The 5,000 litres required can be included within
the water required in S4.2 or S5.1 providing it is
accessible for the purpose of fire fighting at all
times and not used for other domestic purposes.
Erosion and sediment control
O5 Development does not cause erosion or No solution provided.
result in transport of sediments off-site.
Editor’s note:
Persons undertaking development, including
building work, are required under the Environmental
Protection (Water) Policy 1997 (EPP) to ensure that
sediment and other material including building
waste, sawdust, concrete, cement or paint are not
deposited or released into a roadside gutter,
stormwater drain or waterway, or into a place where
it could reasonably be expected to move or be
washed into a roadside gutter, stormwater drain or
waterway and are not washed from the site.
Council enforces the EPP and penalties may apply.
Advisory Note
Persons undertaking development, including
building work, are required under the
Environmental Protection (Water) Policy
1997 (EPP) to ensure that sediment and
other material including building waste,
sawdust, concrete, cement or paint are not
deposited or released into a roadside gutter,
stormwater drain or waterway, or into a
place where it could reasonably be expected
to move or be washed into a roadside gutter,
stormwater drain or waterway and are not
washed from the site. Council enforces the
EPP and penalties may apply.
Safety and security
O6 For Multiple Housing Types 2, 3 and 4, S6.1 The building entrance is clearly
buildings and outdoor spaces are designed to identifiable and visible from the street, footpath
protect the personal security and safety of and driveway;
residents by allowing for natural surveillance. AND
S6.2 The internal path network has clear
sightlines to the dwelling entry and street
access points;
AND
S6.3 Visitors have direct access to the
entrance without passing through private
outdoor living areas.
Emergency access
O7 For Multiple housing Type 3, 4 & 5, site No solution provided
design and layout ensures efficient access and
egress for emergency vehicles.
Basement drainage
O8 Buildings and access works are designed S8.1 Enclosed car parking and manoeuvring
and sited to protect persons and property in the areas are constructed at a level that permits
48
Residential Uses Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB)Related documentPublic source context ↗Public source context ↗Public source context ↗
2017-06-06-p-e-agenda-attachment-1-to-item-6-draft-alignment-amendments-part-1-pages-1-907-pdfRelated documentPublic source context ↗
About this file
- File size
- 18.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.