GENERAL COMMITTEE MEETING                                                    15 OCTOBER 2018


              Building Demolition/Removal/Relocation
        20.   Where the development involves the removal, relocation or demolition of a
              building, a Waste Management Plan (construction and demolition) in accordance
              with Planning Scheme Policy 11, Waste Management Plans must be submitted
              and approved by Council’s Environmental Health Officer prior to issue of a
              development permit for operational works for demolition, removal or relocation of
              any building other than a shed.
              The purpose of the Waste Management Plan is to facilitate the segregation of
              waste for the effective reuse and recycling of such materials. Segregated wastes
              attract significantly reduced disposal fees at the landfill with some items free.
              Higher gate fees are charged for mixed waste.
              Waste storage areas must provide adequate separation of all reusable,
              recyclable and waste materials. These must be located so that they are
              convenient and safe to use.
              The Plan must contain the following information:
                   The site area for the storage and separation of waste is to be shown on the
                   plan drawings accompanying the application
                   A waste management table as indicated below is to be completed showing
                   how waste material is to be segregated - recycled – reused or disposed.
                   Table – Waste Management Table
               MATERIALS ON-SITE                                   DESTINATION
                                                     Re-use and Recycling                   Disposal
               Expected          Estimated    On-site             Off-site              *specify contractor
               waste             volume(m³)   *specify proposed   *specify              and landfill site or
               materials                      re-use or on-site   contractor     and    other disposal site
                                              recycling methods   recycling outlet
               Excavation
               material
               Green waste
               Bricks
               Concrete
               Timber-please
               specify
               Plasterboard
               Metals - please
               specify
               Asbestos
               Other - please
               specify

              Note * If a demolition contractor is undertaking works, then the Waste
              Management table is to be completed by the demolition contractor.


                                                                                       Page 6 of 26
Log in to download the original file

2018-10-15 General Committee Meeting Notes(PDF, 786KB).pdf · 805 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.