Decision Notice - Change to an Existing Approval - 010.2003.00221135.002 [As Published] · 132003.221135.2
2003/221135
24. The carparking area shall be designed to comply with the provisions of AS 2890.1-1993 for
user class 3 with a minimum head clearance (headroom) at any point of 2.2m.
25. A minimum of 4 covered carpark spaces shall be provided on site.
Vegetation Protection
26. Any internal pavements within the drip zone of any of the existing trees or proposed trees on
site shall be designed as a pervious pavement and constructed so as not to damage the tree
or their root system in anyway whatsoever. In this regard, plans shall be submitted to the
Council for approval that clearly show the type and extent of the pervious pavement prior to
obtaining a Development Permit for Operational Works.
Roadworks Contributions
27. A roadworks contribution of $1,024 towards the Coastal Major Road Network shall be paid to
the Council prior to obtaining a Development Permit for Operational Works. This amount will
be subject to variations in the Price Index, All Groups Brisbane from December 2003 until the
date of payment.
Frontage Works
28. Footpath improvements such as topsoiling, grassing, and tree planting to the frontage shall be
in accordance with Planning Scheme Policy PSP1 Landscaping Guidelines. Grass shall be
couch, free of weeds.
29. A new 1.2 metre wide concrete path shall be constructed along the Elanda Street frontage of
the site in accordance with Council’s design standards and to an alignment that protects any
significant vegetation or any underground services.
The path shall be designed and constructed to ensure pedestrian safety using non-slip
materials and to produce an evenly graded surface finish.
30. All redundant vehicular crossings to the site shall be removed and replaced by kerb & channel,
footpath paving and landscaping such as trees and grasses in accordance with Council’s
Standard specifications prior to commencement of the use permitted by this permit.
Pathway Contributions
31. A pathway contribution of $238 towards external major pathways, in accordance with Planning
Scheme Policy PSP41 Coastal Major Pathway Contributions, shall be paid to the Council prior
to obtaining a Development Permit for Operational Works. This amount will be subject to
variations in the Price Index, All Groups Brisbane from December 2003 until the date of
payment.
Stormwater Drainage
32. As a minimum, there shall be no net increase in stormwater runoff from the site for storm
events up to and including a 100 year Average Recurrence Interval (ARI). All other
stormwater collected on site shall be discharge to Council’s street drainage system in Elanda
Street, although on site retention and reuse of this water would be preferable.
The maximum discharge of stormwater drainage allowable to Council’s street drainage system
at any one location is 25 litres/second. Plans of the drainage design shall be prepared by a
Registered Professional Civil Engineer and submitted to Council prior to obtaining a
Development Permit for Operational Works.
33. To ensure that polluted run-off does not enter Council’s stormwater drainage system,
stormwater run-off from the carparking areas and the driveways shall have the first flush (the
first 12 mm of rainfall or hose-down) collected in a grease/oil arrestor provided on site prior to
being permitted to discharge into Council’s drainage system.
Page 4 of 11
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2003.00221135.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 69 KB (small file)
- File type
No other editions are linked here.