Council archive · source document
07/1017 - Op Works - landscaping, Acess &/or Carparking [As Published] · 142007.1017
tormwater Drain.
33.
34.
35.
All stormwater drainage shall be collected on site and discharged so there is no net increase in
stormwater runoff from the site. Stormwater drainage permitted to drain from the site shail be
discharged to Council's existing drainage structures in Douglas Lane. Plans of the drainage design shail
be prepared by a Registered Professional Civil Engineer and submitted to Council prior to obtaining a
Development Permit for Operational Works.
The maximum discharge of stormwater drainage allowabie to Council's kerb & channel street drainage
system at any one iocation is 25 litres/second.
* see note below
Roof runoff from any new dwelling shal! be directed to a rainwater storage system or tank (minimum
storage 3000 litres per dwelling/unit} that is installed to ensure water from the tank can be used for
external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up
swimming pools, outdoor cleaning, etc} and for use in flushing of toilets internal to the dwelling/unit.
All rainwater tanks are to be designed and installed in accordance with the Queensland Development
Code {QDC), Part 25 - Rainwater Tanks, and shall be part of the plumbing application in conjunction
with the building approval. The focation and capacity of the tanks shail be clearly shown on the plans
submitted for Building Works approval and any overflow shall be directed to the stormwater drainage
system.
* see note below
To ensure that polluted rur-off does not enter Council’s stormwater drainage system, stormwater run-
off from the carparking areas and the driveways shail have the first flush {the first 12 mm of rainfall or
hose-down] collected in a grease/oil arrestor provided on site prior to being permitted to discharge into
Council's drainage system.
All other clean stormwater, such as roof water, can be collected on site and discharged through a
single underground drain line directly into the existing drainage system, bypassing the grease/oil
arrestor.
To this end, a detailed maintenance plan shal! be prepared for the proposed grease/oil arrestors, which
shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational
Works,
The approved maintenance plan shail be incorporated in the Community Management Scheme for the
development and a copy of this shall be provided for Council's records prior to commencement of the
approved Use. A Development Permit for Building Works shall pot be granted until a Development
Permit for Operational Works has been issued in regard to the drainage scheme
*33/ 34/35;
Acknowledge these conditions & confirmation in the Hydraulic Documentation will reflect
the following, maximum discharge to kerb at any one point will be directed to storage
system with a minimum capacity of 3000L per dwelling. Refer to Operational Works
documentation for location. It is confirmed that this rainwater storage will be used for
watering gardens/irrigation, ornamental ponds, water features, topping up of pools and
for the fiushing of toilets throughout the dwellings. The overflow will discharge separately
to Council kerb and Channel Street drainage system. The Hydraulic Engineering design will
show the run off from the car parking and driveway wili be collected in a grease / oi!
arrestor provided in the basement prior to being permitted to discharge into the Council
drainage system. This system and ali associated stormwater drainage systems shall be by
means of a gravity system. We advise that baiconies will drain to the edge and over,
however the roof terraces of level 3 to unit 1 and 2, and the main Douglas Street side living
baiconies of level 2 to unit 1 and 2 will be collected through floor wastes and directed to
the iniet side of the previously described basement grease / oil arrestor. A detailed
Maintenance program shall be prepared as part of the application for obtaining
Developments Permit for Operational Works. Accordingly this approved Maintenance Plan
shall be attached and incorporated in the Community Management ? and made
available to Council for record prior to commitment of the approved use. .
architecture « interiors « sustainablebuildingdesign » planningdevelopmentstrategies
willfranklindesign « 5 1marystreetnoosavilleqid4s66 « p.o.box 1354noosaheadsqid4567
telo754743237 * fax0754741020 ° [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1017 - Op Works - landscaping, Acess &/or Carparking [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.