Skip to the record
The only place to find full transcripts.

Council archive · source document

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                    Column 1                                               column 2




                                                                                                           Including amendments to 3 July 2017
                Specific Outcomes                                Probable solutions (if code




                                                                                               The Noosa Plan
                                                                assessablecode assessment)
Rehabilitation                                            No solution provided
O101O102 Rehabilitation of the site, over the life of
the project and on its completion:
a)    provides for progressive/ staged rehabilitation
      works;
b)    includes appropriate clean-up works (taking
      particular account of areas of possible soil or
      water contamination);
c)    results in a stable final landform;
d)    provide suitable drainage and hydraulic
      conditions; and
e)    achieves a suitable degree of revegetation
      consistent with potential post-extraction land
      uses.

O102O103 Rehabilitation allows for suitable use of
any water storage created through the extraction
process, having regard to water quality, hydraulic
conditions, land form and vegetation.

O103O104Resource extraction activities in                 No solution provided
proximity to the Noosa River system only occur
where—
a)   there is a clear demonstrated need;
b)   no feasible and prudent alternatives are
     available; and
c)   it can be demonstrated that the intrinsic
     natural values and resources of the river
     system can be managed and protected in an
     ecologically sustainable manner.
O104O105Industrial business Type 3 Extractive             No solution provided
uses are designed, located and operated to
ensure—
a) haulage routes associated with extractive
    resources—
       i    are located on roads where the haulage
            route will minimise adverse impacts on
            residential and urban residential
            amenity;
       ii   are located on roads which are of
            adequate construction and which may
            be upgraded as part of the utilisation of
            the extractive resource; and
       iii are adequately maintained as a part of
            the utilisation of the extractive resource;
            and
b) the utilisation of any extractive resource does
    not result in adverse visual impacts from major
    roads; and
c) the rehabilitation of extractive industry sites,
    prior to or in conjunction with land use changes
    on the site of the resources or within buffers to
    the resource.




                                                    33
                                            Business Uses Code
Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.