Council archive · source document
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
column 1 column 2
Specific outcomes Probable solutions (if code assessment)
Including amendments to 3 July 2017
13.10 Vegetation management
The Noosa Plan
Replanting and rehabilitation
O16 Development provides for ecologically S16.1 Landscaping and rehabilitation
important areas to be restored and enhanced complements and supports ecologically
through the following measures— important habitats by—
a) siting landscaped areas to complement a) utilising native plants of local origin;
and enhance existing vegetation;
b) removal of all species likely to displace b) utilising suitable plant species identified
native flora species or degrade fauna in PSP3 – Landscaping Plants and
habitat; Guidelines;
16
c) replanting and rehabilitating degraded c) replicating adjacent remnant habitats,
habitat; and including understorey vegetation;
d) replacing any vegetation removed with
suitable replacement vegetation of local d) creating or enhancing linkages between
origin. existing habitats;
e) avoiding the use of undesirable plant
species listed in Table 9.1 of PSP3
Landscaping Plants and Guidelines; and
f) planting riparian zones to filter
stormwater run-off and provide for wildlife
habitat;
AND
S16.2 Vegetation removed is replaced with—
a) plantings of equivalent area that replicate
the floristic structure of the vegetation
removed; or
b) where this is not possible due to the
characteristics of the site and the
development, plantings twice the number
of the removed trees and plants of local
origin.
Fire management
O17 Fire management measures are adopted No solution provided
based on ecological principles, which—
a) maintain and enhance biodiversity;
b) minimise threat of fire to the natural
environment, life and property; and
c) provide for effective use and
maintenance of buildings and structures.
16
Revegetation and rehabilitation works are to be carried out in accordance with an approved Revegetation and
Rehabilitation Management Plan, as referred to in PSP18 Ecological Assessment Guidelines
13-15
Biodiversity Overlay
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.