                                                                       column 1                                                  column 2
            Including amendments to 3 July 2017




                                                                   Specific Outcomes                            Probable solutions (if code assessablecode
The Noosa Plan



                                                                                                                               assessment)
                                                         and                                                      requirements for the design and siting of
                                                  h)     disturbance of buildings and features,                   effluent disposal systems where located
                                                         including natural features, of heritage                  outside a sewerage service area. Compliance
                                                         significance.                                            with PSP24 will be considered as part of
                                                                                                                  Council’s assessment of the plumbing and
                                                                                                                  drainage application.



                                                  Table Error! No text of specified style in document.-22 — Service & Utility Type 2 - Installation
                                                                         column 1                                                     column 2
                                                                     Specific Outcomes                                        Probable solutions (if code
                                                                                                                             assessablecode assessment)
                                                  14.40      Effects of use
                                                  O9 Electricity transmission line easements are                    S9.1 A minimum separation distance is
                                                  managed to ensure—                                                maintained from the electricity transmission
                                                  a)   the continuation of the transmission of bulk                 line to the closest boundary of habitable
                                                       electricity;                                                 buildings and child activity areas, as
                                                  b)   safety and amenity for residents, occupiers                  follows—
                                                       and land uses in close proximity;                            a)     20m for transmission lines up to
                                                  c)   natural environmental values are not                                132kV;
                                                       adversely impacted upon; and                                 b)     30m for transmission lines between
                                                  d)   the Shire’s visual and landscape qualities are                      133kV and 275kV; and
                                                       not adversely impacted upon.                                 c)     40m for transmission lines greater
                                                                                                                           than 275kV;
                                                                                                                    AND
                                                                                                                    S9.2 Only trees with a mature height of less
                                                                                                                    than 4m are planted within electricity
                                                                                                                    transmission line easements.

                                                  Table Error! No text of specified style in document.-23 —Service & Utility Type 3 - Tower
                                                                         column 1                                                     column 2
                                                                     Specific Outcomes                                        Probable solutions (if code
                                                                                                                             assessablecode assessment)
                                                  14.41      Effects of use
                                                  Visual amenity
                                                  O10 The tower is visually integrated with its                     S10.1 The tower is—
                                                  landscape or townscape setting so as not to be                    a)   not established in the Detached
                                                  visually dominant or obtrusive.                                        Housing, Semi-Attached Housing,
                                                                                                                         Attached Housing or Visitor Mixed Use
                                                                                                                         Zones;
                                                                                                                    b)   camouflaged through the use of
                                                                                                                         colours and materials which blend into
                                                                                                                         the surrounding landscape; and
                                                                                                                    c)   unobtrusive when viewed from any
                                                                                                                                                        17
                                                                                                                         part of the major road network; or

                                                                                                                    S10.2 The tower is co-located on an existing
                                                                                                                    telecommunication tower;
                                                                                                                    AND
                                                  17
                                                    PSP23 Telecommunication Towers provides guidance and information in relation to the installation of telecommunication
                                                  towers.




                                                                                                              44
                                                                                                  Infrastructure Uses Code

Used in these records

About this file

File size
18.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.