Original source · versioned page text
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file: it may take a few minutes
The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
column 1 column 2
Including amendments to 3 July 2017
Specific Outcomes Probable solutions
The Noosa Plan
Noosa Trail Network
O13 A comprehensive network of bridle trails and S13.1 No solution provided
pedestrian and bicycle linkages is established,
enhanced and protected incorporating road
reserves, State forests, Council owned land and
private lands consistent with the lifestyle and
outdoor recreation needs of the Shire’s residents
and visitors;
AND
O14 Existing and future pedestrian, bridle trail or S14.1 Development includes linkages to or
bicycle linkages are retained as part of a Shire wide between existing or future components of
trail network. the Noosa Trail Network, as indicated in
Schedule 5 – Map 2;
AND
S14.2 Development does not have an
adverse impact on the access functions of
the Noosa Trail Network, as indicated in
Schedule 5 – Map 3, including severing of
existing or future linkages; or
S14.3 Alternative linkages to those
indicated in Schedule 5 – Map 2 are
provided;
AND
S14.4 Linkages to the Noosa Trails Network
are designed and constructed in accordance
with—
a) Australian Standard 2156.1 Walking
Tracks Part 1: Classification and
Signage to a minimum of a Class 4
Standard; and
b) Australian Standard 2156.2 Walking
Tracks Part 2. Infrastructure Design
Pedestrian and bicycle pathways
O15 Safe and convenient pedestrian and bicycle S15.1 Pedestrian and bicycle pathways are
pathways are provided and retained between and provided and retained where indicated in the
around key destinations. Priority Infrastructure Plan in Part 15;
AND
S15.2 Contributions toward pedestrian and
bicycle pathways are provided in
accordance with the Priority Infrastructure
Plan in Part 15.
5-30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.