Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                           column 1                                                           column 2
                       Specific Outcomes                                                  Probable solutions




                                                                                                                                    Including amendments to 3 July 2017
Noosa River




                                                                                                                        The Noosa Plan
O11 Commercial development on and adjacent to                             S11.1 No solution provided
the Noosa River is designed to –
a) provide for uses for marine facility purposes
     only;
b) be compatible with the scenic values of the
     waterway;
c) provide a high level of amenity, including
     ensuring low ambient noise levels;
d) not increase the overall scale and intensity of
     commercial operations;
e) ensure no additional commercial leases on the
     Noosa River;
f)   ensure no net increase in the gross floor area
     of buildings or structures;
g) use materials, natural finishes and colours that
     blend with the surrounding natural landscape;
     and
h) reflect the character and setting of the locality
     (such as timber and tin construction with a
     traditional pitched roof design).

O12 Commercial development does not extend                                S12.1 Development does not increase the
                                      51
beyond existing commercial lease areas .                                  overall footprint of commercial jetties and
                                                                          structures.
O13 The loading and unloading of passengers is
confined to the commercial lease areas of the                             S13.1 No probable solution
respective commercial operation.




51
     This refers to the commercial lease area existing at the time of gazettal of this plan.



                                                                10-29
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.