Specific Outcomes Probable Solutions Comments
Noosa Trail Network S13.1 No solution provided Not applicable.
O13 A comprehensive S14.1 Development includes The subject site is not
network of bridle trails and linkages to or between identified on the Noosa Trail
pedestrian and bicycle existing or future Network Map as being
linkages is established, components of the Noosa located adjacent or within
enhanced and protected Trail Network, as indicated proximity to a current or
incorporating road reserves, in Schedule 5 – Map 3; future identified trail
State forests, Council owned network.
land and private lands AND
consistent with the lifestyle
S14.2 Development does
and outdoor recreation needs
not have an adverse impact
of the Shire’s residents and
on the access functions of
visitors;
the Noosa Trail Network, as
AND indicated in Schedule 5 –
Map 3, including severing of
O14 Existing and future existing or future linkages;
pedestrian, bridle trail or or
bicycle linkages are retained
as part of a Shire wide trail S14.3 Alternative linkages
network. to those indicated in
Schedule 5 – Map 3 are
provided;
AND
S14.4 Linkages to the Noosa
Trails Network are designed
and constructed in
accordance with—
a) Australian Standard
2156.1 Walking Tracks Part
1: Classification and
Signage to a minimum of a
Class 4 Standard; and
b) Australian Standard
2156.2 Walking Tracks Part
2. Infrastructure Design
Pedestrian and bicycle S15.1 Pedestrian and bicycle Not applicable.
pathways pathways are provided and
retained where indicated in The subject site is not
O15 Safe and convenient the Priority Infrastructure located adjacent to an
pedestrian and bicycle Plan in Part 15; identified pedestrian and/or
pathways are provided and bike path under Schedule 5
retained between and around
89
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.