Council archive · source document
Proposal Plans_Minor Change_Stage 1 & 2 · 51901.3614.03
Plans and drawings: the text below has words only, no drawings.
Very large file (18.6 MB): may take a few minutes to open.
Original PDF page 24, section 1. The text section number identifies this passage in the reader.
REV DESCRIPTION DRN DATE
A MCU DA Issue MS 25.02.20
B MCU DA Issue MS 02.03.20
Archclad Cliptray 48 mm aluminium standing seam C MCU DA Issue MS 06.03.20
roofing, with concealed fixing clip (CBR), fixed to Proprietary-type waterprooof membrane New raised tiled surface on New 200 x 50 powdercoated aluminium New 200 x 50 powdercoated aluminium D Client Revisions MS 14.04.20
New frameless glass balustrade with
'Multiboard eXbound 15 mm', over non-combustible tanking system to raking stair roof slab. 'VersiPave®' pedestals or other awning portal frame, columns and beams awning frame with 25 x 50 powdercoated E MCU DA MS 05.08.20
powdercoated aluminium channels
vapour permeable sarking. Roof structure as per Completely seal joint between existing proprietary type adjustable paver to future detail, with select powdercoated 'timber-look' aluminium battens under Information Response
top and bottom, fixed to edge of
structural engineer's details. Installed in accordance stair roof slab and new blockwork walls supports. FFL of Building B to 'timber-look' 50 x 25 and 50 x 38 and select 16mm glass roof sheeting
profiled roof slab / new roof structure F GIA Issue MS 07.04.21
with manufacturer's specifications and details at with proprietary-type tanking system match FFL of Building A aluminium battens @ varying spaces over over to future details
equal centres over existing mass roof structure. G GIA Variations MS 24.06.21
H GIA Variations MS 11.08.21
I Minor Change Revision MS 21.09.21
J Minor Change - Stage 1 & 2 Works MS 10.12.21
Fall
5°
Fall
5°
Valley gutter Valley gutter
Roof 8 CBR
New 1200mm New 1200mm CBR Roof 8 New 1200mm
Fall
Fall
AFFL masonry AFFL masonry AFFL masonry
block party wall. TILE SETOUT TILE SETOUT block party wall. TILE SETOUT TILE SETOUT TILE SETOUT TILE SETOUT block party wall. TILE SETOUT
POINT - U408 POINT - U409 POINT - U410 POINT - U411 POINT - U412 POINT - U413 POINT - U414
BAL-R2 BAL-R2 N-RWO BAL-R2 BAL-R2 BAL-R2 BAL-R2 BAL-R2 N-RWO
N-RWO N-RWO N-RWO
Delete original glass TOW RL15.040 TOW RL15.040 TOW RL15.040
balustrade
U408 Terrace U409 Terrace U410 Terrace TOW RL15.840
1200mm high party wall.
TOW RL15.840 Line of
CFV TOW RL15.840
drainage
U411 Terrace U412 Terrace channel under U413 Terrace U414 Terrace
MV shown dotted
MV
(new tiled finish) (new tiled finish) (new tiled finish) (new tiled finish)
Generally throughout:
GPO (under)SK
DGPO (over)
- New render and paint finish to all external walls
MV MV - New anodised aluminium (25µm coating)
N-RWO N-RWO sliding doors to terraces / balconies
VP (new tiled finish) - New anodised aluminium (25µm coating) windows
(new tiled finish) (new tiled finish) VP Instant. HWS in
waterproof cabinet
over tiled plinth
Bar fridge in joinery unit Bar fridge in joinery unit - New frameless glass balustrade with
Bar fridge in joinery unit
Bar fridge in joinery unit Bar fridge in joinery unit
HW
SM
anodised aluminium (25µm coating) uprights
S
TL-08 TL-08 TL-08 St TL-08 TL-08 TL-08 TL-08
air - New tiles to walkways, terraces and balconies
SK
SK
TL-10 SK
SK
Aluminium-framed SK
G
SK
G
PO O
New bar and
PO O
DG
DG
seat to shower, with r)
(u ove
(u ove
P
nd
ve
P
n d r)
nd
(o er) shelving joinery unit
(u ove
er )
200 x 50 powdercoated
er )
(
)
select tiled finish to
(
er
)
) d
)
PO (un
(
Linen er
G PO
r
to future details
(o er)
r
nd r) DG PO
aluminium portal frame, columns
HW
DG
d
future details
HW
(u ove
r)
PO
PO (un
Chute
ve
TL-10 PO
( G
S
Instant. HWS in
DG PO
S
and beams to shower area, with Vent G PO
TL-10
G
TL-10 waterproof cabinet DG TL-10 TL-10 TL-10 TL-10
over tiled plinth selected powdercoated laser cut Pergola (approx.)
feature screen to top and short Pergola (approx.)
VP
Pergola (approx.) Joint line in Joint line in Pergola (approx.) Joint line in Joint line in Pergola (approx.)
St
St
St
sides to future details TL-10 VP 'VersiPave® 'VersiPave® VP 'VersiPave® 'VersiPave®
air
Fa
Pergola (approx.)
air
air
' tiling layout ' tiling layout ' tiling layout ' tiling layout
ll
Fa
Joint line in
ll
'VersiPave®
TL-11 TL-10 TL-10
' tiling layout
Fall
Shower Gate Gate Gate Gate Gate
Pergola (approx.) Pergola (approx.)
Shower Shower TL-11 TL-11 Shower TL-11 Shower TL-11 Shower
Joint line in Joint line in Joint line in Gate
'VersiPave® 'VersiPave® 'VersiPave® FHR
' tiling layout ' tiling layout ' tiling layout Joint line in
'VersiPave® New powdercoated aluminium
' tiling layout TILE SETOUT - gate and side screen to Walkway
Gate Gate BUILDING B recessed roof terrace entry
Gate
Shower BAL-R1 BAL-R1 BAL-R1 BAL-R1 Suite 2,
RHS
TL-11
RHS RHS Cnr Gard
EX-COL EX-COL EX-COL EX-COL EX-COL EX-COL BAL-R1 EX-COL EX-COL EX-COL EX-COL
Intumescent paint to Existing infill to be
Alexand
FL
all new Lift Roof RHS Joint line in PO Box
LEVEL 4 / ROOF TERRACE
removed. Provide new
columns to achieve concrete infill slab to match 'VersiPave®
FRL 90/-/-. existing and make good all ' tiling layout P 07 54
Scale 1:50
surfaces prior to installation
of new screed, tiles, etc. admin@
200 x 50 powdercoated aluminium portal New raised tiled surface on Archclad Cliptray 48 mm aluminium 200 x 50 powdercoated aluminium frame
200 x 50 powdercoated aluminium New frameless glass balustrade with
frame to future detail, supported by RHS 'VersiPave®' pedestals or other standing seam roofing, with concealed cantilevered off existing profiled roof slab and
portal frame to shower area, supported anodised aluminium channels top New bar and shelving
columns with select powdercoated proprietary type adjustable paver Existing services stack fixing clip (CBR), fixed to 'Multiboard supported by RHS stub columns off existing part
by RHS columns with selected laser cut and bottom, fixed to edge of profiled joinery unit to future detail
'timber-look' aluminium battens over and supports. FFL of Building A to eXbound 15 mm', over non- walls. Provide 50 x 20 battens to underside of SUNCOAST RESORT BUSINESS CENTRE
feature screen to top and short sides roof slab / new roof structure
50 x 50 SHS capping to top of frame match FFL of Building B combustible vapour permeable sarking. frame, select polycarbonate roof sheeting over SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Qld 4572
PO BOX 6232 MAROOCHYDORE BC Qld 4558
PH : 07 5443 5028 FAX:07 5479 2380
ABN 23 123 917 724
EMAIL: [email protected]
project
PROPOSED ALTERATIONS &
ADDITIONS TO EXISTING
RESORT BUILDING
for
NETANYA RESORT
at
75 HASTINGS STREET
NOOSA HEADS
drawing
DETAILED AREA - ROOF
TERRACE / FEATURE AWNING
AS SHOWN
date 10/12/2021 drawn JP scale @A1
drawing no. 19021 SD60.06 revision J
Copyright of this document remains the exclusive
N
property of SPROUT ARCHITECTS PTY LTD
ABN 23 123 917 724.
Contractors are to verify all dimensions and levels on
site prior to commencing. Report all discrepancies to
the Architect. Use figured dimensions in preference
0 5 10 to scaled.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Proposal Plans_Minor Change_Stage 1 & 2.pdfRelated documentApplication case desk ↗
Proposal Plans_Minor Change_Stage 1 & 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 18.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.