Skip to the record
Beware of cheap imitations.

Council archive · source document

07/1017 - Op Works - landscaping, Acess &/or Carparking [As Published] · 142007.1017

of 39

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

DRAWING SIZE — Al

AND BURIED 300 INTO

900(#) GEO-FABRIC SILT
FENCE, FIXED TO SPIKES —-———— :
STABLE GROUND.

 

1200(L} 50 Sq. HDWD
SPIKES, 1800 ctrs DRIVE
600 INTO GROUND

 

SILT RENTENTION FENCE DETAIL GARAGE

“ge

 

 

 

a

wo

wo a wo — a w =

2 8 B | = Ss a 3 8 3

SLT_RETENTION lor] rs ial wo ~~ m ~ rm ww
a

THE CONTRACTOR IS TO INSTALL APPROVED SILT RETENTION = 2 = Y ° rm etd rm =
FENCES PRIOR 70 COMMENCING ANY EARTHWORKS. THE a 8B 8 B 2 2 ° E
FENCE IS 10 BE CONSTRUCTED ALONG THE LOWEST Ss S a 2 2 2 S =
’ 3

<

BOUNDARY AND RETURNED UP SIDE BOUNDARIES TO ENSURE
FULL STORMWATER ENTRAPMENT. SURFACE RUNOFF FROM

On D

   

 

    

AND SHALL NOT ENTER NIEGHBOURING ALLOTMENTS THROUGH
THE USE OF SURFACE BUNDING OR SCOUR PROTECTED
DRAINS. THE FENCE MUST REMAIN IN PLACE UNTIL SUCH
TIME THAT FINISHED LANDSCAPING AND DRAINAGE MEASURES
ARE INSTALLED

 

 

| RP BOUNDARY
Kerb Line Nominal

FFL 33.585 RI 33.000
3.

 

 

 

PROVIDE ALLOWANCE FOR REBUILDING EXISTING
BOUNDARY TIMBER PALING FENCE AND SCAVATER Fane Ng OOTAIL
REINSTATEMENT OF ADJACENT GARDENS/GRASSED .
AREAS. SEEK ADJACENT PROPERTY BODY
CORPORATE APPROVAL PRIOR TO WORKS.

boundary line 32.187m

 

wv _—-

 

 
 
 
 
 
      
 
   

  

 

 
 

eo . So v7
SLT — ~ : oe

   
 

  

 

 

 

 

 

 

 

 

douglas street

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

 

 

 

 

 

 

   
 

   

\ | ' =
ri & ‘ \ ° '
\ .. PROPOSED FOOL Sone? |e | \ ae 1
14 ‘ ) = » ° 1
, \ = 1 ~ 1
e| SB < 2 | \
5! \ *O \ I \ }
wo
Ry . | \ ‘ EXISTING DRIVEWAY TO
®) \ y a a fe BE REMOVED.
s | REFER TO HYDRAULICS CONSULTANTS \ \ h_ } casing ivy tove revert _
® a, ( DOCUMENTATION FOR SITE DRAINAGE \ UMS
Cc 3 5 DETAILS \ ’ 2 \ |
8 + | ” \ \ — = | 1
OD Block retaining wall & 3 \ 20-40mm AGGREGATE
— | LS | HARD STAND OVERLAY
| ‘ a ( 5 FOR DELIVERY'S DURING
W l S \ AS CONSTRUCTION.
; 1 i ' f = ——
oO | UI ) SS \
lg 5 cs |
_ _ _ Driveway 2 2 \ |
oe orn & “% 7 Rr 7 Fe - le e h—-—4
a 5 / !
\ 6 ‘sy ' | I
» \ - g aa | #
3° Block retaining wall = S of \ | _ New Driveway ne f . ~
t \
O | \ a DRIVEWAY CROSS OVER DETAILS
| 1 3 ' TO BE IN ACCORDANCE WITH
{ NOOSA SHIRE COUNCIL'S STD
l _ ' DRAWINGS 9005 & 9019.
z eI 3 2 |
° EXISTING POOL £ || ‘g s Ss |
a \ & 2 E= — 3 =| e ; ! NEW KERB & CHANNELING TO BE
-— i f = 3 x! iN | 9 ' REINSTATED TO NOOSA SHIRE COUNCIL
— B a 2 , & | ' STANDARDS.
EXISTING STORM ; > ; |
WATER INLET. = 3
’ S$ { | ny
3 \ | gh !
1 i | }
J I
se t RS / \ i
Bs a PT’ ° ‘ast
boundary line 32.187m Z ‘ K Pe ‘s } LEGEND
PROVIDE ALLOWANCE FOR REBUILDING EXISTING 7 \i g- ~~ INDICATES EXISTING SURFACE
SPRAYED RC FACING TO BOUNDARY TIMBER PALING FENCE AND ¥ 180 CONTOUR AND LEVEL TO AHD.
BUILDER TO MAINTAIN STABILITY EXCAVATED FACE 10 DETAIL. REINSTATEMENT OF ADJACENT GARDENS/GRASSED ! “7 -
AREAS, SEEK ADJACENT PROPERTY BODY SILT
OF AL, MEGHBOURNS STRUCTURES, CORPORATE APPROVAL PRIOR TD WORKS. =--S—~ SILT RETENTION FENCE TO DETAIL
CONCRET TRCN IO cats ae 2.60 INDICATES PROPOSED FINISHED SPOT
BATTERS TO PROTECT AGAINST SCOUR, SURFACE LEVELS TO AHO.
REFER DETAIL, <
+ EXISTING SURFACE SPOT LEVELS.
SITE PLAN — OPERAT! KS ra, INDICATES DIRECTION OF FALL
Scale 1: 100 TO FINISHED SPOON DRAINS.
EXISTING STRUCTURE /DWELLING
INCLUDING NEIGHBOURING
ALLOTMENTS
THE BUILDER /CONTRACTOR
SHALL CONFIRM ALL
RELEVANT LEVELS PRIOR TO
COMMENCING WORKS.
2
= 2 SLB2 Mesh
58 1000 middle SPRAYED 25MPa

     
 

| Tis Footie witHouT
PIERS |S FOUNDED
ABOVE CRITICAL DEPTH

LINE AND IS UNSTABLE.

THIS FOOTING IS FOUNDED
BELOW CRITICAL DEPTH
LINE AND 'S STABLE.

—~ EXCAVATION OR OTHER

PIERS OR UNDERPINNING FOUNDED
TRENCH.

BELOW THE CRITICAL DEPTH LINE
WOULD BE NEEDED TO SUPPORT
ANY FOOTING THAT IS FOUNDED

ABOVE THE CRITICAL DEPTH LINE.

NOTE:
CRITICAL DEPTH LINE DIAGRAM © THis DETAIL ALSO APPLIES TO EXISTING FOUNDATIONS

ON NEIGHBOURING PROPERTIES. SHEET PILING MUST
BE INSTALLED WHERE EXISTING FOOTINGS WILL BE
FOUNDED ABOVE ANY EXCAVATION CRITICAL DEPTH
UNE

|
|
LINE OF PROPOSED
|
|

1 CONCRETE FACING
SL72 MESH MIDDLE

    
 

SATURATE GROUND ADJACENT
EXCAVATION FOR A MINIMUM OF
24 HOURS PRIOR TO WORKS

RECEIVEn

   

 

Sow cut ond Compected COMMENCING. 1
breckout BARRIER, SEMI-MOUNTABLE, MOUNTABLE sond bed ™ 1 JUN 2007
back of kerb KERB & CHANNEL OR INVERT CROSSING. HOOSA SHIRE jw
bey ln
FRONT Counteg’ A!
TYPICAL SECTION ~ SPRAYED CONCRETE FACED EMBANKMENT
(Scale 1:20)

 

   

GENERAL:

1. Do not scole from this drawing.

2. All dimensions in mitimetres

3, Setting out dimensions ore to be obtained from the orchitectural
drawings.

4, Any discrepancies between these drawing and the orchitectural drowings
are to be referred to the engineer immediately.

5. The builder is responsible for locoling all existing services within and
adjacent the allotment and shall ensure that all new sorks ore in
accordance with the attached critical depth line diagram.

FOOTPATHS AND DRIVEWAYS:

1. Existing footpaths to be saw cut prior to removal

2. Crossings are not designed for commercial vehicles

4. Concrete driveway to be 125mm thk. excluding any finished treatments,
¢g. stamping

4. Concrete surface tolerance +5.0mm over 3.0m

5. Concrete N24 in accordance with AS 1379 and AS 3600

6. Reinforcement fabric to AS 1304, pieced central slab depth.

7. Expansion joints to be 10mm wide wet tooled with every 2nd mesh wire
cut olong joint.

8. One access point permitted for each allotment,

9. For curved driveways, maximum grades apply to inside edge of curve

10, Ait services to be located and protected as required prior to work
commencing

FLUNG NOTES:

~The site is to be scroped clear of all organic moterial and debris.

— The subgrade is ta be proot rolled with a wbrating steel drum roller to
achieve a minimum relative field density of 95% The compection is to be
sufficient to achieve a biow count of 7 blows per 300mm with on approved
Perth Sand Penetrometer for o depth of 1.Gm below excovoted level. Copies
of compaction test results shail be presented to SCG Consulting Engineers
for approval.

— Upon the written approval of the subgrade preperations by SCG Consulting
Engineers

the dlotmeni is to be filled to the specified levets,

— The fill materiol clean granular materia! (i.e. sand to a clayey sand in
accordance with ASt726} be free of any organk: materiol and have o clay
content of less thon 12% (Plasticity Index fess than 25% Linear shrinkage of
15%), The proposed material is to be inspected by SCG Consulting Engineers
prior to its removol to ensure its compatability,

— The fit is to be ploced and compacted in accordance with AS3798-1996
to a level sufficient to achieve a Level 1 certification with o minimum
relative field density of 95% Copies of compaction test results shall be
presented to SCG Consulting Engineers for approval

— Filing and compacting adjacent exisiting structures is to be in strict
accordance with the ossocioted details ond specifcations.

— Areos where existing structures or trees ore removed shall be backfiled
with the opproved fil material compacted in accordance with AS2B70~1996
to achieve o minimum relative field density of 95%

— Any foose or soft moterial uncovered in the site preparation shall be
removed and replaced with the approved fill materiof compacted in
occordance with AS2870-1996 to achieve a minimum relative field density
of 95%

— Site drainage ond silt protection meosures must be istalled prior to
construction commencing.
PAVEMENT NOTES:
1. Prior to plocement of pavement materiol the subgrade is to be stripped
to level. Any organic matter or debris is 1o be removed and reploced with
approved compacted moteria. The subgrode shall be proof rolled to o
minimum of 98% dry density as determined by compoction testing in
accordance with AS1289
2. Pavement materials shal! comply with the folowing main roods
department specification WRS11.05:

- Base course 10 consist of aggregate type 2.3, Grading B or C
3. Pavement material shall be extended o minimum of 150mm beyond the
edge of drive and shall be a minimum of 100mm thick U.N.O.
4. Base ond sub~base courses are to be compocted in loyers not
exceeding 150mm in thickness to achieve 95% dry density or greater with
one test per 200mm thickness of each layer.
5. AN compaction testing results to be presented to the engineer for
approval prior to proceeding to the next stage of construction.

DO NOT SCALE FROM THIS DRAWING

Tha design ond associated detoils coniained on this and associnied drowings ore
copyright ond ore not to be used or reproduced without the written permission of
‘SCG Consulting Engineers.

 

 

 

 

 

 

 

 

 

 

 

     
 

  

DEBUILO TiA

Gag CONSULTING ENGINEERS
structural - civil - geotechnical

ABN 40 098 481 899

18 DUKE STREET SUNSHINE BEACH QLD.4567

   
    
   
 
  

OPERATIONAL WORKS PLAN

 
 

Project
18 Douglas Street
SUNSHINE BEACH QLD 4567

Dawe. 17108-OW ia

   

 
 

Used in these records

About this file

File size
5.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_1017 - Op Works - landscaping, Acess &_or Carparking [As Published].pdf · 5.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.