RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
Stormwater Drainage
24.23. The site must be provided with a stormwater drainage system connecting
to a lawful point/s of discharge in Garnet Street and/or Wattle Street. The works
must be undertaken in accordance with an Operational Works approval in
compliance with the relevant sections of Queensland Urban Drainage Manual
and supported by a detailed stormwater drainage design prepared and certified
by a suitably qualified and experienced Registered Professional Civil Engineer
(RPEQ).
25.24. The development of the site must not worsen existing drainage conditions
on other properties by diverting stormwater runoff or cause additional stormwater
ponding on any other property.
26.25. Stormwater runoff from the development must be disposed of on-site
without causing scour or damage to the subject site or any adjoining property.
Earthworks and Retaining Walls
27.26. All earthworks must be carried out in compliance with an Operational
Works Development Permit.
28.27. All earthworks and associated batters/retaining walls must be contained
entirely within the subject site unless written permission from the respective
landowner(s) is provided to Council.
29.28. All earthworks must be undertaken in accordance with the provisions of
Australian Standard AS3798: Guidelines on Earthworks for Commercial and
Residential Developments, Council’s codes and relevant government regulations
and guidelines. Certification must be provided by an RPEQ and submitted to
Council prior to the issue of the Certificate of Classification for the building.
30.29. The development works must not adversely impact on the stability of the
subject site, any other property or private or public structure.
31.30. Earthworks and development works carried out on site must not affect the
structural integrity of any of the existing fences or structures that border the site.
Fences that are affected shall be replaced prior to the Building Certifier issuing
the Certificate of Classification.
Telecommunication Services
32.31. Unless otherwise stipulated by telecommunications legislation at the time
of construction, the development must be provided with all necessary conduits,
pits and pipes to accommodate the future connection of optic fibre technology
telecommunications.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Lost.
Page 19 of 26