                       column 1                                             column 2
                 Specific Outcomes                                      Probable solutions




                                                                                                                        Including amendments to 3 July 2017
Building design and building form




                                                                                                            The Noosa Plan
O23 Development ensures that building design         S23.1 Buildings and materials and surface
and built form accounts for the potential flood      treatments used below the defined flood event
risks and are resilient to flood events by—          are resilient to water damage and do not include
a) ensuring building materials used have             wall cavities that may be susceptible to the
     high water resistance and will improve the      intrusion of water and sediment;
     resilience of a building during and after a
     flood event; and                                S23.2 Buildings are designed to integrate well
b) maintaining a functional and attractive           with the street level and the levels of adjoining
     street front address appropriate to the         properties to facilitate pedestrian flows and visual
     intended use.                                   and physical connectivity between the footpath
                                                     and ground floors;

                                                     S23.3 Buildings incorporate appropriate
                                                     screening to ensure that any under-storey is not
                                                     visible from the street, where such screening
                                                     does not impede flood water flows;

                                                     S23.4 Residential buildings minimise risk from
                                                     flooding by providing parking and other low
                                                     intensive, non-habitable uses at ground level;

                                                     S23.4 Non-residential buildings and structures
                                                     are oriented to the street by activating the street
                                                     frontage with appropriate uses and urban design
                                                     treatments such as recessed wall treatments,
                                                     screening or landscaping, whilst allowing for flow
                                                     through of flood waters on the ground floor.

                                                     Editor’s note
                                                     The use of flood resilient building materials is
                                                     also encouraged in areas above the defined
                                                     flood event (up to the probable maximum flood
                                                     (PMF) to reduce the consequences of flooding
                                                     associated with events larger than the defined
                                                     flood event.




Disaster Management
O24 Development supports, and does not               S24.1 Development does not—
unduly burden, disaster management response          a) increase the number of people calculated to
or recovery capacity or capabilities.                    be at risk from flooding;
                                                     b) increase the number of people likely to need
                                                         evacuation;
                                                     c) shorten flood warning times; or
                                                     d) impact on the ability of traffic to use
                                                         evacuation routes, or unreasonably increase
                                                         traffic volumes on evacuation routes.


                                                  13-49
                              Natural Hazards and Natural Resources Overlays
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.