Skip to the record
Beware of cheap imitations.

Original source · versioned page text

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                                         column 1                                         column 2
                                                                   Specific Outcomes                                  Probable solutions
                                                  Employment Precincts E4 and E5
                                                  O146 Development provides for the expansion of           No solution provided
            Including amendments to 3 July 2017
The Noosa Plan




                                                  the Noosaville Industrial Estate;
                                                  AND
                                                  O147 Development in Precincts E4 and E5
                                                  recognises the role these precincts play in linking
                                                  the Noosaville Industrial Estate to the Business
                                                  Uses and open space functions within the Shire
                                                  Business Centre site;
                                                  AND
                                                  O148 The nature, design and operation of any use
                                                  in Precinct E4 and E5 is compatible and has strong
                                                  relationships with development in other precincts, in
                                                  particular, Business Uses in Precinct B3;
                                                  AND
                                                  O149 Development has strong pedestrian and
                                                  bikeway connectivity with Precinct B1 and B3;
                                                  AND
                                                  O150 Vehicular parking is provided on-site;
                                                  AND
                                                  O151 Development complies with the Specific
                                                  Outcomes for the Industrial Zone within this locality.
                                                  Employment Precinct E6 and E7
                                                  O152 Precincts E6 and E7 are designed and                No solution provided
                                                  located to form an employment node with
                                                  unspecified employment opportunities that may be
                                                  developed in the later stages of the Shire Business
                                                  Centre;
                                                  AND
                                                  O153 A mix of uses are developed with business
                                                  associations formed between this node and
                                                  Precinct E1;
                                                  AND
                                                  O154 The northern section of Precinct E6 contains
                                                  a inter-regional transit facility;
                                                  AND
                                                  O155 Development has strong visual linkages with
                                                  Precincts E1, OS1 and OS2;
                                                  AND
                                                  O156 Development has strong pedestrian and
                                                  bikeway connectivity with Precincts B1 and E1;
                                                  AND
                                                  O157 Development in Precinct E7 is compatible
                                                  with, and does not impact upon, the open space
                                                  function of Precinct OS2;
                                                  AND
                                                  O158 Buildings generally have a presentation to
                                                  the loop road;
                                                  AND
                                                  O159 Parking is provided on site, generally at the
                                                  side, rear or underneath of buildings;
                                                  AND
                                                  O160 Any Residential units are subordinate and
                                                  ancillary to non-residential uses on site, supporting
                                                  the business and community sectors




                                                                                                   11-80
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.