                                                                                      2003/221135


      To this end, a detailed maintenance plan shall be prepared for the proposed grease/oil
      arrestors, which shall be submitted to the Council for approval prior to obtaining a
      Development Permit for Operational Works.

      All other clean stormwater, such as roof water, can bypass the grease/oil arrestor.

      A Development Permit for Building Works shall not be granted until a Development Permit for
      Operational Works has been issued in regard to the drainage scheme.
34.   All site stormwater drainage shall be by means of a gravity system.
Sewer Mains
35.   The site shall be connected to Council’s existing sewerage reticulation systems and be
      constructed in accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
36.   The site shall be connected to Council’s existing town water supply and be constructed in
      accordance with Council’s standards and requirements at no cost to Council.
37.   Each water connection to the water reticulation system shall extend to the property boundary
      and be metered. Where multiple units are served by a single service, multiple water meters to
      each individual unit shall be installed. All fees for the supply of water meters shall be paid to
      the Council.
Headworks
38.   Contributions shall be paid to Council in accordance with Planning Scheme Policies PSP28
      and PSP30 on Water Supply Headworks Contributions and Sewerage Headworks
      Contributions respectively and at the rates applicable at the time of payment. An estimate
      only of the contribution rates as of December 2003 under the current policies is as follows:
      Water Supply        $ 4,109
      Sewerage            $ 2,806
      TOTAL               $ 6,915

      All headworks contributions must be paid prior to the issue of a Development Permit for
      Operational Works.

      Alternatively a trading bank guarantee shall be submitted to Council plus 20%. Should the
      headworks contributions not be paid at the due time, Council shall call upon the trading bank
      guarantee in full.

      In the event that the Development Permit for Material Change of Use of Premises lapses or is
      cancelled, the contribution or trading bank guarantee will be returned.
Earthworks
39.   Any filling works required on site shall be carried out in accordance with Section 3.8 of
      Council’s Engineering Design Standards Manual and so as not to cause the ponding of water
      on any adjoining lands or the blockage of, or interference with, any natural watercourses.
40.   Any earthworks carried out on site shall not affect the structural integrity of any of the existing
      fences that border the development site unless it is intended to replace such fences. In this
      regard any fences to be replaced shall be clearly shown on the plans submitted for
      Operational Works approval.




                                                                                      Page 5 of 11

Used in these records

About this file

File size
69 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Change to an Existing Approval - 010.2003.00221135.002 [As Published].pdf · 69 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.