritage place. Information on the new heritage laws can be found at
http://www.environment.gov.au/heritage



A permit may be required for activities in or on a Commonwealth area that may affect a member of a listed threatened
species or ecological community, a member of a listed migratory species, whales and other cetaceans, or a member of
a listed marine species.



Commonwealth Land:                             None
Commonwealth Heritage Places:                  None
Listed Marine Species:                         18
Whales and Other Cetaceans:                    None
Critical Habitats:                             None
Commonwealth Reserves Terrestrial:             None
Commonwealth Reserves Marine:                  None

Extra Information
This part of the report provides information that may also be relevant to the area you have nominated.

State and Territory Reserves:                  None
Regional Forest Agreements:                    None
Invasive Species:                              33
Nationally Important Wetlands:                None
Key Ecological Features (Marine)              None

Page 119

Details
Matters of National Environmental Significance


Listed Threatened Ecological Communities                                          [ Resource Information ]
For threatened ecological communities where the distribution is well known, maps are derived from recovery
plans, State vegetation maps, remote sensing imagery and other sources. Where threatened ecological
community distributions are less well known, existing vegetation maps and point location data are used to
produce indicative distribution maps.
Name                                                   Status                    Type of Presence
Lowland Rainforest of Subtropical Australia            Critically Endangered     Community may occur
                                                                                 within area

Listed Threatened Species                                                         [ Resource Information ]
Name                                                   Status                    Type of Presence
Birds
Anthochaera phrygia
Regent Honeyeater [82338]                              Critically Endangered     Foraging, feeding or related
                                                                                 behaviour likely to occur
                                                                                 within area
Botaurus poiciloptilus
Australasian Bittern [1001]                            Endangered                Species or species habitat
                                                                                 known to occur within area

Erythrotriorchis radiatus
Red Goshawk [942]                                      Vulnerable                Species or species habitat
                                                                                 likely to occur within area

Lathamus discolor
Swift Parrot [744]                                     Endangered                Species or species habitat
                                                                                 may occur within area

Pachyptila turtur subantarctica
Fairy Prion (southern) [64445]                         Vulnerable                Species or species habitat
                                                                                 likely to occur within area

Rostratula australis
Australian Painted Snipe [77037]                       Endangered                Species or species habitat
                                                                                 likely to occur within area

Turnix melanogaster
Black-breasted Button-quail [923]                      Vulnerable                Species or species habitat
                                                                                 may occur within area

Frogs
Litoria olongburensis
Wallum Sedge Frog [1821]                               Vulnerable                Species or species habitat
                                                                                 may occur within area

Mixophyes iteratus
Giant Barred Frog, Southern Barred Frog [1944]         Endangered                Species or species habitat
                                                                                 may occur within area

Mammals
Chalinolobus dwyeri
Large-eared Pied Bat, Large Pied Bat [183]             Vulnerable                Species or species habitat
                                                                                 likely to occur within area

The text continues on page 120.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.