RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 15 OCTOBER 2018
provide a survey plan prepared by a suitably qualified person which
identifies the mature trees on site and their possible retention in particular
the trees near the site boundaries;
the large eucalypt tree near the proposed driveway in Val Crescent must
be retained. In this regard, an arborist report outlining measures to maintain
the health of the tree during the design, construction and operational phase
of the development must be submitted for operational works approval;
any vegetated water quality treatment system must be located to allow for
landscape screening of the development.
ENGINEERING
External Works
26. Goodchap Street and Val Crescent must be upgraded for the length of their
frontage to the subject site. The works must be undertaken in accordance with
an Operational Works approval and must include in particular:
reconstruction of any damaged kerb and channelling;
construction of pedestrian footpaths in accordance with the conditions of
this Decision Notice;
removal of the existing property accesses and reinstatement of the kerb,
footpath and verge area to match the balance of the site frontage, including
the provision of topsoil and turf where the existing verge is grassed;
relocation/reinstatement of existing on-street parking bays required as a
result of development works;
linemarking for any potential additional on street parking spaces.
This Condition is imposed pursuant to s145 of the Planning Act 2016 being non-
trunk infrastructure and s128 being necessary trunk infrastructure identified by
Council’s LGIP to service the development.
27. The existing formation in Val Crescent must be upgraded from the existing
formation in Goodchap Street and extending to the tangent point in the kerb line
adjacent to the northern boundary of No 3 Val Crescent. The works must be
undertaken in accordance with an Operational Works approval and must include
but not be limited to:
works designed and constructed in accordance with Council’s Planning
Scheme Policy PSP 5 – Engineering Design Standards – Roads, Drainage
and Earthworks (section 3.19(d) – Industrial/Commercial – Local road);
the full width of the formation in Val Crescent;
reinstatement of existing linemarking.
This Condition is imposed pursuant to s145 of the Planning Act 2016 being non-
trunk infrastructure.
Page 8 of 26