Council archive · source document
Proposal Plans_Minor Change_Stage 1 & 2 · 51901.3614.03
Plans and drawings: the text below has words only, no drawings.
Very large file (18.6 MB): may take a few minutes to open.
Original PDF page 25, section 1. The text section number identifies this passage in the reader.
(new tiled finish) (new tiled finish) VP Instant. HWS in
waterproof cabinet REV DESCRIPTION DRN DATE
over tiled plinth
Bar fridge in joinery unit Bar fridge in joinery unit Bar fridge in joinery unit
Bar fridge in joinery unit Bar fridge in joinery unit
HW
SM
S
TL-08 TL-08 TL-08 TL-08 TL-08 TL-08 TL-08 TL-08 A MCU DA Issue MS 25.02.20
St
air
B MCU DA Issue MS 02.03.20
SK
C MCU DA Issue MS 06.03.20
TL-10 SK
SK
Aluminium-framed SK
SK
G
New bar and D Client Revisions MS 14.04.20
PO O
DG
seat to shower, with r)
(u ove
ve
P
n d r)
nd
(o er) shelving joinery unit E MCU DA MS 05.08.20
(u ove
200 x 50 powdercoated
er )
)
select tiled finish to
(
er
) d
)
O
(
Linen er P (un
G PO
to future details Information Response
(o er)
r
nd r) DG PO
aluminium portal frame, columns
DG
d
future details
HW
(u ove
r)
PO
PO (un
Chute
ve
TL-10 PO
( G
Instant. HWS in
DG PO
S
and beams to shower area, with Vent G PO
TL-10 F GIA Issue MS 07.04.21
G
TL-10 waterproof cabinet DG TL-10 TL-10 TL-10 TL-10
selected powdercoated laser cut TL-10
over tiled plinth Pergola (approx.) G GIA Variations MS 24.06.21
feature screen to top and short Pergola (approx.)
VP
Pergola (approx.) Joint line in Joint line in Pergola (approx.) Joint line in Joint line in Pergola (approx.)
H GIA Variations MS 11.08.21
St
St
sides to future details TL-10 VP 'VersiPave® 'VersiPave® VP 'VersiPave® 'VersiPave®
air
VP
Fa
Pergola (approx.)
air
' tiling layout ' tiling layout ' tiling layout ' tiling layout I Minor Change Revision MS 21.09.21
ll
J Minor Change - Stage 1 & 2 Works MS 10.12.21
Fa
Joint line in
ll
'VersiPave®
TL-11 TL-10 TL-10
' tiling layout
Fall
Shower Gate Gate Gate Gate Gate
Pergola (approx.) Pergola (approx.)
Shower Shower TL-11 TL-11 Shower TL-11 Shower TL-11 Shower TL-11
Joint line in Joint line in Gate Shower
'VersiPave® 'VersiPave® FHR
' tiling layout ' tiling layout Joint line in
'VersiPave® New powdercoated aluminium
' tiling layout TILE SETOUT - gate and side screen to Walkway
Gate BUILDING B recessed roof terrace entry
Gate
Shower BAL-R1 BAL-R1 BAL-R1 BAL-R1
RHS
RHS RHS TL-11
EX-COL EX-COL EX-COL EX-COL EX-COL EX-COL BAL-R1 EX-COL EX-COL EX-COL EX-COL BAL-R1
umescent paint to Existing infill to be
new Lift Roof RHS FL
removed. Provide new For setout of all Joint line in
olumns to achieve concrete infill slab to match blockwork walls, 'VersiPave®
FRL 90/-/-. existing and make good all refer to CD40.00 ' tiling layout New powdercoated New powdercoated
New Roof
BAL-R1
BAL-R1
BAL-R1
surfaces prior to installation
BAL-R1
aluminium 'Heka' sun aluminium 'Heka' sun
FL
3°
of new screed, tiles, etc. hoods over windows / hoods over windows /
SETOUT POINT New downpipe from roof N-RWO
(connect to
Void doors to units below Void doors to units below Void
gutter over to connect to EX-DP below) CBR
TILE SETOUT - existing outlet
FL
BUILDING A Fascia gutter Fascia gutter
TL-08 TL-08
BAL-R1 TL-08 DP Box gutter DP
N-RWO
Reduce hob under
CBR
(EH) to allow for approx. Reduce hob under
Existing flush tiled finish CBR CBR approx. (EH) to allow for
New Roof
TI FL FL
New Roof
Lift Core 01 New frameless glass balustrade Slab edge and
TI
FL
approx. FL FL flush tiled finish
3°
TL-08
3°
with anodised aluminium hob as per struct. Roof 14 Slab edge and Roof 15
uprights and handrail, fixed to eng's. details Roof 13
hob as per struct.
new new hob over existing roof
slab to future details RHS
16
RHS
eng's. details
RHS 16 RHS DP Generally throughout:
BAL-R1 FL FL
15 BAL-R1 15
Fascia gutter
- New render and paint finish to all external walls
N-COL N-COL
Screen
Select 'James Hardie Stria' 14
SC-08
Line of 14 - New anodised aluminium (25µm coating)
wall cladding over subframe
Screen
13 laundry
SC-14
3
to existing lift core wall. Provide 50 - 75 mm
wall under Provide 50 - 75 mm 3 13 sliding doors to terraces / balconies
BAL-ST1
BAL-ST1
12 contrasting nosing contrasting nosing
Paint finish as scheduled 4 4 12
- New anodised aluminium (25µm coating) windows
11 BAL-ST1 strip to all stair treads Lift 02 strip to all stair treads
5 11
BAL-ST1
5 - New frameless glass balustrade with
approx.
as per AS1428.1 Extension as per AS1428.1
Remove existing lift; new 10 6 6 10
machine-operated lift to
9
anodised aluminium (25µm coating) uprights
extend to roof terrace, lift 7 Reinforced concrete stair Reinforced concrete stair 7 9
up
N-COL treads and landings as per treads and landings as per - New tiles to walkways, terraces and balconies
shaft walls to be retained 8 FL up
structural engineer's details structural engineer's details 8 N-COL
TL-07 New stair extension and New stair extension and TL-07
Circumference
Fire Stair 01 landing to have tiled finish landing to have tiled finish Fire Stair 02 to match existing
Extension TL-07, inc. treads and risers, TL-07, inc. treads and risers,
to NCC requirements in order to NCC requirements in order
Extension landings below
R 1505 R 1500
approx. to achieve R11 slip rating to achieve R11 slip rating
RHS
RHS
RHS approx. RHS
New roof structure over fire Parapet wall to roof, New roof structure over fire
stair extension. Provide Remove existing lift; new
WT5 to match levels stair extension. Provide Screen
Screen N-DP roof cover for full extent of 'Hebel' wall Tier 1 type lift to extend N-DP
below. Provide parapet roof cover for full extent of SC-13
SC-09 stair and bridge link extension to roof terrace. Lift shaft
capping and apron stair and bridge link
Intumescent paint to all new walls to be retained
Circumference to match flashing as required Intumescent paint to all
Stair RHS columns to
existing landings below new Stair RHS columns to
achieve FRL 90/-/-.
achieve FRL 90/-/-.
LEVEL 4 / ROOF TERRACE
Scale 1:50
Suite 2,
Cnr Gard
Alexand
PO Box
P 07 54
admin@
200 x 50 powdercoated aluminium portal
New roof structure over lift New roof structure over lift New frameless glass balustrade
frame to future detail, supported by RHS New roof structure over fire stair New feature weatherboard New roof structure
extension walkway, supported New feature weatherboard wall extension walkway, supported with anodised aluminium uprights
columns with select powdercoated extension. Provide roof cover for wall cladding with select supported by RHS
by RHS columns below. Select cladding with select paint finish by RHS columns below. Select and handrail, fixed to new
'timber-look' aluminium battens over and full extent of stair and bridge link paint finish columns to walkway below SUNCOAST RESORT BUSINESS CENTRE
roof sheeting T.B.C. roof sheeting T.B.C. concrete hob on existing floor slab
50 x 50 SHS capping to top of frame SUITE 2 CNR GARDAK ST & SURF RD
ALEXANDRA HEADLAND Qld See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Proposal Plans_Minor Change_Stage 1 & 2.pdfRelated documentApplication case desk ↗
Proposal Plans_Minor Change_Stage 1 & 2.pdfRelated documentApplication case desk ↗
About this file
- File size
- 18.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.