RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
41. Where proprietary devices are endorsed as part of the Operational Works
Approval, a copy of a signed supply agreement between the body corporate/site
operator and the stormwater filtration system supplier for the maintenance of the
proprietary devices must be provided to Council prior to the pre-start meeting for
the development. The supply agreement must be for at least 10 years.
Acid Sulfate Soils
42. All works must be carried out in accordance with an Acid Sulfate Soil and
Groundwater Management Plan for the development prepared by a qualified
person* and provided in the application for the Development Permit for
Operational Works.
43. All waters, including stormwater runoff, groundwater seepage and leachate from
acid sulfate soils must achieve the following quality prior to release from the site:
a pH range of 6.5-8.5 pH units;
50mg/L maximum total suspended solids concentration;
0.3mg/L maximum total iron concentration;
0.2mg/L maximum total aluminium concentration;
no visible plume at either the point of release from the site or within a
waterway.
44. The basement must be designed and constructed as a water excluding structure
in accordance with Australian Standard AS3735 “Concrete Structures for
Retaining Liquids” to ensure groundwater does not enter the basement after
construction is completed.
45. All treated material must undergo verification undertaken by a qualified person*
using the SPOCAS or Chromium Reducible Sulphur testing suite, and the results
must be submitted to Council for appraisal.
46. The application for Operational Works must demonstrate that continual
dewatering of groundwater’s will not occur as a result of groundwater movement
along any bedding material associated with pipes and around the basement of
the development.
Electricity and Telecommunication Services
47. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
48. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Easements/Covenants
49. Unless otherwise agreed in writing by the relevant service provider, any public or
third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
Page 12 of 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.