Council archive · source document
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
column 1 column 2
Including amendments to 3 July 2017
Specific Outcomes Acceptable solutions (if self-
The Noosa Plan
assessableaccepted development subject to
requirements)
Probable solutions (if code assessablecode
assessment)
including--
a) potential fire hazard;
b) ponding of water; and
c) breeding of vermin; S5.1 Erosion and sediment control measures
AND are installed and maintained until soils are
O5 The potential for movement from the site, stabilised by vegetation or sealed.
of soils or similar materials is minimised;
AND S6.1 If a development permit has not been
issued for the future use of the site—
O6 Vacant sites do not have an adverse a) hard surfaced areas including concrete
impact upon the amenity of the surrounding slabs are removed or covered with a
areas. minimum of 300mm of soil; and
b) disturbed areas are revegetated using
species identified in PSP3 – Landscaping
Plants and Guidelines.
Table 14-43 — Removal buildings
column 1 column 2
Specific Outcomes Probable solutions (if code
assessablecode assessment)
14.88 Amenity & Safety
O7 The removal building does not have an S7.1 Any part of the building that is
adverse impact on the amenity of the premises or affected by termite attack, borers, dry rot or
surrounding premises. severe weathering is repaired or replaced
using new or sound second-hand materials;
Editor’s note AND
Council’s Waste and Environmental Health Section S7.2 Any part of the building that is
has guidelines for the transportation and disposal of damaged as a consequence of relocation is
building materials containing asbestos. locally, repaired using new or sound second-hand
asbestos can only be disposed of at Council’s landfill materials;
at Eumundi Road Noosaville. AND
S7.3 Where located in a town or village,
external surfaces of the building, including
Advisory note the roof, are cleaned and painted.
Council’s Environmental Health Section has
guidelines for the transportation and disposal of
building materials containing asbestos. locally,
asbestos can only be disposed of at Council’s landfill
at Eumundi Road Noosaville.
O8 The building does not contribute to an S8.1 All building materials containing
increased health risk to users or others. asbestos, including asbestos cement
sheeting or roofing and lagging, are
Editor’s Note: removed from the building prior to
Council may require a report identifying any asbestos relocation;
products and how they may be managed to avoid health AND
risks. S8.2 All building materials containing
asbestos products are disposed of in
Advisory Note accordance with industry best practice.
Council may require a report identifying any asbestos
products and how they may be managed to avoid health
98
Building Removal and Demolition Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB)Related documentPublic source context ↗Public source context ↗Public source context ↗
2017-06-06-p-e-agenda-attachment-1-to-item-6-draft-alignment-amendments-part-1-pages-1-907-pdfRelated documentPublic source context ↗
About this file
- File size
- 18.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.