Council archive · source document
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Column 1 column 2
Including amendments to 3 July 2017
Specific Outcomes Probable solutions (if code
The Noosa Plan
assessablecode assessment)
Rehabilitation No solution provided
O101O102 Rehabilitation of the site, over the life of
the project and on its completion:
a) provides for progressive/ staged rehabilitation
works;
b) includes appropriate clean-up works (taking
particular account of areas of possible soil or
water contamination);
c) results in a stable final landform;
d) provide suitable drainage and hydraulic
conditions; and
e) achieves a suitable degree of revegetation
consistent with potential post-extraction land
uses.
O102O103 Rehabilitation allows for suitable use of
any water storage created through the extraction
process, having regard to water quality, hydraulic
conditions, land form and vegetation.
O103O104Resource extraction activities in No solution provided
proximity to the Noosa River system only occur
where—
a) there is a clear demonstrated need;
b) no feasible and prudent alternatives are
available; and
c) it can be demonstrated that the intrinsic
natural values and resources of the river
system can be managed and protected in an
ecologically sustainable manner.
O104O105Industrial business Type 3 Extractive No solution provided
uses are designed, located and operated to
ensure—
a) haulage routes associated with extractive
resources—
i are located on roads where the haulage
route will minimise adverse impacts on
residential and urban residential
amenity;
ii are located on roads which are of
adequate construction and which may
be upgraded as part of the utilisation of
the extractive resource; and
iii are adequately maintained as a part of
the utilisation of the extractive resource;
and
b) the utilisation of any extractive resource does
not result in adverse visual impacts from major
roads; and
c) the rehabilitation of extractive industry sites,
prior to or in conjunction with land use changes
on the site of the resources or within buffers to
the resource.
33
Business Uses Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.