Original source · versioned page text
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
column 1 column 2
Specific Outcomes Probable solutions
Including amendments to 3 July 2017
Noosa trail network
The Noosa Plan
O14 A comprehensive network of bridle trails and S14.1 No solution provided
pedestrian and bicycle links is established,
enhanced and protected incorporating road
reserves, State forests, Council owned land and
private lands consistent with the lifestyle and
outdoor recreation needs of the Shire’s residents
and visitors;
AND S15.1 Development includes linkages to or
O15 Existing and future pedestrian, bridle trail or between existing or future components of
bicycle linkages are retained as part of a Shire wide the Noosa Trail Network, as indicated in
trail network. Schedule 5 – Map 2;
AND
S15.2 Development does not have an
adverse impact on the access functions of
the Noosa Trail Network, including severing
of existing or future linkages; or
S15.3 Alternative linkages to those
indicated in Schedule 5 – Map 2 are
provided;
AND
S15.4 Linkages to the Noosa Trail Network
are designed and constructed in accordance
with—
a) Australian Standard 2156.1 Walking
Tracks Part 1: Classification and
Signage to a minimum of a Class 4
Standard; and
b) Australian Standard 2156.2 Walking
Tracks Part 2: Infrastructure Design.
10-30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.