Skip to the record
Trusted by locals. Built for Noosa.

Council archive · source document

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                     column 1                                                    column 2




                                                                                                                                   Including amendments to 3 July 2017
                 Specific Outcomes                              Probable solutions (if code assessablecode




                                                                                                                       The Noosa Plan
                                                                               assessment)
Separation from incompatible uses
O2 Sufficient separation distance is provided                  No solution provided.
between Infrastructure Uses and incompatible
uses on the same site and neighbouring
premises to maintain amenity for neighbouring
uses.
O3 Vehicular access to the site of the                         S3.1. Vehicle access to the infrastructure is
Infrastructure Use does not adversely impact                   gained from roads other than local residential
on residential amenity.                                        streets to maintain residential amenity.

Building siting and design
O4 The siting and design of buildings or other                 No solution provided
structures reflects and is compatible with the
setting and character of the locality in which the
Infrastructure Use is located, including the use
of sympathetic colour schemes.
Safety and security
O5 Infrastructure Uses are secure and                          S5.1 For Installations and Towers—the use is
potential impacts from vandalism are minimised.                fenced with security fencing;
                                                               AND
                                                               S5.2 For other Infrastructure Uses—no
                                                               probable solution
Artificial lighting
O6 The generation of spill light by                            S6.1 Lighting associated with the use is
development, which gives rise to annoyance,                    designed, installed, operated and maintained in
discomfort, distraction or a reduction in the                  accordance with Section 3 of AS4282 The
ability to see essential information, is avoided.              Control of the Obtrusive Effects of Outdoor
                                                               Lighting.
Mechanical plant and equipment
O7 Mechanical plant and equipment                              S7.1 Plant and equipment are—
(including air conditioning equipment) are—                    a)    located more than 2m from any property
a)     positioned to minimise adverse impacts on                     boundary; and
       the amenity of any residential premises;                b)    screened by dense vegetation or fencing
b)     designed and positioned to visually                           (i.e. 1.5m wide vegetated buffer area);
       integrate with the building and roof design;            OR
       and                                                     S7.2 Plant and equipment are located within a
c)     appropriately screened.                                 building.
Environment & heritage values
O8 There are no significant adverse effects                    No solution provided
on the biodiversity, natural vegetation, native
wildlife, habitats, landscape quality, water
quality or heritage values, including those
                                                 a)            Editor’s note:
related to—
                                                               PSP24 – Effluent Disposal details requirements for
a)     changes to natural drainage;
                                                               the design and siting of effluent disposal systems
b)     disturbance to any of the wetland                       where located outside a sewerage service area.
       systems;                                                Compliance with PSP24 will be considered as part of
c)     management of landslide and fire risk;                  Council’s assessment of the plumbing and drainage
d)     erosion and the transport of sediments off-             application.
       site;
e)     unmanaged public access;                                  Advisory note
                         16
f)     effluent disposal ;                                       PSP24 – Effluent Disposal details
g)     changes to fauna habitat and behaviour;
16
  Council may request additional information on the proposed method of effluent disposal to ensure the nature of the
development is compatible with environmental values. Refer to PSP1 – Information Council May Request.




                                                             43
                                                 Infrastructure Uses Code

Used in these records

About this file

File size
18.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.