Skip to the record
Every meeting, every word.

Council archive · source document

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                     column 1                                                      column 2
                 Specific Outcomes                                             Probable solutions




                                                                                                                                  Including amendments to 3 July 2017
Resource/processing separation area




                                                                                                                      The Noosa Plan
O7 Development within the resource/processing                  S7.1 No additional lots are created within
separation area—                                               either Key Resource Areas or Local Resource
a)   does not increase the number of people                    Areas shown on Overlay Maps OM1.5—
                                                                       56
     living in the separation area; and                        OM9.5.
b)   incorporates measures which avoid or
     mitigate adverse impacts from the winning                 S7.2 Development incorporates design,
     and transportation of the extractive resource;            orientation and construction materials that
     and                                                       mitigate the potential adverse effects from an
c)   does not compromise the function of the                   existing or future extractive industry to
     separation area in providing a buffer                     acceptable levels by:
     between Extractive uses and other uses.
                                                               a)        locating buildings and structures the
                                                                         greatest distance practicable from the
                                                                         resource/processing area and
                                                                         associated transportation route,

                                                               b)        designing buildings so the areas
                                                                         where people live, work and
                                                                         congregate (habitable rooms) are
                                                                         furthermost from the
                                                                         resource/processing area and
                                                                         associated transportation route,

                                                               c)        minimising openings in walls closest
                                                                         to extractive operations,

                                                               d)        providing mechanical ventilation to
                                                                         habitable rooms,

                                                               e)        use of appropriate construction
                                                                         methods and materials including
                                                                         insulation and glazing materials, and

                                                               f)        providing private outdoor recreation
                                                                         space adjacent to a building façade
                                                                         shielded from the extractive industry
                                                                         or resource.

                                                               Editor’s note:
                                                               Where lots have land both within and outside
                                                               the separation area, a residential use of the
                                                               lot may be approved provided dwellings are
                                                               located outside the separation areas. Plans
                                                               lodged with Council shall include building
                                                               envelopes that identify the location of the
                                                               dwelling.




56
   PSP1 outlines information Council may request for development within either Key Resource Areas or Local Resource
Areas


                                                       13-55
                                   Natural Hazards and Natural Resources Overlays
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.