Performance outcomes Acceptable outcomes Response Comment
when fish are known to be undertaking upstream
spawning migrations, even on very small or zero flow
events or river rises. Waterway barrier works are
scheduled out of this period, or other provision for fish
movement is made (for example, the use of a partial
barrier, periodic barrier, stream diversion or fish way).
And
AO26.4 Where there are species at the site that require N/A Refer to Response AO26.1.
downstream movement during works, provisions are
made to allow those species to move downstream.
And
AO26.5 Water diversion around the site or through the N/A Refer to Response AO26.1.
barrier is implemented if the barrier is in position for more
than four weeks, and there is any flow in the system for
the purpose of ensuring that vegetation die-off,
decomposition and associated reduction in water quality
does not become an issue upstream of the barrier, in
areas where there is more than 30 per cent coverage of
terrestrial grasses within the ponded area.
And
AO26.6 Where there are aquatic macrophytes N/A Refer to Response AO26.1.
immediately downstream of the barrier and those
macrophytes would ordinarily be submerged or partially
submerged, water will need to be passed across the
barrier at all times to avoid their desiccation.
And
AO26.7 On removal of a temporary barrier, full movement N/A Refer to Response AO26.1.
for fish is reinstated.
And
AO26.8 On removal of a temporary barrier, the waterway N/A Refer to Response AO26.1.
bed and banks are returned to their original profile and
stability, so that long-term fish movement at the site is not
compromised.
PO27 Fish movement is required past AO27.1 Development provides for adequate fish N/A Refer to Response AO26.1.
temporary waterway barrier works where movement through the incorporation of a fish way or fish
the duration of the barrier is greater than ways for the works.
that allowed for under the code for self And
assessable development Temporary
waterway barrier works (WWBW02), AO27.2 The barrier: N/A Refer to Response AO26.1.
State development assessment provisions Module 5 — Fisheries resources 5.2 Constructing or raising waterway barrier works in fish habitats state code
22 July 2016 V1.9 Page 19 of 24
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.