Council archive · source document
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
column 1 column 2
Specific Outcomes Acceptable solutions (if self-
Including amendments to 3 July 2017
assessableaccepted development subject to
The Noosa Plan
requirements)
Probable solutions (if code assessablecode
assessment)
OR
S20.2 Where there is no building envelope
existing on the lot, clearing of native vegetation,
other than for a driveway access does not
extend beyond—
a) 30m of a building or 10m of a structure on
lots greater than 10ha;
b) 10m of a building or structure on lots 10ha
or less but more than 0.3ha; or
c) 3m of a building or structure on lots 0.3ha or
less.
14.97 Self-contained units - building works
O21 Building works do not result in an increase S21.1 A Detached House or Community
in the number of self-contained accommodation residence or dwelling unit contains no more
units or dwelling units on a property. than 1 kitchen and 1 laundry.
AND
O22 A Detached house accommodates 1 S22.1 Studios, pavilions or other habitable
household only. outbuildings have a maximum gross floor area
2
of 50m ;
AND
S22.2 No part of a Detached house or
Community residence containing habitable
rooms is more than 25m from another part of
the Detached house or Community
residence.
14.98 Protection of Extractive Resources
O23 Where located within proximity of S23.1 Where located within an extractive
protected extractive resources, building works resource area on Overlay Maps OM1.5—
for Residential Uses and Community Uses OM9.5, residential or community buildings—
incorporate design, orientation, and construction a) are located at least 200m from the
measures that mitigate the effects of noise, Extractive Resource/Processing Area; and
dust, ground vibration, or air blast overpressure b) achieve a minimum sound transmission
from the extractive industry. class rating of 30 for any windows or glass
doors on the wall closest to the Extractive
Resource/Processing Area.
Table 14-45 Removal buildings
14.99 Amenity
O24 The removal building does not have an S24.1 Any part of the removal building that is
adverse impact on the amenity of the premises affected by termite attack, borers, dry rot or
or surrounding premises. severe weathering is repaired or replaced using
new or sound second-hand materials;
Advisory note AND
Council’s Environmental Health Section has S24.2 Any part of the removal building that is
guidelines for the transportation and disposal damaged as a consequence of relocation is
repaired using new or sound second-hand
of building materials containing asbestos.
materials;
Locally, asbestos can only be disposed of at
AND
Council’s landfill at Eumundi Road Noosaville.
109
Building Works Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB)Related documentPublic source context ↗Public source context ↗Public source context ↗
2017-06-06-p-e-agenda-attachment-1-to-item-6-draft-alignment-amendments-part-1-pages-1-907-pdfRelated documentPublic source context ↗
About this file
- File size
- 18.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.