Skip to the record
Accept no substitutions.

Council archive · source document

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

Table Error! No text of specified style in document.-16 Industrial Business Type 3 Extractive




                                                                                                            Including amendments to 3 July 2017
                    Column 1                                              column 2




                                                                                                The Noosa Plan
                Specific Outcomes                                 Probable solutions (if code
                                                                 assessablecode assessment)
14.26     Effects of Use
Buffers, Separation and Amenity                           No Solution Provided
O86O87The extractive industry is adequately
separated from sensitive uses to minimise potential
for nuisance or complaint.

O87O88The design, operation and staging of the
extractive industry promotes the efficient utilisation
of the resource.

O88O89The design, operation and staging of the
extractive industry mitigates vibration, noise, dust,
lighting and other impacts on the surrounding area.

O89O90The design, operation and staging of the
extractive industry reduces impacts on natural
environmental values to the greatest extent
reasonably practicable and where impacts cannot
be avoided the loss or decrease in values is
minimised or offset.

O90O91The design, operation and staging of
extractive industry optimises potential alternative
land uses after the cessation of extractive activities.

O91O92The design, operation and staging of the
extractive industry has regard to the desired visual
character of the locality.




                                                    31
                                            Business Uses Code
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.