Council archive · source document
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)
Very large file (18.9 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Division 14—Earthworks Code
Including amendments to 3 July 2017
The Noosa Plan
14.115 Earthworks Code
The provisions in this division comprise the Earthworks Code. They are—
compliance with the Earthworks Code (section 14.117);
overall outcomes for the Earthworks Code (section 14.118); and
specific outcomes, acceptable solutions and probable solutions (sections 14.119—
14.120.
14.116 Compliance with the Earthworks Code
Development that is consistent with the specific outcomes in sections 14.119—14.120
complies with the Earthworks Code.
14.117 Overall outcomes for the Earthworks Code
14.117.1 The overall outcomes are the purpose of the Earthworks Code.
14.117.2 The overall outcomes sought for the Earthworks Code are the following—
a) To ensure that earthworks do not unreasonably impact on the natural environment or other
properties with regard to—
i land stability (including differential settlement or expansion in reactive soils);
ii contamination of land;
iii flooding and drainage;
iv groundwater, watercourses and wetlands;
v loss of native remnant or regrowth vegetation; and
b) Earthworks are designed and constructed to be structurally sound.
14.118 Specific outcomes, probable solutions and acceptable solutions for
the Earthworks Code
The specific outcomes sought for the Earthworks Code are included in column 1 of Table
14-52. Acceptable solutions for self-assessableaccepted development development
subject to requirements and probable solutions for code assessablecode assessment
development are included in column 2 of Table 14-52.
Table 14-52 — Earthworks
column 1 column 2
Specific Outcomes Acceptable solutions (if self-
assessableaccepted development subject to
requirements)
Probable solutions (if code assessablecode
assessment)
14.119 Effects of works
Drainage
O1 Finished surface levels ensure land is free S1.1 The finished surface gradient of any filled
draining. or excavated area is within the range 0.5% to
1.5% and drains to Council’s stormwater
infrastructure where available or where
stormwater infrastructure is not available,
toward the street.
128
Earthworks Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB)Related documentPublic source context ↗Public source context ↗Public source context ↗
2017-06-06-p-e-agenda-attachment-1-to-item-6-draft-alignment-amendments-part-1-pages-1-907-pdfRelated documentPublic source context ↗
About this file
- File size
- 18.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.