Skip to the record
The gold standard in government transparency.

Council archive · source document

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                                    column 1                                            column 2
                                                               Specific outcomes                         Probable solutions (if code assessment)
            Including amendments to 3 July 2017
The Noosa Plan



                                                  Engineering and site works
                                                  O14 Development is sited and designed to—            S14.1 Works, including roads, driveways,
                                                  a)   provide adequate separation distance            fences, sewer lines and other infrastructure—
                                                       between the vegetation to be protected          a)     do not transect areas of vegetation; or
                                                       and the development to avoid                    b)     are co-located within a combined utility
                                                       disturbing, destabilising and                          corridor; and
                                                       deoxygenating any tree or altering the          c)     provide for fauna underpasses, speed
                                                       drainage;                                              reduction devices and associated
                                                  b)   avoid traversing or fragmenting                        fencing, lighting and warning signs,
                                                       vegetation or habitats for significant flora           where appropriate;
                                                       or fauna species; and                           AND
                                                  c)   avoid creating barriers to faunal               S14.2 Development within or adjacent to
                                                       movement.                                       areas of vegetation, incorporate fauna friendly
                                                                                                       fences;
                                                                                                       AND
                                                                                                       S14.3 Vegetation is protected from
                                                                                                       interference resulting from clearing or
                                                                                                       construction activities by—
                                                                                                       a)     clearly marking vegetation to be retained
                                                                                                              with flagging tape;
                                                                                                       b)     installing protective fencing around the
                                                                                                              dripline of the vegetation and avoid
                                                                                                              filling and excavation in these fenced
                                                                                                              areas; and
                                                                                                       c)     ensuring stock piling, storage and
                                                                                                              vehicle parking occur outside the
                                                                                                              identified vegetation areas;
                                                                                                       AND
                                                                                                       S14.4 Low impact construction techniques are
                                                                                                       used around vegetation to minimise
                                                                                                       interference with the vegetation.
                                                  Filling and excavation
                                                  O15 Vegetation is not adversely impacted             No solution provided.
                                                  upon by earthworks and changes to the
                                                  hydrological regime, including changes to
                                                  ground water levels, flooding levels, run-off
                                                  and tidal hydraulics.




                                                                                                   13-14
                                                                                            Biodiversity Overlay
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.