2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                                                      Column 1                                             column 2
            Including amendments to 3 July 2017




                                                                  Specific Outcomes                              Probable solutions (if code
The Noosa Plan



                                                                                                                assessablecode assessment)
                                                  Management of Operations                                No Solution Provided
                                                  O92O93On-site drainage is designed, constructed
                                                  and maintained to:
                                                  a)   minimise erosion;
                                                  b)   avoid pollution of groundwater and surface
                                                       water;
                                                  c)   provide opportunities to conserve and reuse
                                                       water on the site; and
                                                  d)   prevent additional flooding or inundation.

                                                  O93O94Noise, vibration and dust emissions from
                                                  the development are managed to acceptable levels.

                                                  O94O95Operations minimise lighting impacts on
                                                  roads and other properties

                                                  O95O96Public access to the site is managed
                                                  appropriately

                                                  O96O97Development is designed in a manner
                                                  which will not compromise the stability, safety or
                                                  operation of infrastructure.

                                                  O97O98Development is designed and managed to
                                                  minimise the risk and impact of any accidental spills
                                                  and / or releases of chemicals and other materials
                                                  that may contaminate soil, stormwater, groundwater
                                                  and/or air.

                                                  Landscaping                                             No Solution Provided
                                                  O98O99Landscaping complements biodiversity
                                                  values of the adjoining area.

                                                  Hours of Operation                                      No solution provided
                                                  O99O100 Extractive industry activities occurs at
                                                  times that will not result in disturbance at
                                                  surrounding uses.

                                                  Traffic and Transport
                                                  O100O101 The transportation of materials is
                                                  undertaken in a way which:
                                                  a)    maintains the safety and efficiency of the
                                                        roads comprising the transport route; and
                                                  b)    minimises amenity impacts on premises
                                                        within the transport routes separation area.




                                                                                                    32
                                                                                            Business Uses Code
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.