Table 14-42 — All Demolition, removal or relocation
Including amendments to 3 July 2017
column 1 column 2
The Noosa Plan
Specific Outcomes Acceptable solutions (if self-
assessableaccepted development subject to
requirements)
Probable solutions (if code assessablecode
assessment)
14.85 Re-use of buildings or materials
O1 Opportunities for re-use of buildings are S1.1 Buildings are relocated to another site and
maximised. adapted to meet the needs of users.
OR
S1.2 At least 10% of building materials are
reused or recycled (measured in cubic metres).
O2 The development ensures waste during S2.1 For assessable development a Waste
any construction and demolition works is Management Plan prepared in accordance with
minimised and construction and demolition Schedule 8 Demolition & Construction Waste
materials are reused and recycled where Management specifies—
possible. a) estimated volumes of waste to be
generated;
b) estimated volumes of recyclables;
c) initiatives to minimise waste by waste
reduction, reuse or recycling;
d) plans showing the location and details of
the waste storage areas; and
e) a description of the type of containers
proposed to store the waste.
14.86 Safety and protection of infrastructure
O3 Demolition, removal, relocation or S3.1 Infrastructure including, reticulated water,
associated works does not result in— sewerage, stormwater, and electricity are
a) ‘live’ or ‘active’ infrastructure that may protected from damage and made safe to the
present a risk to people using the site or standard required by the regulatory authority;
surrounding areas; or AND
b) damage to infrastructure or other works. S3.2 Infrastructure is disconnected, capped or
sealed including--
a) electricity meters are removed and
electrical wires disconnected; and
Editor’s note: b) telephone lines are disconnected; and
An approval will be required from Council’s Building c) high speed data cables and television
and Plumbing Services for decommissioning provider boxes are disconnected and
plumbing apparatus including– removed;
sanitary drains or reticulated water supply; and
AND
septic tanks, holding tanks or on-site treatment
systems.
S3.3 A temporary crossing is provided to
protect road reserve infrastructure including
kerb and channel;
AND
Advisory note:
S3.4 Any damage to footpaths, street
An approval will be required from Council’s
plantings, natural vegetation/trees kerb and
Plumbing Section for decommissioning plumbing channel, bridges or roadways at the removal
apparatus including– site, the new site or between the sites is
sanitary drains or reticulated water supply; and repaired or reinstated to at least pre-existing
septic tanks, holding tanks or on-site conditions.
treatment systems.
14.87 Amenity and environmental protection
O4 Waste materials are removed from the site S4.1 Waste materials are removed from the
to avoid causing unhealthy conditions site.
97
Building Removal and Demolition Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB)Related documentPublic source context ↗Public source context ↗Public source context ↗
2017-06-06-p-e-agenda-attachment-1-to-item-6-draft-alignment-amendments-part-1-pages-1-907-pdfRelated documentPublic source context ↗
About this file
- File size
- 18.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.