 1. Stormwater Future Projects
Project                                                                                                                                   Proposed     Base Cost
          Location Description               Project Description                         Planning Basis                                                             Cost Basis
  ID                                                                                                                                      Timing       Estimate
                                                                                         Flood mitigation works to ensure that the                                  Contract value $2.5m
SW01      Pomona , Rifle Street              Pomona Rifle Street Flood Mitigation        trunk drainage system has capacity                 2016       $2,500,000   Project Brief Att 5 &
                                                                                         undertake flash flooding events.                                           Attachment 8
                                                                                         Master drainage upgrade for Hilton Terrace.
                                                                                         These works will complement the upgrade of
                                             Hilton Terrace Master Drainage              the Hilton Terrace and Ernest Street                                       Cost Estimate - projex north
SW02      Tewantin, Hilton Terrace                                                                                                        2016-2021     $435,000
                                             Upgrade                                     intersection and also provide increased                                    report Att 2e
                                                                                         capacity for the stormwater trunk
                                                                                         infrastructure.
                                             Noosa Cooroy Road (opposite                 Cooroy Noosa Road upgrade and drainage
                                                                                                                                                                    Cost estimates attached for
SW03      Tewantin, Cooroy Noosa Road        Tewantin Golf Course) Upgrade of            improvements.                                      2016        $200,000
                                                                                                                                                                    culverts Att 2d.
                                             Culverts and auxiliary drainage             Capital Works Program CP0000031
                                                                                         Daintree Estate Flood Mitigation to ensure
          Tewantin, Daintree Estate – Golf   Golf Course Drive, Daintree Estate -                                                                                   Project Brief Attachment 6 Att
SW04                                                                                     properties are above the 1:100 flood limit for     2016       $1,250,000
          Course Drive                       Upgrade of Stormwater Infrastructure                                                                                   7 and Att 9.
                                                                                         the entire estate.
                                             Noosa Heads - Pinaroo Park,
                                                                                         Pinnaroo Park Bushland Management Plan                                     Refer to Cost assumptions
                                             Reconstruction of Stormwater outlet
SW05      Noosa Heads, Pinaroo Park,                                                     has identified the need for the stormwater       2021 -2026   $1,200,000   document on future projects
                                             including GPT / Bio retention Basin
                                                                                         system to be upgraded                                                      Att 1.
                                             and Dispersion Bund Upgrades
          Noosa Heads, Cooyar Street         Cooyar Street (East of Noosa Springs                                                                                   Refer to Cost assumptions
                                                                                         Priority 3 of the Girraween Management Plan
SW06      Street (East of Noosa Springs      Drive) Bio retention Basin / Infiltration                                                    2021 -2026    $400,000    document on future projects
                                                                                         Actions.
          Drive)                             Basin & Dispersion Bund                                                                                                Att 1.
                                             Cooyar Street (Opposite Wyandra)                                                                                       Refer to Cost assumptions
          Noosa Heads, Cooyar Street                                                     Priority 6 of the Girraween Management Plan
SW07                                         Upgrade existing Bio retention                                                               2021 -2026    $400,000    document on future projects
          (Opposite Wyandra)                                                             Actions.
                                             System and Gross Pollutant Trap                                                                                        Att 1.
          Noosa Heads, Cooyar Street         Cooyar Street (Elanora Terrace to                                                                                      Refer to Cost assumptions
                                                                                         Priority 4 of the Girraween Management Plan
SW08      (Elanora Terrace to Safari         Safari Street) Bio rentention Basin /                                                        2021 -2026    $600,000    document on future projects
                                                                                         Actions.
          Street)                            Infiltration Basin & Dispersion Bund                                                                                   Att 1.
                                             Girraween Court - Construction of           Priority 7 of the Girraween Management Plan                                Refer to Cost assumptions
          Sunshine Beach, Girraween                                                      Actions.                                                                   document on future projects
SW09                                         Gross Pollutant Trap and Bio filtration                                                      2021 -2026    $400,000
          Court                                                                                                                                                     Att 1.
                                             System
                                             Ben Lexcen Dr / Sunshine Beach
                                                                                                                                                                    Refer to Cost assumptions
          Sunrise Beach, Ben Lexcen          State High School – Bio retention           Priority 2 of the Girraween Management Plan
SW10                                                                                                                                      2021 -2026    $800,000    document on future projects
          Drive and Grasstree Court          Basin / Infiltration Basin & Dispersion     Actions.
                                                                                                                                                                    Att 1.
                                             Bund
                                             Dame Patti Drive Stormwater outlet                                                                                     Refer to Cost assumptions
          Sunrise Beach, Dame Patti                                                      Priority 5 of the Girraween Management
SW11                                         Upgrade / Gross Pollutant Trap and                                                           2021 -2026    $300,000    document on future projects
          Drive.                                                                         Plan Actions.
                                             Bio retention system                                                                                                   Att 1.
                                                                                                                                           Total =     $8,485,000
Log in to download the original file

2017-07-11 P&E Agenda - Attachments 1 & 2 to Item 6 - Stormwater Network Future Projects & Maps(PDF, 19MB).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.