07/1017 - Op Works - landscaping, Acess &/or Carparking [As Published] · 142007.1017
36.
All site stormwater drainage shall be by means of a gravity system.
Acknowledgement to this condition is made.
Sewer Mains
37. The site shall be connected to Council's existing sewerage reticulation systems and be constructed in
accordance with Council's standards and requirements at no cost to Council.
Acknowledgement to this condition is made. No further comment is required at this stage.
Town Water Supply
38. The site shall be connected to Council's existing town water supply and be constructed in accordance
39.
40.
41.
@ =.
42.
43.
with Council's standards and requirements at no cost to Council.
Acknowledgement to this condition is made. No further comment is required at this stage.
Each individual water connection to the water reticulation system shall extend to the property
boundary and be metered. All fees for the supply of water meters shail be paid to the Council.
Acknowledgement to this condition is made. No further comment is required at this stage.
For Multiple Uses (inchuding Building Format Plans, Group Title Plans, etc) the development shail either
be served by:
a single Body Corporate water meter to measure the combined/shared Body Corporate
and individual Use flows {including fire hose reels, but excluding fire hydrants and fire
sprinkler systems}, or
multiple water meters to separately measure Body Corporate (if any) and individual Use
flows (including fire hose reels, but excluding fire hydrants and fire sprinkler systerns).
Advice will be sought from the owners. The Hydraulic Engineer documentation shall
reflect the desired intent.
All water meters must be located outside the property boundary and in an easily assessable location to
facilitate unhindered reading by Council and/or Council’s contracted water meter readers, and not
behind fences or locked gates. !n this regard approval of the water meter configuration and location
must be obtained from Council's Water & Sewerage Capital Works Manager prior to lodgement and
approval of hydraulic drawings.
Advise will be sort from the owners. The Hydraulic Engineer documentation shall refiect
the desired intent. The location of water meters will clearly be located on all relevant
documentation.
rks
Earthworks and construction works carried out on site shall not affect the structural integrity of any of
the existing fences or structures or fands that border the development site. Fences that are affected
shail be replaced prior to the Building Certifier issuing the Certificate of Classification. In this regard any
fences to be replaced shall be clearly shown on the plans submitted for Operational Works approval.
- To finish - maybe relevant to new drawing.
The use of vibrating installation techniques for sheet piling and any other vibration causing construction
techniques for excavating, earthnoving, demolition or compaction, including vibrating rollers, is not
permitted.
See note from Consultants meeting.
architecture ¢ interiors * sustainablebutidingdesign « planningdevelopmentstrategies
willfranklindesign ° 5 imarystreetnoosavilileqid4566 « p.o.box1354noosaheadsqid4s67
telo754743237 * fax0754741020 * [email protected]
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1017 - Op Works - landscaping, Acess &/or Carparking [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.