Skip to the record
Accept no imitations.

Council archive · source document

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                                       column 1                                                      column 2
                                                                   Specific Outcomes                                             Probable solutions
            Including amendments to 3 July 2017
The Noosa Plan




                                                  Haulage routes separation area
                                                  O8 Development does not adversely affect the                    S8.1 Development does not increase the
                                                  safe and efficient operation of vehicles                        number of properties with access points to the
                                                  transporting extractive materials.                              haulage routes shown on Overlay Maps
                                                                                                                  OM1.5—OM9.5.
                                                                                                                  OR
                                                                                                                  S8.2 Development access points are
                                                                                                                  designed to ensure the safe and efficient
                                                                                                                  operation of vehicles transporting extractive
                                                                                                                  materials.
                                                  Design and operation
                                                  O9 The design and operation of extractive                       No solution provided
                                                  resource uses minimises and mitigates the
                                                  potential for adverse impacts on environmentally
                                                  sensitive areas and amenity of existing uses.

                                                  Extractive Resources
                                                  O10 Industrial business Type 3 Extractive are                   No solution provided
                                                  designed, located and operated to ensure—
                                                                       57
                                                  a)    haulage routes associated with extractive
                                                        resources—
                                                         i       are located on roads where the
                                                                 haulage route will minimise adverse
                                                                 impacts on residential and urban
                                                                 residential amenity;

                                                         ii      are located on roads which are of
                                                                 adequate construction, or may be
                                                                 upgraded, to a standard
                                                                 commensurate with the volume, type
                                                                 and nature of the vehicular traffic
                                                                 utilising the haulage route; and

                                                         iii     are adequately maintained as a part
                                                                 of the utilisation of the extractive
                                                                 resource;
                                                  b)     the utilisation of any extractive resource
                                                         does not result in adverse visual impacts
                                                         from major roads; and
                                                  c)     the rehabilitation of extractive industry sites,
                                                         prior to or in conjunction with land use

                                                  57
                                                   Some haulage routes associated with the Extractive use are identified within either the Key Resource Area or Local
                                                  Resource Area shown on Overlay Maps OM1.5-OM9.5.

                                                                                                          13-56
                                                                                      Natural Hazards and Natural Resources Overlays
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.