Original source · versioned page text
Town Planning Report and Appendices - Cooroibah
Attached to the e-mail Development Permit – 23 Jirrima Crescent, Cooroibah MCU16/0099.
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Specific Outcomes Probable Solutions Compliance
vegetation will also act as a
backdrop which will also
help integrate the slimline
monopole with the
surrounding landscape
when viewed from the east.
This is considered to be in
accordance with S7.1.
Noise and vibration
emissions associated with
the proposed facility will be
limited to the construction
phase. Noise generated
during the construction
phase will be of short
duration and will be in
accordance with the
standards outlined in the
Environmental Protection
Regulation 1998 and
Environmental Protection
(Noise) Policy 1997.
Construction works will only
occur between the hours of
7.00am and 6.00pm.
There will be some low level
noise from the ongoing
operation of air conditioning
equipment associated with
the outdoor cabinets, once
installed. Noise emanating
from the air conditioning
equipment is at a
comparable level to a
domestic air conditioning
installation, and will
generally accord with the
background noise levels
prescribed by Australian
Standard AS1055. The air
conditioning unit will be well
removed from surrounding
residential dwellings.
For these reasons, the
proposal is considered to
95
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.