Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Town Planning Report and Appendices - Cooroibah

Attached to the e-mail Development Permit – 23 Jirrima Crescent, Cooroibah MCU16/0099.

of 195

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Performance outcomes                      Acceptable outcomes                                              Response     Comment
                                                                                                                                  remove physical distance and travel time as a
                                                                                                                                  barrier to business.
                                                                                                                             •    Improvements to internet services may also be of
                                                                                                                                  benefit for local employees, by enabling
                                                                                                                                  telecommuting and home business. The
                                                                                                                                  telecommuting trend is heavily reliant on access to
                                                                                                                                  fast internet services, and is anticipated to
                                                                                                                                  continually increase in popularity.

                                                                                                                        The works have been proposed in order to provide safe
                                                                                                                        access to the compound area, and potential impact from the
                                                                                                                        culvert replacement on fish habitats have been properly
                                                                                                                        considered and appropriate mitigation measures will be
                                                                                                                        implemented.

                                          AO5.2 The following can be demonstrated:                                     The proposed works are located on a single, freehold lot,
                                          (1) tenure is held for the land directly abutting the                         owned by a private land owner.
                                              waterway where the works will be carried out and has                      Owner’s consent has been obtained from the land owner
                                              the applicant has full riparian access rights on both                     accordingly.
                                              sides of the barrier
                                          (2) tenure has been granted over the area of work, or
                                          (3) resource allocation or resource entitlement has been
                                              granted for the resource being developed.
                                          And
                                          AO5.3 Development is for public infrastructure.                              The proposed nbn™ facility will be owned by nbn Co; a
                                          Or                                                                            Government initiative.

                                          AO5.4 Development is for public infrastructure for which                     The proposed nbn™ facility is to be owned by nbn Co, for
                                          there is no alternative viable route that does not require                    which there is no alternative access route that does not
                                          waterway barrier works.                                                       require waterway barrier works.
                                          Or
                                          AO5.5 Development is for a legitimate public health or                       The proposed works are necessary to support the
                                          safety issue and the applicant is an entity or acting on                      construction of the nbn™.
                                          behalf of an entity.
PO6 Development minimises stream          AO6.1 Where multiple waterway barrier works are                  N/A          Multiple waterway barrier works are not proposed.
crossings.                                demonstrated to be essential, these are located a
                                          minimum of 100 metres apart (including existing
                                          structures).
PO7 Development avoids non-essential      AO7.1 The development does not involve the                       N/A          The development does not involve the channelisation of the

State development assessment provisions                                   Module 5 — Fisheries resources          5.2 Constructing or raising waterway barrier works in fish habitats state code
22 July 2016 V1.9                                                                                                                                                                  Page 4 of 24
Log in to download the original file

Town Planning Report and Appendices - Cooroibah.pdf · 14.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.