Including amendments to 3 July 2017
Type of development Assessment Relevant assessment
The Noosa Plan
categoryCategories of criteriaAssessment benchmarks for
35
development and assessable development -
assessment applicable code if development is
self-assessable or requires code
assessmentand requirements for
accepted development
works associated with assessment —
material change of use a) Landscaping Code; and
where Development b) Engineering Works Codes.
Permit for material
change of use has been
issued
Carrying out operational Code assessableCode If code assessablecode assessment
work associated with assessment —
reconfiguring a lot a) Landscaping Code; and
where Development b) Engineering Works Codes.
Permit for reconfiguring
a lot has been issued
Carrying out operational Self-assessableAccepted If self-assessableaccepted
work for the development subject to development subject to
construction of a requirements requirements—
driveway for a Column 2 of Table 14.48 of the
Detached house or Code assessableCode Detached House Driveways Code
Community assessment if not complying
40
residence with column 2 of Table 14-48 If code assessablecode assessment
of the Detached House —
Driveways Code Detached House Driveways Code.
Carrying out operational Code assessableCode If code assessablecode assessment
works for prescribed assessment —
41
tidal works Table 14.64 of Watercourses Works
42
Code
Excavation or filling of Self-assessableAccepted If self-assessableaccepted
land not associated with development subject to development subject to
43
a material change of requirements if— requirements—
use (not for the purpose a) Column 2 of Table 14-52,
of constructing a dam) a) Detached Housing Zone Earthworks Code; and
and involving less than b) Column 2 of Table 14-53 of the
3
10m of material; or Erosion and Sediment Control
b) in all other zones and Code
3
involving less than 100m
of material. If code assessablecode assessment
—
Code assessableCode a) Earthworks Code; and
assessment if— b) Erosion and Sediment Control
a) not complying with Code.
column 2 of Table 14-52
of the Earthworks Code;
or
b) Detached Housing Zone
3
and involving 10m or
more of material; or
40
A separate operational works approval is not required where the construction of a driveway for a detached house or
community residence is associated with a material change of use.
41
Prescribed tidal works is defined in Schedule 4A of the Coastal Protection and Management Regulation 2003
42
The Prescribed Tidal Works Code under Schedule 4A of the Coastal Protection and Management Regulation 2003 also
applies.
43-44
This applies only once to any premises
5-20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.