Specific Outcomes Probable solutions
Including amendments to 3 July 2017
The Noosa Plan
Earthworks No solution provided.
O21 Filling or excavation only occurs where
it—
d) results in the protection, rehabilitation
and repair of ecologically important
areas, watercourses, drainage lines and
wetlands; and
e) does not adversely impact on the overall
hydrology, hydraulics and flood capacity
of the waterway, and does not result in a
reduction in flood storage capacity.
f) does not adversely impact on water
levels on properties elsewhere.
Flood impacts
O22 Development does not directly, indirectly S22.1 In the Flood Hazard area, as identified on
or cumulatively alter the flood characteristics the Natural Hazards Overlay Maps, or in areas
external to the development site for all flood otherwise determined to be subject to the
events up to and including the defined flood defined flood event—
event based on— a) there is no loss of on-site flood storage
a) current climate conditions; and capacity; and
b) incorporating an appropriate allowance b) all changes to level, depth, duration and
for the predicted impacts of climate velocity of floodwaters are contained within
change. the site for all flood events up to and
including the defined flood event based on
current climate and predicted impacts of
climate change at 2100.
13-48
Natural Hazards and Natural Resources Overlays
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.