Performance outcomes Acceptable outcomes Response Comment
remove physical distance and travel time as a
barrier to business.
• Improvements to internet services may also be of
benefit for local employees, by enabling
telecommuting and home business. The
telecommuting trend is heavily reliant on access to
fast internet services, and is anticipated to
continually increase in popularity.
The works have been proposed in order to provide safe
access to the compound area, and potential impact from the
culvert replacement on fish habitats have been properly
considered and appropriate mitigation measures will be
implemented.
AO5.2 The following can be demonstrated: The proposed works are located on a single, freehold lot,
(1) tenure is held for the land directly abutting the owned by a private land owner.
waterway where the works will be carried out and has Owner’s consent has been obtained from the land owner
the applicant has full riparian access rights on both accordingly.
sides of the barrier
(2) tenure has been granted over the area of work, or
(3) resource allocation or resource entitlement has been
granted for the resource being developed.
And
AO5.3 Development is for public infrastructure. The proposed nbn™ facility will be owned by nbn Co; a
Or Government initiative.
AO5.4 Development is for public infrastructure for which The proposed nbn™ facility is to be owned by nbn Co, for
there is no alternative viable route that does not require which there is no alternative access route that does not
waterway barrier works. require waterway barrier works.
Or
AO5.5 Development is for a legitimate public health or The proposed works are necessary to support the
safety issue and the applicant is an entity or acting on construction of the nbn™.
behalf of an entity.
PO6 Development minimises stream AO6.1 Where multiple waterway barrier works are N/A Multiple waterway barrier works are not proposed.
crossings. demonstrated to be essential, these are located a
minimum of 100 metres apart (including existing
structures).
PO7 Development avoids non-essential AO7.1 The development does not involve the N/A The development does not involve the channelisation of the
State development assessment provisions Module 5 — Fisheries resources 5.2 Constructing or raising waterway barrier works in fish habitats state code
22 July 2016 V1.9 Page 4 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.