Skip to the record
Search everything, all in one place.

Original source · versioned page text

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                                             column 1                                         column 2
                 Including amendments to 3 July 2017




                                                                       Specific Outcomes                                  Probable solutions
The Noosa Plan



                                                       Noosa Trail Network
                                                       O13 A comprehensive network of bridle trails and        S13.1 No solution provided
                                                       pedestrian and bicycle linkages is established,
                                                       enhanced and protected incorporating road
                                                       reserves, State forests, Council owned land and
                                                       private lands consistent with the lifestyle and
                                                       outdoor recreation needs of the Shire’s residents
                                                       and visitors;
                                                       AND
                                                       O14 Existing and future pedestrian, bridle trail or     S14.1 Development includes linkages to or
                                                       bicycle linkages are retained as part of a Shire wide   between existing or future components of
                                                       trail network.                                          the Noosa Trail Network, as indicated in
                                                                                                               Schedule 5 – Map 2;
                                                                                                               AND
                                                                                                               S14.2 Development does not have an
                                                                                                               adverse impact on the access functions of
                                                                                                               the Noosa Trail Network, as indicated in
                                                                                                               Schedule 5 – Map 3, including severing of
                                                                                                               existing or future linkages; or
                                                                                                               S14.3 Alternative linkages to those
                                                                                                               indicated in Schedule 5 – Map 2 are
                                                                                                               provided;
                                                                                                               AND
                                                                                                               S14.4 Linkages to the Noosa Trails Network
                                                                                                               are designed and constructed in accordance
                                                                                                               with—
                                                                                                               a) Australian Standard 2156.1 Walking
                                                                                                                   Tracks Part 1: Classification and
                                                                                                                   Signage to a minimum of a Class 4
                                                                                                                   Standard; and
                                                                                                               b) Australian Standard 2156.2 Walking
                                                                                                                   Tracks Part 2. Infrastructure Design
                                                       Pedestrian and bicycle pathways
                                                       O15 Safe and convenient pedestrian and bicycle          S15.1 Pedestrian and bicycle pathways are
                                                       pathways are provided and retained between and          provided and retained where indicated in the
                                                       around key destinations.                                Priority Infrastructure Plan in Part 15;
                                                                                                               AND
                                                                                                               S15.2 Contributions toward pedestrian and
                                                                                                               bicycle pathways are provided in
                                                                                                               accordance with the Priority Infrastructure
                                                                                                               Plan in Part 15.




                                                                                                        5-30
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.