Skip to the record
Search everything, all in one place.

Original source · versioned page text

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

     Column 1                          Column 2                             Column 3




                                                                                                                      Including amendments to 3 July 2017
Type of development                   Assessment                       Relevant assessment




                                                                                                     The Noosa Plan
                                 categoryCategories of         criteriaAssessment benchmarks for
                                                                                             35
                                   development and                 assessable development -
                                      assessment                applicable code if development is
                                                                 self-assessable or requires code
                                                                assessmentand requirements for
                                                                     accepted development
                            c)    in all other zones and
                                                  3
                                  involving 100m or more
                                  of material.

Excavation or filling not   Self-assessableAccepted            If self-assessableaccepted
associated with a           development subject to             development subject to
                                        44
material change of use      requirements if—                   requirements—
for the purpose of                                             a) Column 2 of Table 14-52 of the
constructing a dam          a)    Rural Settlement Zone               Earthworks Code; and
                                  and involving less than      b) Column 2 of Table 14-53 of the
                                        3
                                  500m of material; or                Erosion and Sediment Control
                            b)    Rural Zone where the lot            Code.
                                  is 5ha or greater; or
                            c)    Rural Zone where the lot     If code assessablecode assessment
                                  is less than 5ha and         —
                                                           3
                                  involving less than 500m     a) Earthworks Code; and
                                  of material.                 b) Erosion and Sediment Control
                                                                   Code.
                            Code assessableCode
                            assessment if—
                            a) not complying with
                                column 2 of Table 14-52
                                of the Earthworks Code;
                                or
                            b) Rural Settlement Zone
                                                    3
                                and involving 500m or
                                more of material; or
                            c) Rural Zone where the lot
                                is less than 5ha and
                                                3
                                involving 500m or more
                                of material; or
                            d) in all other zones.




                                                  5-21
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.