Table 14-44 — Building works
Including amendments to 3 July 2017
column 1 column 2
The Noosa Plan
Specific Outcomes Acceptable solutions (if self-
assessableaccepted development subject to
requirements)
Probable solutions (if code assessablecode
assessment)
14.94 Siting
Setbacks
O1 Buildings and other structures are S1.1 The minimum setback of buildings and
appropriately designed and sited to— structures from boundaries is not less than the
a) provide amenity for users of the premises minimum specified in Schedule 1.
as well as preserve the visual and
acoustic privacy of adjoining and nearby Alternative provision to QDC.
land uses;
b) preserve any existing vegetation that will
buffer the proposed building from
adjoining uses;
c) allow for landscaping to be provided
between buildings;
d) maintain the visual continuity and pattern
of buildings and landscape elements
within the street;
e) for class 10a buildings, do not visually
dominate the street;
f) avoid any significant adverse impacts on
the natural values of watercourses and
their foreshores, including those of the
Noosa River and its lakes; and
g) do not interrupt the natural cycles of
erosion and accretion of watercourses and
foreshore areas.
25
Flooding, drainage and earthworks
O2 Buildings and other works are designed S2.1 For new buildings or additions of more
2
and sited to— than 50m gross floor area to an existing
a) provide flood free access to premises and building, floor levels of habitable rooms are—
flood free habitable areas; a) for areas where minimum floor levels are
b) allow only minor, short term and available, not less than the specified level;
infrequent flooding of non-habitable areas; b) for areas where flood modelling is
c) ensure drainage does not adversely available, a minimum of 300mm above the
impact upon other premises; and modelled flood level; and
d) ensure filling, excavation or retaining c) for areas where flood modelling is not
strctures do not adversely impact upon available, a minimum of 300mm above the
other premises by— highest known flood level;
i. causing ponding of water on the OR
2
site or nearby land; and S2.2 For additions of not more than 50m gross
ii. increasing flooding, which floor area to an existing building—floor levels of
adversely affects the safety or use habitable rooms are not less than the level of
of any land upstream and other habitable rooms in the building;
downstream; AND
iii. adversely affecting the flow of S2.3 Filling, other than for accessways, does
water in any overland flow path; not extend more than 1m beyond the footprint of
and any building, measured from outer walls of the
25
Information on minimum floor levels or flood levels for parts of the Shire are available from Council. These provisions are
not limited to areas shown as Flood Hazard Areas on Overlay Maps OM1.3-9.3.
101
Building Works Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB)Related documentPublic source context ↗Public source context ↗Public source context ↗
2017-06-06-p-e-agenda-attachment-1-to-item-6-draft-alignment-amendments-part-1-pages-1-907-pdfRelated documentPublic source context ↗
About this file
- File size
- 18.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.