Attachments 1 & 2 to Item 6
Planning & Environment Committee Agenda
11 July 2017
ATTACHMENT 1
STORMWATER NETWORK FUTURE PROJECTS
FOR
LGIP - SCHEDULE OF WORKS (SOW)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of sections 2 to 10 (of 18)
Section 2
Introduction
Noosa Shire Council was reformed following the de-amalgamation of a number Queensland
local government areas in January 2014 with the immediate priority being to uptake the day
to day operational requirements by a local government.
At the current time, the future network stormwater master planning has not commenced,
however, in order to enable the updating of the current PIP to a LGIP within the timeframe
required, the:
• existing stormwater network items have been reviewed to align with Statutory
Guideline 03/04 Appendix B – Indicative trunk and non-trunk infrastructure;
• based on stormwater service catchments limited to the Priority Infrastructure Area
(PIA) relating to urban development;
• future trunk stormwater projects;
o to rectify current staff known deficiencies of a priority nature and contained in
Council’s 5 year Capital Works Program to 2021; and
o proposals under currently available Stormwater/Flood management and/or
mitigation plans or reports.
The following tables provide details of the future projects proposed for the LGIP in
accordance with the above criteria. This is an interim measure until further amendments can
be made and incorporated in a subsequent LGIP to be prepared for the new Planning
Scheme that reflects Council’s further network planning.
For projects that have an associated renewal component, this will be highlighted and
accounted for in the Schedule of Works (SOW) excel model.
Section 3
1. Stormwater Future Projects
Project Proposed Base Cost
Location Description Project Description Planning Basis Cost Basis
ID Timing Estimate
Flood mitigation works to ensure that the Contract value $2.5m
SW01 Pomona , Rifle Street Pomona Rifle Street Flood Mitigation trunk drainage system has capacity 2016 $2,500,000 Project Brief Att 5 &
undertake flash flooding events. Attachment 8
Master drainage upgrade for Hilton Terrace.
These works will complement the upgrade of
Hilton Terrace Master Drainage the Hilton Terrace and Ernest Street Cost Estimate - projex north
SW02 Tewantin, Hilton Terrace 2016-2021 $435,000
Upgrade intersection and also provide increased report Att 2e
capacity for the stormwater trunk
infrastructure.
Noosa Cooroy Road (opposite Cooroy Noosa Road upgrade and drainage
Cost estimates attached for
SW03 Tewantin, Cooroy Noosa Road Tewantin Golf Course) Upgrade of improvements. 2016 $200,000
culverts Att 2d.
Culverts and auxiliary drainage Capital Works Program CP0000031
Daintree Estate Flood Mitigation to ensure
Tewantin, Daintree Estate – Golf Golf Course Drive, Daintree Estate - Project Brief Attachment 6 Att
SW04 properties are above the 1:100 flood limit for 2016 $1,250,000
Course Drive Upgrade of Stormwater Infrastructure 7 and Att 9.
the entire estate.
Noosa Heads - Pinaroo Park,
Pinnaroo Park Bushland Management Plan Refer to Cost assumptions
Reconstruction of Stormwater outlet
SW05 Noosa Heads, Pinaroo Park, has identified the need for the stormwater 2021 -2026 $1,200,000 document on future projects
including GPT / Bio retention Basin
system to be upgraded Att 1.
and Dispersion Bund Upgrades
Noosa Heads, Cooyar Street Cooyar Street (East of Noosa Springs Refer to Cost assumptions
Priority 3 of the Girraween Management Plan
SW06 Street (East of Noosa Springs Drive) Bio retention Basin / Infiltration 2021 -2026 $400,000 document on future projects
Actions.
Drive) Basin & Dispersion Bund Att 1.
Cooyar Street (Opposite Wyandra) Refer to Cost assumptions
Noosa Heads, Cooyar Street Priority 6 of the Girraween Management Plan
SW07 Upgrade existing Bio retention 2021 -2026 $400,000 document on future projects
(Opposite Wyandra) Actions.
System and Gross Pollutant Trap Att 1.
Noosa Heads, Cooyar Street Cooyar Street (Elanora Terrace to Refer to Cost assumptions
Priority 4 of the Girraween Management Plan
SW08 (Elanora Terrace to Safari Safari Street) Bio rentention Basin / 2021 -2026 $600,000 document on future projects
Actions.
Street) Infiltration Basin & Dispersion Bund Att 1.
Girraween Court - Construction of Priority 7 of the Girraween Management Plan Refer to Cost assumptions
Sunshine Beach, Girraween Actions. document on future projects
SW09 Gross Pollutant Trap and Bio filtration 2021 -2026 $400,000
Court Att 1.
System
Ben Lexcen Dr / Sunshine Beach
Refer to Cost assumptions
Sunrise Beach, Ben Lexcen State High School – Bio retention Priority 2 of the Girraween Management Plan
SW10 2021 -2026 $800,000 document on future projects
Drive and Grasstree Court Basin / Infiltration Basin & Dispersion Actions.
Att 1.
Bund
Dame Patti Drive Stormwater outlet Refer to Cost assumptions
Sunrise Beach, Dame Patti Priority 5 of the Girraween Management
SW11 Upgrade / Gross Pollutant Trap and 2021 -2026 $300,000 document on future projects
Drive. Plan Actions.
Bio retention system Att 1.
Total = $8,485,000
Section 4
List of Attachments:
1. Cost Estimates – General Assumptions
2. Capital Works Program extracts:
a. Grant Street GPT Tender report
b. Quote for GPT
c. Bicentennial Dr Issue for Construction
d. COOROY NOOSA ROAD ROAD SAFETY IMPROVEMENTS - STAGE 5 Estimate.
e. Hilton Tce Drainage
3. Girraween Stormwater Management Plan
4. Pinnaroo Park Bushland Management Plan
5. Pomona Rifle St Flood Mitigation Project Plan
6. Tewantin Daintree Estate Flood Mitigation Plan Council report
7. Daintree Estate Flood Mitigation_Request for Quote
8. Pomona Rifle St - Capitalisation Worksheet
9. Tewantin - Daintree Estate flood mitigation Stage 1 construction
Section 5
ATTACHMENT 2
Gympie Regional
Council Area
Kin Kin
Boreen
Point
Cooran
Pomona
Sunshine Coast
Regional Council
Area
Peregian
Great
Great
Great
Noosa Plan
Sandy
Sandy
Sandy
PFTI Stormwater Key Map
Region
Region
Region
Region
Region
StreamsRivers
Area
Area
Area Covered
Area
Area
Area Covered
Covered
Covered
Covered
by
by
Noosa
the
by the
Noosa
Noosa
the
Noosa Plan
Noosa
Noosa Plan
Plan
Plan
Plan
Plan
PIA Boundaries (Catchments)
Sunshine
Sunshine
Sunshine 0 2 4 Noosa Shire Boundaries
Coast
Coast
Coast
Coast
Coast
Coast Kilometres
Scale 1cm : 1.3km
Waterbodies
South
South
South
The map is a reproduction from Council’s Locality Boundaries
East
East
East GIS, with a scale of accuracy of 1:25 000.
Brisbane
Brisbane
Brisbane
Brisbane
Brisbane
Brisbane Data on which it is based was gathered
at mostly finer scales. Precise boundaries
Queensland
Queensland may need to be defined by site survey.
Queensland Council Copyright Reserved.
Workspace Location: StrategyMap.wor
Section 6
Kin Kin Village Inset Boreen Point Village Inset
VERA
NC E
RD
T RD
WOONGA URUNGA
LAKE FLA
R ST PAR
RAINFOREST CT
AY
NW
TOOLAR
A ST
TO
D AV
ER
OV
MA
IN
ORCHAR
VISTA ST
CREEK
ST URANG
RD AN ST
ST
ER LAGUNA
LM ST
T
PA
NS
TEWAH
A
RD
WM
BO
RD
KIN KIN
E
AD
N
LA
POMONA
P
ES
Inset Map Scale is 1cm : 200m
0 250 500
metres
SISTE
DR PA
GES RD
R TREE
ROAD
N KIN
CREEK
IE KI
GYMP
RD
Kin Kin
Village Inset
LAKE FLAT
RD
DAR
RAB
THA
N KIN RD
COO
Boreen Point
Village Inset
KI
POMONA
R
D
O
ZZ
BA
IS
U
RD
LO
BA
RA
THA
O
CO
DR
BAZZO
LOUIS
LOUIS BA
ZZ
O
DR
0 2 4
Kilometres
NON DRIVE
O DR Main Map Scale is 1cm : 800m
LOUIS BAZZ
1 Boreen Point, Kin Kin & Cootharaba
2 Cooroibah
3 Cooroy & Lake Macdonald
Boreen Point, Kin Kin & Cootharaba Existing Trunk Infrastructure
4 Eastern Beaches
5 Mary River Catchment
6 Noosa Heads
PFTI Stormwater Locality Existing Piped Infrastructure (Diameter in mm)
7 Noosa North Shore
8 Noosaville
9 Tewantin & Doonan Map 1 Boundaries
Railway Line
1,350 and greater
925 to 1,349
1 Property 650 to 924
Noosa Shire 450 to 649
Boundaries
7 Major Water Boundary
Bodies Existing Gross Pollutant Trap
2 PIA Boundaries Stormwater wetlands, bio-basins,
5 Inset
Catchments sediment basins, swales and buffers
9 6
3 8 This map, is a reproduction from Council’s
GIS, has a scale of accuracy of 1:25 000, al-
though data on which it is based was gathered
Future Trunk Infrastructure
at mostly finer scales. Precise boundaries
4 may need to be defined by site survey. Stormwater Improvement
Council Copyright Reserved.
Projects
Workspace Location: (N:\07 Planning\Projects_Done_by_Ali_for_LUD\StormWater\WOR)
Section 7
U
D
LO
AR
R AB
DR
B AZ Z O
LOUIS
DRIVE
MCKINNON
Cooroibah
Village Inset
LAK
EC
OO
RO
IBA
HR
D
N DR
INNO
M CK
MC
KIN
NO
Cooroibah Village Inset
NDR
DAL ST
MO ORIN
LAKE COO
ROIBAH RD
DR
LD
ST
NA
BUTLER
AV
O
LAKEWAY H
DR IT
CD
I FF
GR
MO
RN
ES
IN
PL
PIN
G
SU
AN
GL
D
ES
AR
NS
AD
OR
OS
AV
ET
E
NO
Y
OY
W
DR
OR
Y
D
CO
Main Map Scale is 1cm : 400m
HR
BECKMA
A
ST
OIB
Y
LE
R
OR
Inset Scale 1cm : 150m AN
SD
ST
CO
8a
NS RD
0 1 2
EW
KE
0 250 500
LA
DR
AN
metres
ST
Kilometres
1 Boreen Point, Kin Kin & Cootharaba
2 Cooroibah Cooroibah Existing Trunk Infrastructure
3 Cooroy & Lake Macdonald
4 Eastern Beaches
5 Mary River Catchment
PFTI Stormwater
Locality Existing Piped Infrastructure (Diameter in mm)
6 Noosa Heads
7 Noosa North Shore
8 Noosaville
Map 2 Boundaries 1,350 to and greater
9 Tewantin & Doonan
Property Railway Line 925 to 1,349
1 Noosa Shire 650 to 924
Boundaries 450 to 649
Major Water Boundary
7
Bodies Point
2 PIA Boundaries
Inset Stormwater wetlands, bio-basins,
5 Catchments sediment basins, swales and buffers
9 6
3 8 This map, is a reproduction from Council’s
GIS, has a scale of accuracy of 1:25 000, al-
though data on which it is based was gathered
Future Trunk Infrastructure
at mostly finer scales. Precise boundaries
4 may need to be defined by site survey. Stormwater Improvement
Council Copyright Reserved.
Projects
Workspace Location: (N:\07 Planning\Projects_Done_by_Ali_for_LUD\StormWater\WOR)
Section 8
LOUIS BAZ
Cooroy ZO
DR
ELM ST
Town
LAM
ROSE
GU
Inset
ONTS
M RD
RD
DR
LD
NA
CDO
MA
KE
LA
Inset Scale 1cm : 250 m
ELM
DRIVE
ST
PONDEROSA DR
0 0.5 1
O DR
MCKINNON
LOUIS BAZZ RD
NS
SO
AR
Kilometres
CT
PE
EE
WILG
ELM ST
SA DR
PONDERO
DR
ALD
SW
IFT
ON
DR
MA CD
ST
LA
RS RD
KAURI
LAKE
TREE
CARPENTE
MA
SA RD
PEAR
RA
ROY NOO
ST
RA
COO
J ARRAH
AGATE ST OL
IVINE
ST
ST
E ST MC
VIN PA
U LS
SAPPHIRE ST OLI RD RD
TIN
AN
R RD W
RIVE TE
MARY
PEARL ST
GA
ST
ST
RN
E
PIN
A
E
MIV
T ST
DIAMOND ST
BR
EMERALD
UC
GARNET ST
ST
E
KAURI ST
MIVA ST
HW
OPAL ST
Y
GARNET
ST
MYAL
RUBY ST
OAK ST
ST
L ST
WATTLE
ST
TOPAZ ST
YU
MAPL E
RO
KAURI ST
CE
DA
R
ST
BR
UC
EH
L FO
CRYSTAL
ST
RE
ST
W
LE
Y
P
MA
ST
TULIP ST
MYALL ST
Y CT
DR
OV
RR RD
MOUNTAIN
ER
LORIKEET CU
LA COOROY
LA
ND
ER
AV
BR
RD
UC
BAGNALLS
E
DR
HW
Y
N
INNO
MC K
RO
BER
TS
DR
MYA
RO
LA
LL
AD
CIA
ST
A
111
AC
EK RD
CRE
OY BELLI
COOR
RD
NAND
ROYA
FERRELLS
RD
DR
LD
NA
DO
AC
EM
D
AR
OS
K
Y NO
LA
O RO
CO
B RU
CE
Cooroy
HW
Town
Y
Inset
RD
SA
OO
SU
BLACK YN
NR
MOUN RO
TA OO
ISE
IN RD C
BR
K RD UC
EE E
HW
I CR
L Y
EL
YB
RO
D CO
O
KR
Main Map Scale 1cm : 500 m
0 1 2
Kilometres
1 Boreen Point, Kin Kin & Cootharaba
2 Cooroibah
3 Cooroy & Lake Macdonald
Cooroy & Lake Macdonald Existing Trunk Infrastructure
4 Eastern Beaches
5 Mary River Catchment
6 Noosa Heads PFTI Stormwater Locality Existing Piped Infrastructure (Diameter in mm)
7 Noosa North Shore 1,350 and greater
Boundaries
8 Noosaville
9 Tewantin & Doonan Map 3 Property Railway Line 925 to 1,349
650 to 924
1 Noosa Shire
Boundaries 450 to 649
Major Water Boundary
7
Bodies Existing Gross Pollutant Trap
2 PIA Boundaries Stormwater wetlands, bio-basins,
5 Inset
Catchments sediment basins, swales and buffers
9 6
This map, is a reproduction from Council’s
3 8 GIS, has a scale of accuracy of 1:25 000, al- Future Trunk Infrastructure
though data on which it is based was gathered
at mostly finer scales. Precise boundaries
4 may need to be defined by site survey. Stormwater Improvement
Council Copyright Reserved.
Projects
Workspace Location: (N:\07 Planning\Projects_Done_by_Ali_for_LUD\StormWater\WOR)
Section 9
RA
IN
BO
W
CR
DR
BA
Eastern Beaches North
BA
EY
Y
W
VIE
KE
W
LA
RD
0 250 500
SEAFARER
CT
metres
D DR
WOO
IFT
DR
AN
TIPO
DRI
D ES
FT
WO
CL
OD
DR
VIEW LAND
TH
DR
E
Castaways
QU
AR
TE
R
DECK
Beach
Y DR
MCANALL
ST
EUGARIE
Sunshine
DR
Beach
E ST
TER
SE ST
CR
SEA VIEW
E
AV
CR
W
ENTE RPRI
AM
PARKEDGE
BE
RD
WY
MAH
ON
A RS
MO
LOW
ER
R
LD
SOLW AY
TE
DR
PIC AN
N IA
DAVID
R
TEN
NE
TRO
WA
B
EN
VE CR
ULA
B IC
RAY ST ES T
BEL
DR
ST
EN DR
ST
M OR
IS
RR
E TE
FE
BEN LEXC
BR
YA
ST
R
DE
R
N ST
YE
ESPLANA
DW
ST
DU
R
PE
KE
DEP
ST
ST
N
SO
EL
GU
A
FER
ND
PA
A
ST
C IF
IC
AV
ST
KE
W
DU
EY
HE
BA
AT
CRANK ST
HL
ST
AN
D DR
ED
W
AR
DS
ST
PA
RK
CR
HE
N DR
AT
HL
AND
BEN LEXCE
DR
DA
RES
VID
O LU
LO
RO
TE
SS
W WY
WY
CR
ST
LOW
DA VID
SO
Sunrise
UT
HE
RN
MARINER
CR
OS
Beach
TINGIRA
S
PA
S
R
PL
CR
VENTURA
DAME PATT
I DR
ST
NE
WFI
EL
D
ST
DAVID LOW WY
DR
HAWTHORN
ST
NY
ORCA DES
GA
HO
MA
RS
RS
GROVE
RED
WOOD LARK
NETH ERBY
WO
OD
COMET DR
Marcus
CORSAIR CR
AV
VIC TOR
Beach
TW ILIG
Y
Y CRE
WW
WOLLO
HT ST
LO
S
VID
ORIENT DR
MIA WA
LESLIE DR
DA
DAYSPRING
Y
ST
ORIENT
RA
DR
IN
BO
W
IA DR
IS CR
CR
LLITR
TRISTAN
CA
SEAFARER
CT
ON DR
PERSIMM
D DR
WOO
IFT
DR
LORIL
AN
RD
TIPO
ET ST
N
DR
DO
DES
IF TW
REN
CL
LO
CLA
OOD
W
RY
DR
ST
PO
SP
Eastern
DA
OO
RG
Y
NB
WA
US
Section 10
ILL
LOW
PA
ST
R
Beaches
DAVID
Sunshine Maroochy
W
IN
R
North
D
Beach Shire
Inset POD ARGU
S PAR
PARA
KE ET
CR
AVOCET PAR
ESP
PEREGIAN
E DR
Sunrise
NN
RY-A
Beach
MA
CU
RR
AW
O NG
CR
W
OO
DL
AN
Eastern
D
DR
OSPREY
Beaches Castaways AV
Peregian
South Beach CORMORANT
CR
Beach
DR
Inset
E
NN
-A
PELICA
RY
K IN GFISHER DR
MA
N ST
WOODLAND DR
Marcus
Beach GREBE
ST
LOW WAY
ST
PLOVER
DAVID
PIPE
R
ST
ST
TER ST
JACANA
SHEARWA
Peregian LORIKEE
Beach
T DR
WY
AV
LOW
ORIOLE
DAVID
DR
LORIKEET
ORIOLE
AV
Eastern Beaches South
DRET
0 0.5 1
LORIKE
Kilometres
1 Boreen Point, Kin Kin & Cootharaba
2 Cooroibah
3 Cooroy & Lake Macdonald
Eastern Beaches Existing Trunk Infrastructure
4 Eastern Beaches
5 Mary River Catchment
6 Noosa Heads PFTI Stormwater Locality Existing Piped Infrastructure (Diameter in mm)
7 Noosa North Shore
Boundaries 1,350 and greater
8 Noosaville
9 Tewantin & Doonan Map 4 Property Railway Line 925 to 1,349
1 Noosa Shire 650 to 924
Boundaries 450 to 649
Major Water Boundary
7
Bodies Point
2 PIA Boundaries
Catchments Inset Stormwater wetlands, bio-basins,
5 sediment basins, swales and buffers
9 6
3 8 This map, is a reproduction from Council’s
GIS, has a scale of accuracy of 1:25 000, al- Future Trunk Infrastructure
though data on which it is based was gathered
at mostly finer scales. Precise boundaries
4 may need to be defined by site survey. Stormwater Improvement
Council Copyright Reserved.
Projects
Workspace Location: (N:\07 Planning\Projects_Done_by_Ali_for_LUD\StormWater\WOR)
The text continues on section 11.