Original source · versioned page text
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file: it may take a few minutes
The original of this document is very large (18.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
column 1 column 2
Including amendments to 3 July 2017
Specific Outcomes Probable solutions
The Noosa Plan
Materials and finishes
O10 Buildings and other structures use materials S10.1 Buildings—
and finishes that complement the rural character a) use a mix of lightweight and textured
and integrate with the surrounding natural external building materials, including
landscape timber, corrugated iron, steel and
weatherboard; or
b) use masonry construction with where
variation in texture, detailing and the
like;
c) use materials and finishes that blend
with the surrounding vegetation.
5.10 Environment, Conservation and Recreation
Environment and cultural heritage values
O11 There are no significant adverse effects on No solution provided
biodiversity, native vegetation, habitat, landscape
quality, water quality or cultural heritage values, Editor’s note
including those related to—
a) changes to natural drainage; PSP24 – Effluent Disposal details
b) disturbance of the wetland system; requirements for the design and siting of
c) management of landslide and fire risk; effluent disposal systems where located
d) erosion and the transport of sediments off outside a sewerage service area.
site; Compliance with PSP24 will be considered
e) unmanaged public access; as part of Council’s assessment of the
46
f) effluent disposal ; plumbing and drainage application.
g) changes to fauna habitat and behaviour; and
h) disturbance of buildings and features, Advisory note
including natural features, of cultural heritage PSP24 – Effluent Disposal details
significance. requirements for the design and siting of
effluent disposal systems where located
outside a sewerage service area.
Compliance with PSP24 will be considered
as part of Council’s assessment of the
plumbing and drainage application.
Open space network
O12 An integrated open space network is S12.1 Open space corridors and existing
established, enhanced and protected throughout native vegetation in areas indicated in
the locality to— Schedule 5 – Map 3 are protected from
a) provide for both passive and active fragmentation and encroachment by
recreational pursuits; development.
b) provide connectivity for pedestrians, cyclists,
and horse riders;
c) provide habitat connectivity for wildlife;
d) protect watercourses and drainage lines;
e) protect vegetation on steep slopes; and
f) form a scenic backdrop for residential
development.
46
Council may request additional information on the proposed method of effluent disposal to ensure the nature of the
development is compatible with environmental values. Refer to PSP1 – Information Council May Request.
5-29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.