column 1 column 2
Specific Outcomes Acceptable solutions (if self-
Including amendments to 3 July 2017
assessableaccepted development subject to
The Noosa Plan
requirements)
Probable solutions (if code assessablecode
assessment)
Hydraulics
O2 Any change to the level of the land does No solution provided.
not have an adverse flooding impact on the
flooding and drainage characteristics off-site.
Geotechnical considerations For assessable development—
O3 Earthworks do not result in geotechnical S3.1 Filling works are undertaken in
instability on the premises or nearby premises. accordance with Section 2.8- Filling of Site of
Council’s PSP5 - Engineering Design
Standards- Roads and Drainage & Earthworks
AND
S3.2 Where the filling is for residential
commercial or industrial purposes the works
comply with Australian Standard - Guidelines for
earthworks on commercial & residential
development.
Local amenity
O4 Earthworks do not cause disturbance to S4.1 The following control measures are
the amenity of the neighbouring land. implemented—
a) regular water spraying of exposed
areas to suppress dust;
b) provision of dust stabilised or sealed
internal roads;
c) protective covering of exposed areas
that are left for more than 2 weeks; and
d) if there is no valid development permit
for the site, disturbed areas are
revegetated using species identified in
PSP3 - Landscaping Plants and
Guidelines;
AND
S4.2 Earthworks are undertaken only during
the hours of 7am to 6pm, Monday to Friday and
7am to 6pm on Saturday. No work is
undertaken on Sunday or public holidays.
Vegetative Waste
O5 Vegetation cleared from a development S5.1 Cleared vegetation is transported off-site
site is disposed of in an environmentally for disposal in an approved green waste
responsible manner. disposal facility;
OR
S5.2 Cleared vegetation is mulched on-site and
reused for landscaping of the finished
development;
OR
S5.3 Cleared vegetation is disposed of for the
purpose of firewood. (Note: Disposal of
vegetative waste by burning off is not an
acceptable method of disposal).
Managing contamination risk
O6 Materials used as fill are suitable for S6.1 The fill material is solid clean earth, free of
development of the land and filling or excavation putrescible or refuse material, vegetation, acid
works do not result in the contamination of land. sulfate soils, building or construction material or
other material or contaminants;
129
Earthworks Code
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2017-06-06 - P&E Agenda Attachment 1 to Item 6 Draft Alignment Amendments Part 1 (Pages 1-907)(PDF, 18MB)Related documentPublic source context ↗Public source context ↗Public source context ↗
2017-06-06-p-e-agenda-attachment-1-to-item-6-draft-alignment-amendments-part-1-pages-1-907-pdfRelated documentPublic source context ↗
About this file
- File size
- 18.9 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.