2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)

of 907

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                   column 1                                               column 2




                                                                                                                       Including amendments to 3 July 2017
               Specific Outcomes                               Acceptable solutions (if self-




                                                                                                           The Noosa Plan
                                                      assessableaccepted development subject to
                                                                       requirements)
                                                       Probable solutions (if code assessablecode
                                                                        assessment)
services and utilities appropriate to its setting.    water or sewerage service area, appropriate
                                                      connection is provided to reticulated sewerage,
                                                      water supply and stormwater drainage.
Electricity supply infrastructure
O7 Uses and works maintain an adequate                S7.1 Buildings and structures (including
safe distance from electrical infrastructure          swimming pools, sheds, tennis courts or
including substations, overhead powerlines,           outbuildings) are not constructed under
power poles and transformers.                         overhead electricity transmission lines, or within
                                                      electricity easements.
Water Supply Infrastructure
O8 Existing water supply infrastructure,              S8.1 Buildings and structures are setback a
including pipeline corridor, is protected from        minimum of 20m from a water supply pipeline
incompatible development to ensure the safety         as shown on Overlay Map OM3.5.
and reliability of water supply network.
Steep Slopes and Landslide hazard areas
O9 Detached houses, Ancillary dwelling                S9.1 If on premises identified as a Landslide
units, and associated uses are sited or               Hazard Area on Overlay Maps OM1.3–9.3, or
constructed to maintain the safety of people and      on steep slopes the use does not–
property from the risk of landslide.                  a) involve the removal of vegetation other than
                                                          grass from use areas; or
                                                      b) involve excavating or filling of more than
                                                               3
                                                          50m of material (other than placement of
                                                          topsoil not exceeding 100mm in depth
                                                          relative to natural ground level; or
                                                      c) involve cut or fill with a depth of more than
                                                          2m relative to natural ground level; or
                                                      d) redirect or impede water flows in an
                                                          existing watercourse or stormwater drain;
                                                          or
                                                      e) involve construction of an on-site effluent
                                                          disposal system;
                                                      OR

                                                      S9.2 A site specific geo-technical report
                                                      prepared by a registered professional engineer
                                                      either—
                                                      a) certifies that the site is not at risk from
                                                           landslide emanating from the site or from
                                                           other land; or
                                                      b) identifies methods of stabilising all
                                                           buildings, accessways and use areas;
                                                      AND
                                                      S9.3 If the geo-technical report identifies
                                                      methods of stabilising buildings, accessways
                                                      and use areas, those methods are
                                                      implemented.
Height
O10 Buildings and other structures—                   S10.1 The maximum building height in metres
a)   are low rise and present a building height       and storeys is—
     consistent with structures on adjoining and      a)   if in the Visitor Mixed Use Zone – 12m
     surrounding land;                                     (but not exceeding 3 storeys); or
b)   have a maximum building height of—
                                                      b)   if in the Noosa Heads Locality, Attached
      i)    for Visitor Mixed Use Zone— 3


                                                     63
                                            Detached House Code

Used in these records

About this file

File size
18.9 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB).pdf · 18.9 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.