Town Planning Report and Appendices - Cooroibah
Attached to the e-mail Development Permit – 23 Jirrima Crescent, Cooroibah MCU16/0099.
The original of this document is very large (14.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Specific Outcomes Probable Solutions Comments
vehicular access.
Flooding and drainage S8.1 For new buildings or Complies.
structures or additions of
O8 Buildings and other works more than 50m2 gross floor While the subject property
are designed and sited to— area to an existing building is identified as containing
or structure, floor levels for areas subject to flooding as
a) provide flood free access per the Planning Scheme
habitable rooms are—
to premises and flood free mapping, the proposed
habitable areas; a) for areas where minimum development is a small
floor levels are available— scale, non-habitable use
b) allow only minor, short
not less than the specified considered to be consistent
term and infrequent flooding
level; with the nature of the
of non-habitable areas;
identified hazard.
b) for areas where flood
c) ensure carparking areas
modelling is available—a The relatively small scale of
can be adequately drained;
minimum of 500mm above the development (120 m2
d) ensure drainage does not the modelled flood level; compound area) will not
adversely impact upon other and exacerbate flooding or
premises; and ponding on the site or on
c) for areas where flood nearby land. Furthermore,
e) ensure filling or excavation modelling is not available, a the proposal is for a non-
does not adversely impact minimum of 500mm above habitable use and will not
upon other premises by— the highest known flood increase the number of
level; people living or working on-
i. causing ponding on the site
site.
or nearby land; AND
Any excavated material will
ii. increasing flooding, which S8.2 Where Council
be distributed across the
adversely affects the safety infrastructure is available—
site in a location that will
or use of any land upstream
a) any drainage (from not worsen the flood hazard
and downstream; and
buildings and land) flows to on the site or surrounding
iii. adversely affecting the that infrastructure; and premises. The proposal will
flow of water in any overland not include car parking and
b) the infrastructure has the will only require
flow path.
capacity to accept any maintenance 3 to 4 times
additional loading. annually.
AND
S8.3 Car parking and
maneuvering areas are
constructed at a level that
permits the parking area to
drain from the site by
gravity means, without the
need for mechanical
83
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.